Brenner base tunnel, construction lot H41 Sill Gorge–Pfons: challenges based on previous construction lots in the project area
The construction lot H41 Sill Gorge–Pfons is one of the biggest construction lots of the Brenner base tunnel and carries out the work on the Austrian side between Austria and Italy. It is situated between the Sill Gorge in Innsbruck and the small mountain village of Pfons. Here, tunnel excavation an...
Saved in:
Published in | Geomechanik und Tunnelbau Vol. 16; no. 4; pp. 353 - 369 |
---|---|
Main Authors | , , , , , |
Format | Journal Article |
Language | English |
Published |
Berlin
Wiley Subscription Services, Inc
01.08.2023
|
Subjects | |
Online Access | Get full text |
Cover
Loading…
Abstract | The construction lot H41 Sill Gorge–Pfons is one of the biggest construction lots of the Brenner base tunnel and carries out the work on the Austrian side between Austria and Italy. It is situated between the Sill Gorge in Innsbruck and the small mountain village of Pfons. Here, tunnel excavation and inner lining concrete works are carried out based on existing caverns and tunnels made by previous construction lots E41, Sill Gorge and H33 Tulfes–Pfons. The construction lot H41 Sill Gorge–Pfons started in January 2022 with preparation works, and will take 80 months of continuous construction work to complete. All together about 22.5 km of main tubes, 38 bypasses and the remaining parts of the underground Innsbruck emergency station/stop will be excavated by the drill and blast method and by mechanised means (TBM). Additionally, concrete inner lining works will be executed partly alongside the excavation works. In the connection tunnels which are already finished and link the existing Innsbruck bypass with the new Brenner base tunnel, barrier walls are being erected and a new long‐distance water flushing system is being implemented. The limited surface areas in this mountainous region present a huge challenge for logistics and storage as well as on‐site operations for the execution of this complex underground construction lot. |
---|---|
AbstractList | The construction lot H41 Sill Gorge–Pfons is one of the biggest construction lots of the Brenner base tunnel and carries out the work on the Austrian side between Austria and Italy. It is situated between the Sill Gorge in Innsbruck and the small mountain village of Pfons. Here, tunnel excavation and inner lining concrete works are carried out based on existing caverns and tunnels made by previous construction lots E41, Sill Gorge and H33 Tulfes–Pfons. The construction lot H41 Sill Gorge–Pfons started in January 2022 with preparation works, and will take 80 months of continuous construction work to complete. All together about 22.5 km of main tubes, 38 bypasses and the remaining parts of the underground Innsbruck emergency station/stop will be excavated by the drill and blast method and by mechanised means (TBM). Additionally, concrete inner lining works will be executed partly alongside the excavation works. In the connection tunnels which are already finished and link the existing Innsbruck bypass with the new Brenner base tunnel, barrier walls are being erected and a new long‐distance water flushing system is being implemented. The limited surface areas in this mountainous region present a huge challenge for logistics and storage as well as on‐site operations for the execution of this complex underground construction lot. |
