SCHEDULE ADJUSTMENT METHOD AND PROGRAM
PROBLEM TO BE SOLVED: To reflect change of a work schedule to conference reservation and create a schedule of subsequent work based on a result of conference reservation, when the work and periodic conference are associated each other.SOLUTION: A schedule adjustment server 101 comprises: a step prog...
Saved in:
Main Authors | , |
---|---|
Format | Patent |
Language | English Japanese |
Published |
22.10.2015
|
Subjects | |
Online Access | Get full text |
Cover
Loading…
Abstract | PROBLEM TO BE SOLVED: To reflect change of a work schedule to conference reservation and create a schedule of subsequent work based on a result of conference reservation, when the work and periodic conference are associated each other.SOLUTION: A schedule adjustment server 101 comprises: a step progress table 141 for storing step progress information; a schedule table 152 for storing schedule information of employees; a conference reservation table 151 for storing conference reservation information; and a schedule adjustment part 102. The schedule adjustment part 102 determines delay or progress of work based on the step progress information, and when it is determined that the work delays or progresses, selects a conference room which can be used for the number of days of review requirement, registers updated conference reservation information and schedule information in the conference reservation table 151 and schedule table 152 respectively, and updates a work completion scheduled date included in the step progress information. Then the schedule adjustment part 102 updates the step progress information about post-step work.
【課題】作業と定期的な会議が紐付いている場合に、作業スケジュール上の変更を会議予約に反映し、会議予約の結果を元に後続作業をスケジュールする。【解決手段】スケジュール調整サーバ101は、工程進捗情報が格納された工程進捗テーブル141と、従業員のスケジュール情報が格納されたスケジュールテーブル152と、会議予約情報が格納された会議予約テーブル151と、スケジュール調整部102とを備える。スケジュール調整部102は、工程進捗情報に基づいて作業の遅延または進捗を判定し、遅延または進捗と判定した場合に、使用可能な会議室をレビュー所要日数分選択して、更新した会議予約情報とスケジュール情報をそれぞれ会議予約テーブル151とスケジュールテーブル152に登録し、工程進捗情報に含まれる作業完了予定日を更新する。そして、スケジュール調整部102は、後工程の作業について工程進捗情報を更新する。【選択図】図1 |
---|---|
AbstractList | PROBLEM TO BE SOLVED: To reflect change of a work schedule to conference reservation and create a schedule of subsequent work based on a result of conference reservation, when the work and periodic conference are associated each other.SOLUTION: A schedule adjustment server 101 comprises: a step progress table 141 for storing step progress information; a schedule table 152 for storing schedule information of employees; a conference reservation table 151 for storing conference reservation information; and a schedule adjustment part 102. The schedule adjustment part 102 determines delay or progress of work based on the step progress information, and when it is determined that the work delays or progresses, selects a conference room which can be used for the number of days of review requirement, registers updated conference reservation information and schedule information in the conference reservation table 151 and schedule table 152 respectively, and updates a work completion scheduled date included in the step progress information. Then the schedule adjustment part 102 updates the step progress information about post-step work.
【課題】作業と定期的な会議が紐付いている場合に、作業スケジュール上の変更を会議予約に反映し、会議予約の結果を元に後続作業をスケジュールする。【解決手段】スケジュール調整サーバ101は、工程進捗情報が格納された工程進捗テーブル141と、従業員のスケジュール情報が格納されたスケジュールテーブル152と、会議予約情報が格納された会議予約テーブル151と、スケジュール調整部102とを備える。スケジュール調整部102は、工程進捗情報に基づいて作業の遅延または進捗を判定し、遅延または進捗と判定した場合に、使用可能な会議室をレビュー所要日数分選択して、更新した会議予約情報とスケジュール情報をそれぞれ会議予約テーブル151とスケジュールテーブル152に登録し、工程進捗情報に含まれる作業完了予定日を更新する。そして、スケジュール調整部102は、後工程の作業について工程進捗情報を更新する。【選択図】図1 |
Author | NAKANISHI TETSUYA BABA NOBUYOSHI |
Author_xml | – fullname: NAKANISHI TETSUYA – fullname: BABA NOBUYOSHI |
