Using a predicted workload to improve preparedness of backup power source
An amount of power that is provided to a load is measured. The load is coupled to a battery backup unit (BBU) or an uninterruptable power supply (UPS). The amount of power is stored into a history of power draw for the load. The history of power draw is used to determine a time period or a situation...
Saved in:
Main Authors | , , |
---|---|
Format | Patent |
Language | English |
Published |
30.05.2023
|
Subjects | |
Online Access | Get full text |
Cover
Loading…
Be the first to leave a comment!