Handling heavy subsea structures
A method transports and installs a heavy subsea structure such as a subsea processing center for produced crude oil or natural gas. The method includes controlledly flooding at least one ballast tank attached to or incorporated into the structure to the extent that the structure becomes negatively b...
Saved in:
Main Author | |
---|---|
Format | Patent |
Language | English |
Published |
12.01.2021
|
Subjects | |
Online Access | Get full text |
Cover
Loading…
Be the first to leave a comment!