Brenner base tunnel, construction lot H41 Sill Gorge–Pfons: challenges based on previous construction lots in the project area

The construction lot H41 Sill Gorge–Pfons is one of the biggest construction lots of the Brenner base tunnel and carries out the work on the Austrian side between Austria and Italy. It is situated between the Sill Gorge in Innsbruck and the small mountain village of Pfons. Here, tunnel excavation an...

Full description

Saved in:
Bibliographic Details
Published inGeomechanik und Tunnelbau Vol. 16; no. 4; pp. 353 - 369
Main Authors Insam, Romed, Mössmer, Stefan, Radončić, Nedim, Priller, Anton, Staffel, Oliver, Reith, Marco
Format Journal Article
LanguageEnglish
Published Berlin Wiley Subscription Services, Inc 01.08.2023
Subjects
Online AccessGet full text

Cover

Loading…
Abstract The construction lot H41 Sill Gorge–Pfons is one of the biggest construction lots of the Brenner base tunnel and carries out the work on the Austrian side between Austria and Italy. It is situated between the Sill Gorge in Innsbruck and the small mountain village of Pfons. Here, tunnel excavation and inner lining concrete works are carried out based on existing caverns and tunnels made by previous construction lots E41, Sill Gorge and H33 Tulfes–Pfons. The construction lot H41 Sill Gorge–Pfons started in January 2022 with preparation works, and will take 80 months of continuous construction work to complete. All together about 22.5 km of main tubes, 38 bypasses and the remaining parts of the underground Innsbruck emergency station/stop will be excavated by the drill and blast method and by mechanised means (TBM). Additionally, concrete inner lining works will be executed partly alongside the excavation works. In the connection tunnels which are already finished and link the existing Innsbruck bypass with the new Brenner base tunnel, barrier walls are being erected and a new long‐distance water flushing system is being implemented. The limited surface areas in this mountainous region present a huge challenge for logistics and storage as well as on‐site operations for the execution of this complex underground construction lot.
AbstractList The construction lot H41 Sill Gorge–Pfons is one of the biggest construction lots of the Brenner base tunnel and carries out the work on the Austrian side between Austria and Italy. It is situated between the Sill Gorge in Innsbruck and the small mountain village of Pfons. Here, tunnel excavation and inner lining concrete works are carried out based on existing caverns and tunnels made by previous construction lots E41, Sill Gorge and H33 Tulfes–Pfons. The construction lot H41 Sill Gorge–Pfons started in January 2022 with preparation works, and will take 80 months of continuous construction work to complete. All together about 22.5 km of main tubes, 38 bypasses and the remaining parts of the underground Innsbruck emergency station/stop will be excavated by the drill and blast method and by mechanised means (TBM). Additionally, concrete inner lining works will be executed partly alongside the excavation works. In the connection tunnels which are already finished and link the existing Innsbruck bypass with the new Brenner base tunnel, barrier walls are being erected and a new long‐distance water flushing system is being implemented. The limited surface areas in this mountainous region present a huge challenge for logistics and storage as well as on‐site operations for the execution of this complex underground construction lot.
