Operating data network involves defining current level reserve for overdriving limit, that is between current transmitter power and current receiver overdriving limit, for test mode
The data network operating method involves defining the current level reserve for the overdriving limit, that is between the current transmitter (6) transmission power and the current overdriving limit of the receiver (7), for the transmission path(s) (2-5) in test mode in addition to defining the c...
Saved in:
Main Authors | , , , , , , , |
---|---|
Format | Patent |
Language | English German |
Published |
08.05.2002
|
Edition | 7 |
Subjects | |
Online Access | Get full text |
Cover
Loading…
Be the first to leave a comment!