TROLLEY RUNNING PATH AND CONCRETE PLACING METHOD
To propose a trolley running path and a concrete placing method which enable a trolley supporting a heavy object such as a formwork to run after arranging reinforcing bars.SOLUTION: A trolley running path 5 for a trolley 8 running above reinforcing bars 3 assembled in a grid pattern comprises a plur...
Saved in:
Main Authors | , , |
---|---|
Format | Patent |
Language | English Japanese |
Published |
01.09.2022
|
Subjects | |
Online Access | Get full text |
Cover
Loading…
Summary: | To propose a trolley running path and a concrete placing method which enable a trolley supporting a heavy object such as a formwork to run after arranging reinforcing bars.SOLUTION: A trolley running path 5 for a trolley 8 running above reinforcing bars 3 assembled in a grid pattern comprises a plurality of blocks 6, arranged in a row along the traveling direction of the trolley 8. The blocks 6 are provided in front of and behind horizontal reinforcing bars 31 intersecting the traveling direction of the trolley 8, and the upper surfaces of the blocks 6 are positioned higher than the reinforcing bars 3.SELECTED DRAWING: Figure 3
【課題】型枠などの重量物を支持する台車を配筋後に走行させることを可能とした台車走行路およびコンクリート打設方法を提案する。【解決手段】格子状に組み立てられた補強鉄筋3の上方を走行する台車8の台車走行路5であって、台車8の進行方向に沿って列状に配設された複数のブロック体6,6,...を備えており、ブロック体6は、台車8の進行方向と交差する横筋31の前後に設けられていて、ブロック体6の上面は補強鉄筋3よりも高い位置にある。【選択図】図3 |
---|---|
Bibliography: | Application Number: JP20210025817 |