ADECO full-face tunnel excavation of two 260 m super(2) tubes in clays with sub-horizontal jet-grouting under minimal urban cover
With a cover of 5-30 m, a 260 m super(2) cross-sectional area, and a 4-m wide pillar, the Cassia twin road tunnels underpass Cassia road (main road to/from Rome), the remnants of a 2000 year-old Roman villa, and two existing tunnels. Stiff silty clay dominates the alignment. According to the Analysi...
Saved in:
Published in | Tunnelling and underground space technology Vol. 26; no. 2; pp. 253 - 266 |
---|---|
Main Author | |
Format | Journal Article |
Language | English |
Published |
01.03.2011
|
Subjects | |
Online Access | Get full text |
Cover
Loading…
Be the first to leave a comment!