Quick tool changing and reinforcing structure for boulder group blasting section in shield section

The utility model provides a shield interval boulder group blasting section rapid tool changing and reinforcing structure which comprises a shield body, and a shield body radial grouting pipe, a foam concrete injection hole in a partition plate and a telescopic cutter head are arranged on the shield...

Full description

Saved in:
Bibliographic Details
Main Authors ZHANG MINGXU, LI WEIZHOU, WANG ZONGYONG, LIU BOFENG, CHEN QINGHUAI, YI LINGBING
Format Patent
LanguageChinese
English
Published 07.05.2024
Subjects
Online AccessGet full text

Cover

Loading…
Abstract The utility model provides a shield interval boulder group blasting section rapid tool changing and reinforcing structure which comprises a shield body, and a shield body radial grouting pipe, a foam concrete injection hole in a partition plate and a telescopic cutter head are arranged on the shield body. Balanced shield mud is injected between the shield body and the soil body through the shield body radial grouting pipe, soil bin pressure is established through the balanced shield mud, and after the pressure in the soil bin is increased to a set value, the soil bin is backfilled with shaped EPS; foam concrete is injected between the shield body and the excavation face through the foam concrete injection holes in the partition plate. The reinforcing structure has the advantages of being safe in construction, low in cost, environmentally friendly in construction, short in construction period, high in practicability, advanced in technology and the like, the reinforcing structure is successfully applied to shie
AbstractList The utility model provides a shield interval boulder group blasting section rapid tool changing and reinforcing structure which comprises a shield body, and a shield body radial grouting pipe, a foam concrete injection hole in a partition plate and a telescopic cutter head are arranged on the shield body. Balanced shield mud is injected between the shield body and the soil body through the shield body radial grouting pipe, soil bin pressure is established through the balanced shield mud, and after the pressure in the soil bin is increased to a set value, the soil bin is backfilled with shaped EPS; foam concrete is injected between the shield body and the excavation face through the foam concrete injection holes in the partition plate. The reinforcing structure has the advantages of being safe in construction, low in cost, environmentally friendly in construction, short in construction period, high in practicability, advanced in technology and the like, the reinforcing structure is successfully applied to shie
Author WANG ZONGYONG
YI LINGBING
CHEN QINGHUAI
ZHANG MINGXU
LIU BOFENG
LI WEIZHOU
Author_xml – fullname: ZHANG MINGXU
– fullname: LI WEIZHOU
– fullname: WANG ZONGYONG
– fullname: LIU BOFENG
– fullname: CHEN QINGHUAI
– fullname: YI LINGBING
BookMark eNqNirkKAjEUAFNo4fUPD3thWUVIvShWguDWS4632WB4L-T4fw-0txpmmKWYERMuhL5Vbx5QmAOYSZHz5ECRhYSeRk7m7bmkakpNCK8CmmuwmMAlrhF0ULl8JjTFM4EnyJPHYH9lLeajChk3X67E9ny6d5cdRh4wR2WQsAzdtW0b2cijPPT9_q_pCWaHQTA
ContentType Patent
DBID EVB
DatabaseName esp@cenet
DatabaseTitleList
Database_xml – sequence: 1
  dbid: EVB
  name: esp@cenet
  url: http://worldwide.espacenet.com/singleLineSearch?locale=en_EP
