Submarine cable crossing super-long shoal laying construction method and submarine cable crossing super-long shoal laying construction system
The invention belongs to the technical field of submarine cable laying, and provides a laying construction method and system for a submarine cable to pass through an ultra-long shoal, and the technical scheme is as follows: starting a submarine cable laying ship, and after the submarine cable laying...
Saved in:
Main Authors | , , , , , , , , , |
---|---|
Format | Patent |
Language | Chinese English |
Published |
30.01.2024
|
Subjects | |
Online Access | Get full text |
Cover
Loading…
Be the first to leave a comment!