Large -scale aqueduct construction system of mill's formula

The utility model provides a large -scale aqueduct construction system of mill's formula sets up near the mound of groove that the district is deposited to reinforcing bar pedestal, reinforcing bar hoist, the steam canopy is deposited district, system groove support seat and is deposited the gr...

Full description

Saved in:
Bibliographic Details
Main Authors PANG WENZHAN, LI XUEHAO, WANG GUANGHUI, WANG LIPING, LI XINMING, CHEN MOUJIAN, ZHOU LIANGANG, JIA ZHIYING, XIONG JIANWU, ZHOU HAN, WANG JUNRU, HE LIANG, LIU WU
Format Patent
LanguageChinese
English
Published 06.03.2018
Subjects
Online AccessGet full text

Cover

Loading…
More Information
Summary:The utility model provides a large -scale aqueduct construction system of mill's formula sets up near the mound of groove that the district is deposited to reinforcing bar pedestal, reinforcing bar hoist, the steam canopy is deposited district, system groove support seat and is deposited the groove support seat, deposit district, steam canopy at reinforcing bar pedestal, reinforcing bar hoist anddeposit district, system groove support seat, be equipped with the track near depositing groove support seat and groove mound, install on the track and carry scouring machine and portal crane. Still be equipped with fortune tank wagon and frame scouring machine on the groove, the groove on fortune the tank wagon install the aqueduct top of erectting, the setting of frame scouring machine is on themound of groove to walk along the groove mound. The reinforcing bar pedestal be equipped with a plurality of pedestals bodies that are higher than ground, constitute steel groove between the pedestalbody, steel groove is used
Bibliography:Application Number: CN201721046842U