  sourceTypes: Open Access Repository
DeliveryMethod fulltext_linktorsrc
Discipline Medicine
Chemistry
Sciences
DocumentTitleAlternate 一种盾构区间孤石群爆破地段快速换刀加固结构
ExternalDocumentID CN220909694UU
GroupedDBID EVB
ID FETCH-epo_espacenet_CN220909694UU3
IEDL.DBID EVB
IngestDate Fri Aug 02 08:54:54 EDT 2024
IsOpenAccess true
IsPeerReviewed false
IsScholarly false
Language Chinese
English
LinkModel DirectLink
MergedId FETCHMERGED-epo_espacenet_CN220909694UU3
Notes Application Number: CN202322574198U
OpenAccessLink https://worldwide.espacenet.com/publicationDetails/biblio?FT=D&date=20240507&DB=EPODOC&CC=CN&NR=220909694U
ParticipantIDs epo_espacenet_CN220909694UU
PublicationCentury 2000
PublicationDate 20240507
PublicationDateYYYYMMDD 2024-05-07
PublicationDate_xml – month: 05
  year: 2024
  text: 20240507
  day: 07
PublicationDecade 2020
PublicationYear 2024
RelatedCompanies RAIL TRANSIT BRANCH OF CHINA COMMUNICATIONS CONSTRUCTION CO., LTD
RelatedCompanies_xml – name: RAIL TRANSIT BRANCH OF CHINA COMMUNICATIONS CONSTRUCTION CO., LTD
Score 3.672823
Snippet The utility model provides a shield interval boulder group blasting section rapid tool changing and reinforcing structure which comprises a shield body, and a...
SourceID epo
SourceType Open Access Repository
SubjectTerms EARTH DRILLING
FIXED CONSTRUCTIONS
GALLERIES
LARGE UNDERGROUND CHAMBERS
MINING
SHAFTS
TUNNELS
Title Quick tool changing and reinforcing structure for boulder group blasting section in shield section
URI https://worldwide.espacenet.com/publicationDetails/biblio?FT=D&date=20240507&DB=EPODOC&locale=&CC=CN&NR=220909694U
hasFullText 1
inHoldings 1
isFullTextHit
isPrint
link http://utb.summon.serialssolutions.com/2.0.0/link/0/eLvHCXMwfV3fS8MwED7mFPVNp6JOJYj0rdhfW-1DEZZ2DGHdlE32Npo2ZZ3SjrZD8K_3Ejvn096SawjNwZf70t53AXgImW0nuMupyEYS1eKapYa2ztUwSWKNh1ZsdITAeRh0B1PrZdaZNWC50cLIOqFfsjgiIipCvFdyv15tP2J5MreyfGQpmvLn_sT1lPp0jOEJ-Y3i9Vx_PPJGVKHUpYESvLmGoTnI1h1rugf7SKNtgQb_vSdUKav_IaV_AgdjnC2rTqHxvWjBEd3cvNaCw2H9wxubNfbKM2Cv6zT6IFWefxIp18WgQ8IsJgWX1U8j0f8tB7suOEELYeL-al4QKd0gDIlyJQfJ9KuMpBkpFyKDbWM5h_u-P6EDFV92_ueZOQ2265qaF9DM8oxfAumYmhMxhGIc4_HKdJ50G9tONwr1xEQGcwXtHRNd73zahmPhaJn0Z99AE9fFbzEwV-xOevQHOmWUqA
link.rule.ids 230,309,783,888,25576,76876
linkProvider European Patent Office
linkToHtml http://utb.summon.serialssolutions.com/2.0.0/link/0/eLvHCXMwfV3fT8IwEL4gGvFNUYPij8aYvS0ONph7WEzoWKbCQDMMb2TduoCajcCIiX-91zrEJ97aW9Osl3y9r9t9V4DbkJlmgrucimwkUQ2uGWpoNrgaJkms8dCImy0hcO77bW9kPI1b4xK8r7Uwsk7olyyOiIiKEO-53K_nm49YjsytXN6xGZqyBzewHaU4HWN4Qn6jOB27Oxw4A6pQalNf8V_tZlOzkK1bxmgHdpFimwIN3beOUKXM_4cU9xD2hjhbmh9B6XtahQpd37xWhf1-8cMbmwX2lsfAXlaz6IPkWfZJpFwXgw4J05gsuKx-Gon-bznY1YITtBAm7q_mCyKlG4QhUc7lIJl-lZJZSpZTkcG2tpzAjdsNqKfiy07-PDOh_mZdI_0UymmW8hqQlq5ZEUMoxjEer3TrvmFi22pHYSPRkcGcQX3LROdbn15DxQv6vUnv0X-uw4FwukwANC-gjGvklxikc3YlvfsDX-6Xmw
openUrl ctx_ver=Z39.88-2004&ctx_enc=info%3Aofi%2Fenc%3AUTF-8&rfr_id=info%3Asid%2Fsummon.serialssolutions.com&rft_val_fmt=info%3Aofi%2Ffmt%3Akev%3Amtx%3Apatent&rft.title=Quick+tool+changing+and+reinforcing+structure+for+boulder+group+blasting+section+in+shield+section&rft.inventor=ZHANG+MINGXU&rft.inventor=LI+WEIZHOU&rft.inventor=WANG+ZONGYONG&rft.inventor=LIU+BOFENG&rft.inventor=CHEN+QINGHUAI&rft.inventor=YI+LINGBING&rft.date=2024-05-07&rft.externalDBID=U&rft.externalDocID=CN220909694UU