Author Radončić, Nedim
Staffel, Oliver
Priller, Anton
Reith, Marco
Insam, Romed
Mössmer, Stefan
Author_xml – sequence: 1
  givenname: Romed
  surname: Insam
  fullname: Insam, Romed
– sequence: 2
  givenname: Stefan
  surname: Mössmer
  fullname: Mössmer, Stefan
– sequence: 3
  givenname: Nedim
  surname: Radončić
  fullname: Radončić, Nedim
– sequence: 4
  givenname: Anton
  surname: Priller
  fullname: Priller, Anton
– sequence: 5
  givenname: Oliver
  surname: Staffel
  fullname: Staffel, Oliver
– sequence: 6
  givenname: Marco
  surname: Reith
  fullname: Reith, Marco
BookMark eNqNzLtOw0AQBdAVChIhpKUeiZYk-7DXhhJESIkEfbSYiWNrNQP7oM4_8Id8CSuEaGio5o7u0T0VE2JCIc6VXCop9apHTksttZHl00diqlpbLxrTXk1-s9UnYh7jWIg0qmoaOxWHm4BEGODZRYSUS_aX0DHFFHKXBibwnGBTKXgcvId7Dj1-Hj4edoVcQ7d33iP1GL8HXqD414DvA-f4ZyXCQJD2WASP2CVwAd2ZON45H3H-c2fiYn33dLtZFPSWMabtyDlQqba6rRpb17Y15n_qCxOzWoM
ContentType Journal Article
Copyright 2023 Ernst & Sohn GmbH
Copyright_xml – notice: 2023 Ernst & Sohn GmbH
DBID 7UA
8FD
C1K
F1W
FR3
H96
KR7
L.G
DOI 10.1002/geot.202300022
DatabaseName Water Resources Abstracts
Technology Research Database
Environmental Sciences and Pollution Management
ASFA: Aquatic Sciences and Fisheries Abstracts
Engineering Research Database
Aquatic Science & Fisheries Abstracts (ASFA) 2: Ocean Technology, Policy & Non-Living Resources
Civil Engineering Abstracts
Aquatic Science & Fisheries Abstracts (ASFA) Professional
DatabaseTitle Civil Engineering Abstracts
Aquatic Science & Fisheries Abstracts (ASFA) Professional
Aquatic Science & Fisheries Abstracts (ASFA) 2: Ocean Technology, Policy & Non-Living Resources
Technology Research Database
ASFA: Aquatic Sciences and Fisheries Abstracts
Engineering Research Database
Water Resources Abstracts
Environmental Sciences and Pollution Management
DatabaseTitleList Civil Engineering Abstracts
DeliveryMethod fulltext_linktorsrc
Discipline Engineering
EISSN 1865-7389
EndPage 369
GroupedDBID .3N
.GA
05W
0R~
10A
1OC
33P
3SF
4.4
50Y
50Z
51W
51X
52M
52N
52O
52P
52S
52T
52U
52W
52X
5GY
5VS
702
7PT
7UA
8-0
8-1
8-3
8-4
8-5
8FD
8UM
930
A03
AAESR
AAEVG
AAHHS
AANLZ
AAONW
AAXRX
AAZKR
ABCUV
ABDBF
ABJNI
ABPVW
ACAHQ
ACCFJ
ACCZN
ACGFS
ACIWK
ACPOU
ACXBN
ACXQS
ADEOM
ADIZJ
ADMGS
ADOZA
ADXAS
ADZOD
AEEZP
AEIGN
AEIMD
AEQDE
AEUQT
AEUYR
AFBPY
AFFPM
AFGKR
AFPWT
AFRAH
AHBTC
AITYG
AIURR
AIWBW
AJBDE
AJXKR
ALAGY
ALMA_UNASSIGNED_HOLDINGS
ALUQN
AMBMR
AMYDB
ATUGU
AUFTA
AZBYB
AZVAB
BAFTC
BFHJK
BHBCM
BMNLL
BMXJE
BNHUX
BROTX
BRXPI
BY8
C1K
CS3
D-E
D-F
DCZOG
DPXWK
DRFUL
DRSTM
EBS
ESX
F00
F01
F04
F1W
FR3
G-S
G.N
GODZA
H.T
H.X
H96
HGLYW
HZ~
I-F
J0M
KR7
L.G
LATKE
LC2
LC3
LEEKS
LH4
LITHE
LOXES
LP6
LP7
LUTES
LYRES
MEWTI
MK4
MK~
MM-
MRFUL
MRSTM
MSFUL
MSSTM
MXFUL
MXSTM
N04
N05
N9A
NF~
O66
O9-
OIG
P2W
P2X
P4D
Q.N
Q11
QB0
R.K
ROL
RWI
RX1
SUPJJ
UB1
W8V
W99
WBKPD
WIH
WIK
WLBEL
WOHZO
WXSBR
WYISQ
XG1
XV2
ZZTAW
~02
~IA
~WT
ID FETCH-proquest_journals_28476556833
ISSN 1865-7362
