Substation work distribution method and device based on NSGA-III algorithm

The invention provides a transformer substation work distribution method and device based on an NSGA-III algorithm. The method comprises the following steps: establishing a plurality of objective functions of a transformer substation work distribution problem and constraint conditions of the objecti...

Full description

Saved in:
Bibliographic Details
Main Authors WEI DAYANG, MA XIN, PAN QIN, ZHANG GUANYING, HU HANQIAO, GAN NING, CHU GUOWEI, MA JIANXUN, HOU SHUBIN, YU QINGYUN, ZHOU KEQING, JIANG WEI, LI XUECHEN, PENG FEI
Format Patent
LanguageChinese
English
Published 19.09.2023
Subjects
Online AccessGet full text

Cover

Loading…
More Information
Summary:The invention provides a transformer substation work distribution method and device based on an NSGA-III algorithm. The method comprises the following steps: establishing a plurality of objective functions of a transformer substation work distribution problem and constraint conditions of the objective functions; the NSGA-III algorithm is improved to obtain an improved NSGA-III algorithm; solving the objective function through an improved NSGA-III algorithm in combination with constraint conditions of the objective function so as to obtain an optimal work allocation scheme of the transformer substation; and performing work distribution on the transformer substation according to the optimal work distribution scheme. Therefore, the improved NSGA-III algorithm is adopted to carry out optimization solution of substation work distribution, reasonable distribution of substation work is realized, and the phenomenon that the algorithm converges too early or falls into local optimum can be avoided, so that the work dis
Bibliography:Application Number: CN202310200358