Author | Radončić, Nedim Staffel, Oliver Priller, Anton Reith, Marco Insam, Romed Mössmer, Stefan |
Author_xml | – sequence: 1 givenname: Romed surname: Insam fullname: Insam, Romed – sequence: 2 givenname: Stefan surname: Mössmer fullname: Mössmer, Stefan – sequence: 3 givenname: Nedim surname: Radončić fullname: Radončić, Nedim – sequence: 4 givenname: Anton surname: Priller fullname: Priller, Anton – sequence: 5 givenname: Oliver surname: Staffel fullname: Staffel, Oliver – sequence: 6 givenname: Marco surname: Reith fullname: Reith, Marco |
BookMark | eNqNzLtOw0AQBdAVChIhpKUeiZYk-7DXhhJESIkEfbSYiWNrNQP7oM4_8Id8CSuEaGio5o7u0T0VE2JCIc6VXCop9apHTksttZHl00diqlpbLxrTXk1-s9UnYh7jWIg0qmoaOxWHm4BEGODZRYSUS_aX0DHFFHKXBibwnGBTKXgcvId7Dj1-Hj4edoVcQ7d33iP1GL8HXqD414DvA-f4ZyXCQJD2WASP2CVwAd2ZON45H3H-c2fiYn33dLtZFPSWMabtyDlQqba6rRpb17Y15n_qCxOzWoM |
ContentType | Journal Article |
Copyright | 2023 Ernst & Sohn GmbH |
Copyright_xml | – notice: 2023 Ernst & Sohn GmbH |
DBID | 7UA 8FD C1K F1W FR3 H96 KR7 L.G |
DOI | 10.1002/geot.202300022 |
DatabaseName | Water Resources Abstracts Technology Research Database Environmental Sciences and Pollution Management ASFA: Aquatic Sciences and Fisheries Abstracts Engineering Research Database Aquatic Science & Fisheries Abstracts (ASFA) 2: Ocean Technology, Policy & Non-Living Resources Civil Engineering Abstracts Aquatic Science & Fisheries Abstracts (ASFA) Professional |
DatabaseTitle | Civil Engineering Abstracts Aquatic Science & Fisheries Abstracts (ASFA) Professional Aquatic Science & Fisheries Abstracts (ASFA) 2: Ocean Technology, Policy & Non-Living Resources Technology Research Database ASFA: Aquatic Sciences and Fisheries Abstracts Engineering Research Database Water Resources Abstracts Environmental Sciences and Pollution Management |
DatabaseTitleList | Civil Engineering Abstracts |
DeliveryMethod | fulltext_linktorsrc |
Discipline | Engineering |
EISSN | 1865-7389 |
EndPage | 369 |
GroupedDBID | .3N .GA 05W 0R~ 10A 1OC 33P 3SF 4.4 50Y 50Z 51W 51X 52M 52N 52O 52P 52S 52T 52U 52W 52X 5GY 5VS 702 7PT 7UA 8-0 8-1 8-3 8-4 8-5 8FD 8UM 930 A03 AAESR AAEVG AAHHS AANLZ AAONW AAXRX AAZKR ABCUV ABDBF ABJNI ABPVW ACAHQ ACCFJ ACCZN ACGFS ACIWK ACPOU ACXBN ACXQS ADEOM ADIZJ ADMGS ADOZA ADXAS ADZOD AEEZP AEIGN AEIMD AEQDE AEUQT AEUYR AFBPY AFFPM AFGKR AFPWT AFRAH AHBTC AITYG AIURR AIWBW AJBDE AJXKR ALAGY ALMA_UNASSIGNED_HOLDINGS ALUQN AMBMR AMYDB ATUGU AUFTA AZBYB AZVAB BAFTC BFHJK BHBCM BMNLL BMXJE BNHUX BROTX BRXPI BY8 C1K CS3 D-E D-F DCZOG DPXWK DRFUL DRSTM EBS ESX F00 F01 F04 F1W FR3 G-S G.N GODZA H.T H.X H96 HGLYW HZ~ I-F J0M KR7 L.G LATKE LC2 LC3 LEEKS LH4 LITHE LOXES LP6 LP7 LUTES LYRES MEWTI MK4 MK~ MM- MRFUL MRSTM MSFUL MSSTM MXFUL MXSTM N04 N05 N9A NF~ O66 O9- OIG P2W P2X P4D Q.N Q11 QB0 R.K ROL RWI RX1 SUPJJ UB1 W8V W99 WBKPD WIH WIK WLBEL WOHZO WXSBR WYISQ XG1 XV2 ZZTAW ~02 ~IA ~WT |
ID | FETCH-proquest_journals_28476556833 |
ISSN | 1865-7362 |
IngestDate | Fri Sep 13 06:13:20 EDT 2024 |
IsPeerReviewed | true |
IsScholarly | true |
Issue | 4 |
Language | English |
