Construction method of double-layer geomembrane composite diaphragm wall

The invention discloses a construction method of a double-layer geomembrane composite anti-seepage wall, and aims to provide a construction method which can effectively solve the problems of geomembrane distortion and floating in the construction process of the geomembrane composite anti-seepage wal...

Full description

Saved in:
Bibliographic Details
Main Authors XIE DONGZHUANG, DING JIMIN, XIE HAINING, SHI HAOJUN, ZHOU LINGUO, DAI TENGTENG, DING JIBIN, LI PING, DENG YILIANG, ZHOU JIANJUN, ZHOU FANGYUAN, TONG JIANQING
Format Patent
LanguageChinese
English
Published 01.03.2024
Subjects
Online AccessGet full text

Cover

Loading…
More Information
Summary:The invention discloses a construction method of a double-layer geomembrane composite anti-seepage wall, and aims to provide a construction method which can effectively solve the problems of geomembrane distortion and floating in the construction process of the geomembrane composite anti-seepage wall in the prior art. The construction method of the double-layer geomembrane composite anti-seepage wall can effectively improve the blocking effect of the geomembrane composite anti-seepage wall. The method sequentially comprises the following steps that A, an anti-seepage wall groove is constructed, specifically, TRD equipment is adopted for cutting and stirring in a foundation to form the anti-seepage wall groove; b, a double-layer geomembrane is laid, the geomembrane is lowered in a U shape, the U-shaped geomembrane comprises a left-layer side geomembrane, a right-layer side geomembrane and a bottom geomembrane connecting the bottoms of the left-layer side geomembrane and the right-layer side geomembrane into a
Bibliography:Application Number: CN202311549694