Planning and scheduling for failure recovery system and method
A computer controlled system provides for configuration-specific recovery of operation in a reconfigurable production system having a plurality of modules with a plurality of alternative capabilities for processing work units. The system includes a system controller having planning, scheduling, and...
Saved in:
Main Authors | , |
---|---|
Format | Patent |
Language | English |
Published |
21.11.2006
|
Online Access | Get full text |
Cover
Loading…
Abstract | A computer controlled system provides for configuration-specific recovery of operation in a reconfigurable production system having a plurality of modules with a plurality of alternative capabilities for processing work units. The system includes a system controller having planning, scheduling, and performance failure identification functions. The planning function plans utilization of selected module capabilities in the production of jobs having not less than one work unit and the scheduling function schedules utilization of selected module capabilities in the production of jobs. The failure identification function identifies the failure of module capabilities to perform the work units for a scheduled job. |
---|---|
AbstractList | A computer controlled system provides for configuration-specific recovery of operation in a reconfigurable production system having a plurality of modules with a plurality of alternative capabilities for processing work units. The system includes a system controller having planning, scheduling, and performance failure identification functions. The planning function plans utilization of selected module capabilities in the production of jobs having not less than one work unit and the scheduling function schedules utilization of selected module capabilities in the production of jobs. The failure identification function identifies the failure of module capabilities to perform the work units for a scheduled job. |
Author | Bobrow, Daniel G Fromherz, Markus P. J |
Author_xml | – sequence: 1 givenname: Markus P. J surname: Fromherz fullname: Fromherz, Markus P. J – sequence: 2 givenname: Daniel G surname: Bobrow fullname: Bobrow, Daniel G |
BookMark | eNrjYmDJy89L5WSwC8hJzMvLzEtXSMxLUShOzkhNKc0BcdPyixTSEjNzSotSFYpSk_PLUosqFYori0tSc8FKc1NLMvJTeBhY0xJzilN5oTQ3g4Kba4izh25pcUFiSWpeSXF8elEiiDIwNzS2NDOyNCZCCQA_KzNi |
ContentType | Patent |
CorporateAuthor | Palo Alto Research Center Incorporated |
CorporateAuthor_xml | – name: Palo Alto Research Center Incorporated |
DBID | EFH |
DatabaseName | USPTO Issued Patents |
DatabaseTitleList | |
Database_xml | – sequence: 1 dbid: EFH name: USPTO Issued Patents url: http://www.uspto.gov/patft/index.html sourceTypes: Open Access Repository |
DeliveryMethod | fulltext_linktorsrc |
ExternalDocumentID | 07139629 |
GroupedDBID | EFH |
ID | FETCH-uspatents_grants_071396293 |
IEDL.DBID | EFH |
IngestDate | Sun Mar 05 22:31:38 EST 2023 |
IsOpenAccess | true |
IsPeerReviewed | false |
IsScholarly | false |
Language | English |
LinkModel | DirectLink |
MergedId | FETCHMERGED-uspatents_grants_071396293 |
OpenAccessLink | https://image-ppubs.uspto.gov/dirsearch-public/print/downloadPdf/7139629 |
ParticipantIDs | uspatents_grants_07139629 |
PatentNumber | 7139629 |
PublicationCentury | 2000 |
PublicationDate | 20061121 |
PublicationDateYYYYMMDD | 2006-11-21 |
PublicationDate_xml | – month: 11 year: 2006 text: 20061121 day: 21 |
PublicationDecade | 2000 |
PublicationYear | 2006 |
