Operating data network involves defining current level reserve for overdriving limit, that is between current transmitter power and current receiver overdriving limit, for test mode

The data network operating method involves defining the current level reserve for the overdriving limit, that is between the current transmitter (6) transmission power and the current overdriving limit of the receiver (7), for the transmission path(s) (2-5) in test mode in addition to defining the c...

Full description

Saved in:
Bibliographic Details
Main Authors ZEEB, EBERHARD, BOESINGER, MARCUS, BRANDES, JENS, SEIDL, DIETER, PETRY, FRANZ-JOSEF, MARQUARDT, DIETER, MERGET, PETER, SEIB, HANS-GERD
Format Patent
LanguageEnglish
German
Published 08.05.2002
Edition7
Subjects
Online AccessGet full text

Cover

Loading…