LinkModel | OpenURL |
MergedId | FETCHMERGED-proquest_journals_28476556833 |
PQID | 2847655683 |
PQPubID | 866391 |
ParticipantIDs | proquest_journals_2847655683 |
PublicationCentury | 2000 |
PublicationDate | 20230801 |
PublicationDateYYYYMMDD | 2023-08-01 |
PublicationDate_xml | – month: 08 year: 2023 text: 20230801 day: 01 |
PublicationDecade | 2020 |
PublicationPlace | Berlin |
PublicationPlace_xml | – name: Berlin |
PublicationTitle | Geomechanik und Tunnelbau |
PublicationYear | 2023 |
Publisher | Wiley Subscription Services, Inc |
Publisher_xml | – name: Wiley Subscription Services, Inc |
SSID | ssj0000314776 ssib004858016 |
Score | 4.587337 |
Snippet | The construction lot H41 Sill Gorge–Pfons is one of the biggest construction lots of the Brenner base tunnel and carries out the work on the Austrian side... |
SourceID | proquest |
SourceType | Aggregation Database |
StartPage | 353 |
SubjectTerms | Boring machines Construction Dredging Excavation Tubes Tunnel construction Tunnels Underground construction |
Title | Brenner base tunnel, construction lot H41 Sill Gorge–Pfons: challenges based on previous construction lots in the project area |
URI | https://www.proquest.com/docview/2847655683/abstract/ |
Volume | 16 |
hasFullText | 1 |
inHoldings | 1 |
isFullTextHit | |
isPrint | |
link | http://utb.summon.serialssolutions.com/2.0.0/link/0/eLvHCXMwnZ3BTttAEEBXIbnAoaItCChUK5WbG0i8aztwS4AkqhCtgpFyizbxBkUEu4qTS0_8Az_GN_RLOrNerxdSRcDFiRxrbGeeZ2bXszOEHJ6IIBDwEEHk5nswQJGiKsDPVOuR58N4iGPFcsy2uPK7N_xH3-uXSk9W1tJiPjwa_fnvupL3aBX2gV5xlewbNGuEwg74DvqFLWgYtq_ScWuGZnLmoCty5gtMWcG_bJQUZWGdaTJ3urzuXE-mU6eDE-B5fgP7NYYDcUpglHdUSZWoCN8g_Mb8X8yPfSktzVMj9SSOIyDutGPcjkzuJS4ontxhl10nVBc2FAuDYZxmGPZw6b9ROb6zb_lYJnSm88_GBbo9gV1HMPI9n6iPQHEMrvfeWPeZWdfYxM7I9oSGy0w63WvNpmWuGwBYwLQ9l_a-rDGRsfG-xTK3DDbLShVr38-ytjFLbiUrU3srE8y-hUEbRj6FA82TBq5-Dto3l5eD8KIfrpGKG5x4QZlUmq3zVruwkQ0PggLfzANi-4BA9UA0N5PXFq25x89PuRQvqCAo3CQf9OiFNjMUP5KSjD-RDaum5WfyoKGkSBLNoPxObYgoQEQBSYpIUoXk34dHBeMpLVBUAiIKx-coLklJ6SSmgCLVKFJEcYt8a1-EZ91qfhMD_SylAwySfCyGx9g2KcdJLHcIZZGH1eM4H9fGvM5rDS6C0ZBx15URj5jYJfurJO2t_vkLWS_o2ydluHx5AAHmfPhV6-wfKTKB6A |
link.rule.ids | 315,786,790,27957,27958 |
linkProvider | EBSCOhost |
openUrl | ctx_ver=Z39.88-2004&ctx_enc=info%3Aofi%2Fenc%3AUTF-8&rfr_id=info%3Asid%2Fsummon.serialssolutions.com&rft_val_fmt=info%3Aofi%2Ffmt%3Akev%3Amtx%3Ajournal&rft.genre=article&rft.atitle=Brenner+base+tunnel%2C+construction+lot+H41+Sill+Gorge%E2%80%93Pfons%3A+challenges+based+on+previous+construction+lots+in+the+project+area&rft.jtitle=Geomechanik+und+Tunnelbau&rft.au=Insam%2C+Romed&rft.au=M%C3%B6ssmer%2C+Stefan&rft.au=Radon%C4%8Di%C4%87%2C+Nedim&rft.au=Priller%2C+Anton&rft.date=2023-08-01&rft.pub=Wiley+Subscription+Services%2C+Inc&rft.issn=1865-7362&rft.eissn=1865-7389&rft.volume=16&rft.issue=4&rft.spage=353&rft.epage=369&rft_id=info:doi/10.1002%2Fgeot.202300022&rft.externalDBID=NO_FULL_TEXT |
thumbnail_l | http://covers-cdn.summon.serialssolutions.com/index.aspx?isbn=/lc.gif&issn=1865-7362&client=summon |
thumbnail_m | http://covers-cdn.summon.serialssolutions.com/index.aspx?isbn=/mc.gif&issn=1865-7362&client=summon |
thumbnail_s | http://covers-cdn.summon.serialssolutions.com/index.aspx?isbn=/sc.gif&issn=1865-7362&client=summon |