References | Fiszman et al. (6115646) 20000900 European Search Report for EPO Counterpart Application No. 04009991.3 Sep. 28, 2004. Zweben et al. (6216109) 20010400 Toprac et al. (6785586) 20040800 (WO 96/40558) 19961200 Lever, J. et al., "Constraint Logic Programming for Scheduling and Planning", BT Technology Journal, BT Laboratories, vol. 12, No. 4, Oct. 1994, pp. 73-80. Farrell et al. (5095342) 19920300 Rifkin (5826104) 19981000 Hohkibara et al. (6438436) 20020800 Bazzocchi et al. (6999829) 20060200 Fromherz et al. (5696893) 19971200 Ryskoski (6978187) 20051200 Muller, T., "Practical Investigation of Constraints with Graph Views", Principles and Practice of Constraint Programming CP 2000, 6th International Conference, vol. 1894, Sep. 2000, pp. 320-336. Cherneff et al. (6233493) 20010500 U.S. Appl. No. 10/284,560, titled "Planning and Scheduling Reconfigurable Systems with Regular and Diagnostic Jobs" to Markus P.J. Fromherz, filed Oct. 30, 2002. Yang et al. (5557367) 19960900 Farrell et al. (5159395) 19921000 |
References_xml | – year: 19981000 ident: 5826104 contributor: fullname: Rifkin – year: 19921000 ident: 5159395 contributor: fullname: Farrell et al. – year: 20051200 ident: 6978187 contributor: fullname: Ryskoski – year: 19920300 ident: 5095342 contributor: fullname: Farrell et al. – year: 20060200 ident: 6999829 contributor: fullname: Bazzocchi et al. – year: 19961200 ident: WO 96/40558 – year: 20010500 ident: 6233493 contributor: fullname: Cherneff et al. – year: 19971200 ident: 5696893 contributor: fullname: Fromherz et al. – year: 20040800 ident: 6785586 contributor: fullname: Toprac et al. – year: 19960900 ident: 5557367 contributor: fullname: Yang et al. – year: 20000900 ident: 6115646 contributor: fullname: Fiszman et al. – year: 20010400 ident: 6216109 contributor: fullname: Zweben et al. – year: 20020800 ident: 6438436 contributor: fullname: Hohkibara et al. |
Score | 2.6642818 |
Snippet | A computer controlled system provides for configuration-specific recovery of operation in a reconfigurable production system having a plurality of modules with... |
SourceID | uspatents |
SourceType | Open Access Repository |
Title | Planning and scheduling for failure recovery system and method |
URI | https://image-ppubs.uspto.gov/dirsearch-public/print/downloadPdf/7139629 |
hasFullText | 1 |
inHoldings | 1 |
isFullTextHit | |
isPrint | |
link | http://utb.summon.serialssolutions.com/2.0.0/link/0/eLvHCXMwfV1LSwMxEB7aIqgnRcX6Igev0WTNbjYXL9JlEZQeFHor2exEBN2W7hbx3zvJavGi1yRMhjxm5kvmAXCpnPMo04rnaea50t5x42OgbuWc8pl18Svm4TErn9X9LJ0NoNzEwrzTNeJL4qW9WrfLbhGdK0m89xvP--TPIUdgE7IPfDRvC1tPa39NYMtkiRnCMBfBtWtSlLuwTSTIZGu69pfSKPZgaxpb92GAzQHc_tQHYgTeGYFKEvIhFpyR2ci8fQ3-4SzgUzpcn6zPsByH9kWeD4EVk6e7km8mm7-sghPLXHwzdXMEIwLzeAxMS4tJVRvU3irrMRcVahQolBZaCzOG8Z9kTv7pO4Wd-DggJU_kGYy61RrPSV121UVciy_6eXd1 |
link.rule.ids | 230,309,786,808,891,64394 |
linkProvider | USPTO |
linkToPdf | http://utb.summon.serialssolutions.com/2.0.0/link/0/eLvHCXMwfV07T8MwED6VgnhMIECUpwdWgxOcuF5YoFF4VRlA6hY5jo2QSlo1qSr-fc8OVCyw2tbZ8uPuPvvuM8Al19qaICpoP4ot5cJqKq1P1C205jZW2j_FvAzj9I0_jqJRB9JVLswnHiM6xbHUV_N62kx8cCWq93bhaUv-7DgCK8c-sKjGE1Vmpb1GsCXjUK7BurOxjkV_kKQ7sIVC0GmrmvqX2Uh2YSPzpXvQMdU-3P78EEQQvhOElajmXTY4QceRWPXhIsSJQ6i4vb5Iy7Hsm7bfPB8ASQavdylddZa_z1wYS86-h3VzCF2E8-YIiAiUCYtSGmEVV9b0WWGEYYZxwYRgsge9P8Uc_1N3AZvZfZI_PwyfTmDb3xQEAQ2DU-g2s7k5Q9vZFOd-Wpb_BHpv |
openUrl | ctx_ver=Z39.88-2004&ctx_enc=info%3Aofi%2Fenc%3AUTF-8&rfr_id=info%3Asid%2Fsummon.serialssolutions.com&rft_val_fmt=info%3Aofi%2Ffmt%3Akev%3Amtx%3Apatent&rft.title=Planning+and+scheduling+for+failure+recovery+system+and+method&rft.inventor=Fromherz%2C+Markus+P.+J&rft.inventor=Bobrow%2C+Daniel+G&rft.number=7139629&rft.date=2006-11-21&rft.externalDBID=n%2Fa&rft.externalDocID=07139629 |