GROUND IMPROVEMENT METHOD, AND SYSTEM FOR MANAGING CONSTRUCTION IN GROUND IMPROVEMENT METHOD

44 GROUND IMPROVEMENT METHOD, AND SYSTEM FOR MANAGING CONSTRUCTION IN GROUND IMPROVEMENT METHOD Abstract A ground improvement method in which screw a rod (3) provided with a stirring blade (2) is inserted into the ground to a predetermined depth while rotating without a ground improvement material b...

Full description

Saved in:
Bibliographic Details
Main Authors KAMIMURA KAZUYOSHI, KAMI CHIKASHI, TAKAHASHI TSUYOSHI, FUKADA HISASHI, TAKAHASHI TATSUO, TONISHI YUKIO
Format Patent
LanguageEnglish
Published 30.12.2014
Subjects
Online AccessGet full text

Cover

Loading…
Abstract 44 GROUND IMPROVEMENT METHOD, AND SYSTEM FOR MANAGING CONSTRUCTION IN GROUND IMPROVEMENT METHOD Abstract A ground improvement method in which screw a rod (3) provided with a stirring blade (2) is inserted into the ground to a predetermined depth while rotating without a ground improvement material being injected, and the screw rod is extracted while the ground is stirred and mixed using the stirring blade while the screw rod is rotated and the ground improvement material is injected therefrom. The number of rotations of the stirring blade when the screw rod is inserted and the ground improvement material is not injected is included in the number of rotations of the stirring blade when the screw rod is removed and the ground improvement material is injected, and taken to be an adjusted number of blade rotations. The adjusted blade rotation number is set on the basis of the target ground improvement body strength variation coefficient, from a predefined relationship between the ground improvement body strength variation coefficient and the adjusted number of blade rotations. Ground improvement is performed using the set adjustment number of blade rotation as a construction management category. It is thereby possible to improve construction efficiency while ensuring adequate construction quality. FIG. 10A
AbstractList 44 GROUND IMPROVEMENT METHOD, AND SYSTEM FOR MANAGING CONSTRUCTION IN GROUND IMPROVEMENT METHOD Abstract A ground improvement method in which screw a rod (3) provided with a stirring blade (2) is inserted into the ground to a predetermined depth while rotating without a ground improvement material being injected, and the screw rod is extracted while the ground is stirred and mixed using the stirring blade while the screw rod is rotated and the ground improvement material is injected therefrom. The number of rotations of the stirring blade when the screw rod is inserted and the ground improvement material is not injected is included in the number of rotations of the stirring blade when the screw rod is removed and the ground improvement material is injected, and taken to be an adjusted number of blade rotations. The adjusted blade rotation number is set on the basis of the target ground improvement body strength variation coefficient, from a predefined relationship between the ground improvement body strength variation coefficient and the adjusted number of blade rotations. Ground improvement is performed using the set adjustment number of blade rotation as a construction management category. It is thereby possible to improve construction efficiency while ensuring adequate construction quality. FIG. 10A
Author TAKAHASHI TSUYOSHI
TONISHI YUKIO
TAKAHASHI TATSUO
FUKADA HISASHI
KAMIMURA KAZUYOSHI
KAMI CHIKASHI
Author_xml – fullname: KAMIMURA KAZUYOSHI
– fullname: KAMI CHIKASHI
– fullname: TAKAHASHI TSUYOSHI
– fullname: FUKADA HISASHI
– fullname: TAKAHASHI TATSUO
– fullname: TONISHI YUKIO
