TUNNEL LINING FORM AND TUNNEL LINING CONSTRUCTION METHOD

PROBLEM TO BE SOLVED: To reduce a volume of concrete placed in a space in which a concrete placed state cannot be visually confirmed, and to facilitate visual confirmation in a region in which the concrete placed state can be visually confirmed, in tunnel lining construction. SOLUTION: A blow-up por...

Full description

Saved in:
Bibliographic Details
Main Authors HARA HIDETOSHI, TANASE TOMIHIRO, INAGAWA YUKIHISA
Format Patent
LanguageEnglish
Published 17.04.2008
Subjects
Online AccessGet full text

Cover

Loading…
Abstract PROBLEM TO BE SOLVED: To reduce a volume of concrete placed in a space in which a concrete placed state cannot be visually confirmed, and to facilitate visual confirmation in a region in which the concrete placed state can be visually confirmed, in tunnel lining construction. SOLUTION: A blow-up port 40 for supplying concrete 9 at high pressure is provided in an arch 13 being a part positioned below a ceiling 10 and adjacent to the ceiling 10 in a form 1A for tunnel lining. Pressure in the blow-up port 40 is sufficient for feeding the concrete 9 to be discharged from the blow-up port 40 above the form against gravity. A window 5c allowing the worker to observe the concrete 9 placed state is provided at the ceiling 10. Concrete is placed as horizontally as possible up to a position in which the concrete placing can be visually confirmed through the window 5c by using the form 1A. COPYRIGHT: (C)2008,JPO&INPIT
AbstractList PROBLEM TO BE SOLVED: To reduce a volume of concrete placed in a space in which a concrete placed state cannot be visually confirmed, and to facilitate visual confirmation in a region in which the concrete placed state can be visually confirmed, in tunnel lining construction. SOLUTION: A blow-up port 40 for supplying concrete 9 at high pressure is provided in an arch 13 being a part positioned below a ceiling 10 and adjacent to the ceiling 10 in a form 1A for tunnel lining. Pressure in the blow-up port 40 is sufficient for feeding the concrete 9 to be discharged from the blow-up port 40 above the form against gravity. A window 5c allowing the worker to observe the concrete 9 placed state is provided at the ceiling 10. Concrete is placed as horizontally as possible up to a position in which the concrete placing can be visually confirmed through the window 5c by using the form 1A. COPYRIGHT: (C)2008,JPO&INPIT
Author TANASE TOMIHIRO
HARA HIDETOSHI
INAGAWA YUKIHISA
Author_xml – fullname: HARA HIDETOSHI
– fullname: TANASE TOMIHIRO
– fullname: INAGAWA YUKIHISA
BookMark eNrjYmDJy89L5WSwCAn183P1UfDx9PP0c1dw8w_yVXD0c1FAFXb29wsOCQp1DvH091PwdQ3x8HfhYWBNS8wpTuWF0twMSm6uIc4euqkF-fGpxQWJyal5qSXxXgFGBgYWBhYWZpaGjsZEKQIAzsMq5g
ContentType Patent
DBID EVB
DatabaseName esp@cenet
DatabaseTitleList
Database_xml – sequence: 1
  dbid: EVB
  name: esp@cenet
  url: http://worldwide.espacenet.com/singleLineSearch?locale=en_EP