BookMark | eNrjYmDJy89L5WRQC3b2cHUJ9XFVcHTxCg0O8XX1C1HwdQ3x8HdRcPRzUQgI8ncPcvTlYWBNS8wpTuWF0twMSm6uIc4euqkF-fGpxQWJyal5qSXxXgFGBoamhhamBqYWjsZEKQIA8UIlvQ |
ContentType | Patent |
DBID | EVB |
DatabaseName | esp@cenet |
DatabaseTitleList | |
Database_xml | – sequence: 1 dbid: EVB name: esp@cenet url: http://worldwide.espacenet.com/singleLineSearch?locale=en_EP sourceTypes: Open Access Repository |
DeliveryMethod | fulltext_linktorsrc |
Discipline | Medicine Chemistry Sciences Physics |
DocumentTitleAlternate | スケジュール調整方法およびスケジュール調整プログラム |
ExternalDocumentID | JP2015185058A |
GroupedDBID | EVB |
ID | FETCH-epo_espacenet_JP2015185058A3 |
IEDL.DBID | EVB |
IngestDate | Fri Jul 19 12:52:12 EDT 2024 |
IsOpenAccess | true |
IsPeerReviewed | false |
IsScholarly | false |
Language | English Japanese |
LinkModel | DirectLink |
MergedId | FETCHMERGED-epo_espacenet_JP2015185058A3 |
Notes | Application Number: JP20140062889 |
OpenAccessLink | https://worldwide.espacenet.com/publicationDetails/biblio?FT=D&date=20151022&DB=EPODOC&CC=JP&NR=2015185058A |
ParticipantIDs | epo_espacenet_JP2015185058A |
PublicationCentury | 2000 |
PublicationDate | 20151022 |
PublicationDateYYYYMMDD | 2015-10-22 |
PublicationDate_xml | – month: 10 year: 2015 text: 20151022 day: 22 |
PublicationDecade | 2010 |
PublicationYear | 2015 |
RelatedCompanies | HITACHI SOLUTIONS LTD |
RelatedCompanies_xml | – name: HITACHI SOLUTIONS LTD |
Score | 3.1209447 |
Snippet | PROBLEM TO BE SOLVED: To reflect change of a work schedule to conference reservation and create a schedule of subsequent work based on a result of conference... |
SourceID | epo |
SourceType | Open Access Repository |
SubjectTerms | CALCULATING COMPUTING COUNTING DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FORADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORYOR FORECASTING PURPOSES PHYSICS SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE,COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTINGPURPOSES, NOT OTHERWISE PROVIDED FOR |
Title | SCHEDULE ADJUSTMENT METHOD AND PROGRAM |
URI | https://worldwide.espacenet.com/publicationDetails/biblio?FT=D&date=20151022&DB=EPODOC&locale=&CC=JP&NR=2015185058A |
hasFullText | 1 |
inHoldings | 1 |
isFullTextHit | |
isPrint | |
link | http://utb.summon.serialssolutions.com/2.0.0/link/0/eLvHCXMwfV1LS8NAEB5qfd60KmpVgkhuwdo8upcg6e7WEEwT0kR6K3lsQYW0mIh_38naak897gzMPmDm29l5LMA9KYqsSC1LEz2TaIbez7SsILkmgzQDXeRCRvD9seUmhjc1py34WNfCyD6h37I5ImpUjvpeS3u9_H_EYjK3snrI3pC0eBrFNlNX3jHCF2KSyoY2DwMWUJVS2wvVcfTLIwj3xNmBXbxHDxp14K_DpixluYkpo2PYC1FcWZ9A6z3twCFdf73WgQN_FfHuwL5M0cwrJK7UsDoFdUJdzpIXrjjMSyZx05Bf8XnsBkxxxkwJo-A5cvwzuBvxmLoaTj372-jMCzeWqZ9Du1yU4gKUec8szLRpIavPjccUvSShi8I00HUi5pyQS-huEXS1lduFo2bUmON-_xra9eeXuEGcrbNbeT4_7IN72Q |
link.rule.ids | 230,309,783,888,25576,76876 |
linkProvider | European Patent Office |
linkToHtml | http://utb.summon.serialssolutions.com/2.0.0/link/0/eLvHCXMwfV1ZT8JAEJ4gHvimqFHxaIzpWyP0gH1pTOkWa6VHSmt4a3psEzUBIjX-facrKE-8ziR7Jd98OzvHAtyTosiKtN-XWFcjkqrImZQVJJd4kGagsJzxCL7r9e1YdabatAEf61oY3if0mzdHRETliPeK2-vF_yMW5bmVy4fsDUXzx1GkU3HlHSN9ISeJdKhbgU99UzRN3QlEL_zVEaR7YuzALt6xBzUcrNdhXZay2OSU0RHsBTjcrDqGxnvahpa5_nqtDQfuKuLdhn2eopkvUbiC4fIExIlpWzQeW4JBnXgS1Q35BdeKbJ8KhkeFIPSfQsM9hbuRFZm2hFMnfxtNnGBjmcoZNGfzGTsHoexqhZbWLWSVUu2l6CUxhRWaiq4T0UpCLqCzZaDLrdpbaNmRO07Gz95LBw5rTW2aZfkKmtXnF7tGzq2yG35WP-bbfsw |
openUrl | ctx_ver=Z39.88-2004&ctx_enc=info%3Aofi%2Fenc%3AUTF-8&rfr_id=info%3Asid%2Fsummon.serialssolutions.com&rft_val_fmt=info%3Aofi%2Ffmt%3Akev%3Amtx%3Apatent&rft.title=SCHEDULE+ADJUSTMENT+METHOD+AND+PROGRAM&rft.inventor=NAKANISHI+TETSUYA&rft.inventor=BABA+NOBUYOSHI&rft.date=2015-10-22&rft.externalDBID=A&rft.externalDocID=JP2015185058A |