BookMark eNrjYmDJy89L5WSIcQ_yD_VzUfD0DQjyD3P1dfULUfB1DfHwd9FRcASKB0cGh7j6Krj5Byn4Ovo5unv6uSs4-_sFhwSFOod4-vspePop4DSCh4E1LTGnOJUXSnMzqLi5hjh76KYW5MenFhckJqfmpZbEB7sbGhgZGJoYmJuaG4c4GhOpDABsezX4
ContentType Patent
DBID EVB
DatabaseName esp@cenet
DatabaseTitleList
Database_xml – sequence: 1
  dbid: EVB
  name: esp@cenet
  url: http://worldwide.espacenet.com/singleLineSearch?locale=en_EP
  sourceTypes: Open Access Repository
DeliveryMethod fulltext_linktorsrc
Discipline Medicine
Chemistry
Sciences
ExternalDocumentID SG10201407573TA
GroupedDBID EVB
ID FETCH-epo_espacenet_SG10201407573TA3
IEDL.DBID EVB
IngestDate Fri Jul 19 11:28:29 EDT 2024
IsOpenAccess true
IsPeerReviewed false
IsScholarly false
Language English
LinkModel DirectLink
MergedId FETCHMERGED-epo_espacenet_SG10201407573TA3
Notes Application Number: SGT10201407573
OpenAccessLink https://worldwide.espacenet.com/publicationDetails/biblio?FT=D&date=20141230&DB=EPODOC&CC=SG&NR=10201407573TA
ParticipantIDs epo_espacenet_SG10201407573TA
PublicationCentury 2000
PublicationDate 20141230
PublicationDateYYYYMMDD 2014-12-30
PublicationDate_xml – month: 12
  year: 2014
  text: 20141230
  day: 30
PublicationDecade 2010
PublicationYear 2014
RelatedCompanies SHIMIZU CORPORATION
AOMI CONSTRUCTION CO., LTD
FUDO TETRA CORPORATION
RelatedCompanies_xml – name: SHIMIZU CORPORATION
– name: AOMI CONSTRUCTION CO., LTD
– name: FUDO TETRA CORPORATION
Score 2.9679294
Snippet 44 GROUND IMPROVEMENT METHOD, AND SYSTEM FOR MANAGING CONSTRUCTION IN GROUND IMPROVEMENT METHOD Abstract A ground improvement method in which screw a rod (3)...
SourceID epo
SourceType Open Access Repository
SubjectTerms EMBANKMENTS
EXCAVATIONS
FIXED CONSTRUCTIONS
FOUNDATIONS
HYDRAULIC ENGINEERING
SOIL SHIFTING
UNDERGROUND OR UNDERWATER STRUCTURES
Title GROUND IMPROVEMENT METHOD, AND SYSTEM FOR MANAGING CONSTRUCTION IN GROUND IMPROVEMENT METHOD
URI https://worldwide.espacenet.com/publicationDetails/biblio?FT=D&date=20141230&DB=EPODOC&locale=&CC=SG&NR=10201407573TA
hasFullText 1
inHoldings 1
isFullTextHit
isPrint
link http://utb.summon.serialssolutions.com/2.0.0/link/0/eLvHCXMwhV1LS8NAEB5qFfWmVfFV2UPJyWLaJE16KNLmLSQpTVoqCCW7ScGDabER_76zS-rjoN72AcPuLPPanfkWoKVk_Yx1OPIx1fpttcvktsGL3XU51yi6__xHRp5tEfa8qfow1-Y1eNnWwgic0HcBjogSxVDeS6Gv11-XWJbIrdzc0WccWt07ycCSqui4o6IiliVrNLDHkRWZkmkOYlcKJ-jr8lm0j7qSDHdgFz1pnQuEPRvxwpT1d6viHMHeGAkW5THU8qIBB-b287UG7AfVmzc2K_HbnMATT5IPLeIH40k0Ezj8JLATL7JuyRDH48c4sQOCgR0RSP1-6BIzCuNkMhW5IsQPya8kTqHl2InptXGZi0-2LGL3x6aUM6gXqyI_B6J2l3o_zZYZZUtVVVI8Bq1rUEWnjDGjl15A809Sl__MX8Eh7wm8Q_ka6uXrW95E21zSG8HRD3KYikQ
link.rule.ids 230,309,783,888,25576,76876
linkProvider European Patent Office
linkToHtml http://utb.summon.serialssolutions.com/2.0.0/link/0/eLvHCXMwhV1LT8JAEJ4gGvGmqPGF7oH0JLHQlsKBGGgLrdItoQuBxITQbUk8WIjU-Ped3YCPg3rbzCSTfWQeuzvzDUBZi5sxrwrk48hoVvQaVysNUexuqokRYfgvOjKKbAtad0f6w8SY5OBlWwsjcULfJTgiahRHfc-kvV59PWLZMrdyfRc9I2l532UtW9ncjqs6GmJVsTstZxDYgaVYVivsKXSIsa7gon80NdbegV2Msk2hEM64IwpTVt-9SvcQ9gYoMM2OIJekRShY2-ZrRdj3N3_eONyo3_oYnkSSPLWJ5w-GwVji8BPfYW5g35I20sNpyByf4MWOSKR-j_aIFdCQDUcyV4R4lPwq4gTKXYdZbgWnOfvcllnY-7Eo7RTy6TJNzoDotYXZnMeLOOILXdfmeAxGrRFpZsQ5b9Tn51D6U9TFP_wbKLjM78_6Hn28hAPBkdiH6hXks9e3pIR-Oouu5e5-ABvFjTc
openUrl ctx_ver=Z39.88-2004&ctx_enc=info%3Aofi%2Fenc%3AUTF-8&rfr_id=info%3Asid%2Fsummon.serialssolutions.com&rft_val_fmt=info%3Aofi%2Ffmt%3Akev%3Amtx%3Apatent&rft.title=GROUND+IMPROVEMENT+METHOD%2C+AND+SYSTEM+FOR+MANAGING+CONSTRUCTION+IN+GROUND+IMPROVEMENT+METHOD&rft.inventor=KAMIMURA+KAZUYOSHI&rft.inventor=KAMI+CHIKASHI&rft.inventor=TAKAHASHI+TSUYOSHI&rft.inventor=FUKADA+HISASHI&rft.inventor=TAKAHASHI+TATSUO&rft.inventor=TONISHI+YUKIO&rft.date=2014-12-30&rft.externalDBID=A&rft.externalDocID=SG10201407573TA