IngestDate Fri Sep 13 06:13:20 EDT 2024
IsPeerReviewed true
IsScholarly true
Issue 4
Language English
LinkModel OpenURL
MergedId FETCHMERGED-proquest_journals_28476556833
PQID 2847655683
PQPubID 866391
ParticipantIDs proquest_journals_2847655683
PublicationCentury 2000
PublicationDate 20230801
PublicationDateYYYYMMDD 2023-08-01
PublicationDate_xml – month: 08
  year: 2023
  text: 20230801
  day: 01
PublicationDecade 2020
PublicationPlace Berlin
PublicationPlace_xml – name: Berlin
PublicationTitle Geomechanik und Tunnelbau
PublicationYear 2023
Publisher Wiley Subscription Services, Inc
Publisher_xml – name: Wiley Subscription Services, Inc
SSID ssj0000314776
ssib004858016
Score 4.587337
Snippet The construction lot H41 Sill Gorge–Pfons is one of the biggest construction lots of the Brenner base tunnel and carries out the work on the Austrian side...
SourceID proquest
SourceType Aggregation Database
StartPage 353
SubjectTerms Boring machines
Construction
Dredging
Excavation
Tubes
Tunnel construction
Tunnels
Underground construction
Title Brenner base tunnel, construction lot H41 Sill Gorge–Pfons: challenges based on previous construction lots in the project area
URI https://www.proquest.com/docview/2847655683/abstract/
Volume 16
hasFullText 1
inHoldings 1
isFullTextHit
isPrint
link http://utb.summon.serialssolutions.com/2.0.0/link/0/eLvHCXMwnZ3BTttAEEBXIbnAoaItCChUK5WbG0i8aztwS4AkqhCtgpFyizbxBkUEu4qTS0_8Az_GN_RLOrNerxdSRcDFiRxrbGeeZ2bXszOEHJ6IIBDwEEHk5nswQJGiKsDPVOuR58N4iGPFcsy2uPK7N_xH3-uXSk9W1tJiPjwa_fnvupL3aBX2gV5xlewbNGuEwg74DvqFLWgYtq_ScWuGZnLmoCty5gtMWcG_bJQUZWGdaTJ3urzuXE-mU6eDE-B5fgP7NYYDcUpglHdUSZWoCN8g_Mb8X8yPfSktzVMj9SSOIyDutGPcjkzuJS4ontxhl10nVBc2FAuDYZxmGPZw6b9ROb6zb_lYJnSm88_GBbo9gV1HMPI9n6iPQHEMrvfeWPeZWdfYxM7I9oSGy0w63WvNpmWuGwBYwLQ9l_a-rDGRsfG-xTK3DDbLShVr38-ytjFLbiUrU3srE8y-hUEbRj6FA82TBq5-Dto3l5eD8KIfrpGKG5x4QZlUmq3zVruwkQ0PggLfzANi-4BA9UA0N5PXFq25x89PuRQvqCAo3CQf9OiFNjMUP5KSjD-RDaum5WfyoKGkSBLNoPxObYgoQEQBSYpIUoXk34dHBeMpLVBUAiIKx-coLklJ6SSmgCLVKFJEcYt8a1-EZ91qfhMD_SylAwySfCyGx9g2KcdJLHcIZZGH1eM4H9fGvM5rDS6C0ZBx15URj5jYJfurJO2t_vkLWS_o2ydluHx5AAHmfPhV6-wfKTKB6A
link.rule.ids 315,786,790,27957,27958
linkProvider EBSCOhost
openUrl ctx_ver=Z39.88-2004&ctx_enc=info%3Aofi%2Fenc%3AUTF-8&rfr_id=info%3Asid%2Fsummon.serialssolutions.com&rft_val_fmt=info%3Aofi%2Ffmt%3Akev%3Amtx%3Ajournal&rft.genre=article&rft.atitle=Brenner+base+tunnel%2C+construction+lot+H41+Sill+Gorge%E2%80%93Pfons%3A+challenges+based+on+previous+construction+lots+in+the+project+area&rft.jtitle=Geomechanik+und+Tunnelbau&rft.au=Insam%2C+Romed&rft.au=M%C3%B6ssmer%2C+Stefan&rft.au=Radon%C4%8Di%C4%87%2C+Nedim&rft.au=Priller%2C+Anton&rft.date=2023-08-01&rft.pub=Wiley+Subscription+Services%2C+Inc&rft.issn=1865-7362&rft.eissn=1865-7389&rft.volume=16&rft.issue=4&rft.spage=353&rft.epage=369&rft_id=info:doi/10.1002%2Fgeot.202300022&rft.externalDBID=NO_FULL_TEXT
thumbnail_l http://covers-cdn.summon.serialssolutions.com/index.aspx?isbn=/lc.gif&issn=1865-7362&client=summon
thumbnail_m http://covers-cdn.summon.serialssolutions.com/index.aspx?isbn=/mc.gif&issn=1865-7362&client=summon
thumbnail_s http://covers-cdn.summon.serialssolutions.com/index.aspx?isbn=/sc.gif&issn=1865-7362&client=summon