SHOTCRETE CAPTURE MEMBER FOR TUNNEL CONSTRUCTION
To quickly integrate a ground excavation surface and an arch support during tunnel construction.SOLUTION: A shotcrete capture member 10 is provided in a gap 5 between an earth excavation surface 2a of a tunnel 1 and an outer peripheral surface 3a of an arch support 3. A capture body 11 of the shotcr...
Saved in:
Main Authors | , , , , , , , |
---|---|
Format | Patent |
Language | English Japanese |
Published |
07.02.2024
|
Subjects | |
Online Access | Get full text |
Cover
Loading…
Summary: | To quickly integrate a ground excavation surface and an arch support during tunnel construction.SOLUTION: A shotcrete capture member 10 is provided in a gap 5 between an earth excavation surface 2a of a tunnel 1 and an outer peripheral surface 3a of an arch support 3. A capture body 11 of the shotcrete capture member 10 is composed of linear members 11a distributed in the circumferential direction along the outer peripheral surface 3a of the arch support 3 and in the radial direction perpendicular to the outer peripheral surface 3a, and prevents concrete 2A from passing through during spraying.SELECTED DRAWING: Figure 4
【課題】トンネル構築の際に地山掘削面とアーチ支保工とを早期に一体化させる。【解決手段】トンネル1の地山掘削面2aとアーチ支保工3の外周面3aとの間の空隙5に吹付コンクリート捕捉部材10を設ける。吹付コンクリート捕捉部材10の捕捉体11は、アーチ支保工3の外周面3aに沿う周方向及び外周面3aと直交する径方向に分布する線状材11aからなり、吹付中のコンクリート2Aの通り抜けを妨げる。【選択図】図4 |
---|---|
Bibliography: | Application Number: JP20220118634 |