  sourceTypes: Open Access Repository
DeliveryMethod fulltext_linktorsrc
Discipline Medicine
Chemistry
Sciences
ExternalDocumentID JP2008088691A
GroupedDBID EVB
ID FETCH-epo_espacenet_JP2008088691A3
IEDL.DBID EVB
IngestDate Fri Jul 19 11:54:52 EDT 2024
IsOpenAccess true
IsPeerReviewed false
IsScholarly false
Language English
LinkModel DirectLink
MergedId FETCHMERGED-epo_espacenet_JP2008088691A3
Notes Application Number: JP20060270435
OpenAccessLink https://worldwide.espacenet.com/publicationDetails/biblio?FT=D&date=20080417&DB=EPODOC&CC=JP&NR=2008088691A
ParticipantIDs epo_espacenet_JP2008088691A
PublicationCentury 2000
PublicationDate 20080417
PublicationDateYYYYMMDD 2008-04-17
PublicationDate_xml – month: 04
  year: 2008
  text: 20080417
  day: 17
PublicationDecade 2000
PublicationYear 2008
RelatedCompanies MAEDA CORP
GIFU KOGYO CO LTD
RelatedCompanies_xml – name: GIFU KOGYO CO LTD
– name: MAEDA CORP
Score 2.7058756
Snippet PROBLEM TO BE SOLVED: To reduce a volume of concrete placed in a space in which a concrete placed state cannot be visually confirmed, and to facilitate visual...
SourceID epo
SourceType Open Access Repository
SubjectTerms EARTH DRILLING
FIXED CONSTRUCTIONS
GALLERIES
LARGE UNDERGROUND CHAMBERS
MINING
SHAFTS
TUNNELS
Title TUNNEL LINING FORM AND TUNNEL LINING CONSTRUCTION METHOD
URI https://worldwide.espacenet.com/publicationDetails/biblio?FT=D&date=20080417&DB=EPODOC&locale=&CC=JP&NR=2008088691A
hasFullText 1
inHoldings 1
isFullTextHit
isPrint
link http://utb.summon.serialssolutions.com/2.0.0/link/0/eLvHCXMwfV1RS8MwED7mFPVNpzKdShHpW1G7Nu0eimxNa1fWtMxW9jaapg8idMNV_Psm2arzZW_hDo5L4PLlkrsvAPdIZ2VuIqpRZg00o1-YGhWEADYa8Hwiz01D_g0YERRkRjgzZy34aHphJE_otyRH5BFV8Hiv5X69_LvEwrK2cvVA37lo8eynDlab7Fiw6VgqHjleEuPYVV3XCROVTNc6W3gw3IN9cY4WRPve20i0pSy3McU_gYOEm6vqU2iVVQeO3ObrtQ4cRpsXbz7cBN_qDOw0I8SbKJMxGZMXhadvkTIkWPkvdmPymk4zWRuiRF4axPgc7nwvdQONuzD_nfA8TLbc7V9Au1pUZVf0VxsF4_it26zgQExz3UKsZLqlmyV6tOgl9HYYutqp7cHxuhTC0J6sa2jXn1_lDcfbmt7KdfoBHg1-DA
link.rule.ids 230,309,786,891,25594,76906
linkProvider European Patent Office
linkToHtml http://utb.summon.serialssolutions.com/2.0.0/link/0/eLvHCXMwfV3fT4MwEL7MaZxvOjXq_EGM4Y2oDCh7IGajIEMoZDKzN0KBB2PCFofx37fths6XvTV3yeXa5Pr12ruvAHeGWpSZblCFFmigaP1cVygnBDCNAcsnskzXxN-AITG8qebP9FkLPppeGMET-i3IEVlE5Szea7FfL_4usbCorVze03cmmj-5iYXlJjvmbDpIxiPLiSMc2bJtW34sk8lKZ3IPhjuwizg9Lz87vY14W8piE1PcQ9iLmbmqPoJWWXWhYzdfr3VhP1y_eLPhOviWx2AmU0KcQArGZEyeJZa-hdKQYOm_2I7IazKZitoQKXQSL8IncOs6ie0pzIX0d8KpH2-42z-FdjWvyjPeX63lBcNv1SxyBsQ0U5FRlIWKVL00HhA9h94WQxdbtTfQ8ZIwSJmzLz04WJVFaMojuoR2_flVXjHsrem1WLMfKzyA-Q
openUrl ctx_ver=Z39.88-2004&ctx_enc=info%3Aofi%2Fenc%3AUTF-8&rfr_id=info%3Asid%2Fsummon.serialssolutions.com&rft_val_fmt=info%3Aofi%2Ffmt%3Akev%3Amtx%3Apatent&rft.title=TUNNEL+LINING+FORM+AND+TUNNEL+LINING+CONSTRUCTION+METHOD&rft.inventor=HARA+HIDETOSHI&rft.inventor=TANASE+TOMIHIRO&rft.inventor=INAGAWA+YUKIHISA&rft.date=2008-04-17&rft.externalDBID=A&rft.externalDocID=JP2008088691A