Virtual power plant resource scheduling method

The invention provides a virtual power plant resource scheduling method which can be applied to the technical field of power scheduling. The method comprises the steps that a virtual power plant calculates a total scheduling demand based on a scheduling demand and a first scheduling margin, and the...

Full description

Saved in:
Bibliographic Details
Main Authors LYU CHAOQING, LIU QIANG, SHI YE, MA XIANGZHUI, JIN HAO, SU HENGXUN, HU WUHUA, WU JIN
Format Patent
LanguageChinese
English
Published 25.08.2023
Subjects
Online AccessGet full text

Cover

Loading…
Abstract The invention provides a virtual power plant resource scheduling method which can be applied to the technical field of power scheduling. The method comprises the steps that a virtual power plant calculates a total scheduling demand based on a scheduling demand and a first scheduling margin, and the first scheduling margin is calculated by taking the scheduling demand as input data through a first model; the virtual power plant reports the total scheduling demand to a scheduling platform, and obtains the total scheduling capacity issued by the scheduling platform; the virtual power plant constructs a day-ahead scheduling model based on the scheduling demand, the first scheduling margin and the total scheduling capacity, and calculates a first scheduling capacity by using the day-ahead scheduling model; the virtual power plant schedules a first power resource for a user based on the first scheduling capacity. 本申请提供了一种虚拟电厂调度资源方法,可应用于电力调度技术领域。所述方法包括:虚拟电厂基于调度需求和第一调度余量计算得到总调度需求,其中,所述第一调度余量通过第一模型以所述调度需求作为输入数据计算得到;所述
AbstractList The invention provides a virtual power plant resource scheduling method which can be applied to the technical field of power scheduling. The method comprises the steps that a virtual power plant calculates a total scheduling demand based on a scheduling demand and a first scheduling margin, and the first scheduling margin is calculated by taking the scheduling demand as input data through a first model; the virtual power plant reports the total scheduling demand to a scheduling platform, and obtains the total scheduling capacity issued by the scheduling platform; the virtual power plant constructs a day-ahead scheduling model based on the scheduling demand, the first scheduling margin and the total scheduling capacity, and calculates a first scheduling capacity by using the day-ahead scheduling model; the virtual power plant schedules a first power resource for a user based on the first scheduling capacity. 本申请提供了一种虚拟电厂调度资源方法,可应用于电力调度技术领域。所述方法包括:虚拟电厂基于调度需求和第一调度余量计算得到总调度需求,其中,所述第一调度余量通过第一模型以所述调度需求作为输入数据计算得到;所述
Author HU WUHUA
LIU QIANG
SHI YE
MA XIANGZHUI
SU HENGXUN
LYU CHAOQING
JIN HAO
WU JIN
Author_xml – fullname: LYU CHAOQING
– fullname: LIU QIANG
– fullname: SHI YE
– fullname: MA XIANGZHUI
– fullname: JIN HAO
– fullname: SU HENGXUN
– fullname: HU WUHUA
– fullname: WU JIN
BookMark eNrjYmDJy89L5WTQC8ssKilNzFEoyC9PLVIoyEnMK1EoSi3OLy1KTlUoTs5ITSnNycxLV8hNLcnIT-FhYE1LzClO5YXS3AyKbq4hzh66qQX58anFBYnJqXmpJfHOfoaGZmYmJpZGJo7GxKgBAB6zLL8
ContentType Patent
DBID EVB
DatabaseName esp@cenet
DatabaseTitleList
Database_xml – sequence: 1
  dbid: EVB
  name: esp@cenet
  url: http://worldwide.espacenet.com/singleLineSearch?locale=en_EP
  sourceTypes: Open Access Repository
DeliveryMethod fulltext_linktorsrc
Discipline Medicine
Chemistry
Sciences
Physics
DocumentTitleAlternate 一种虚拟电厂调度资源方法
ExternalDocumentID CN116644924A
GroupedDBID EVB
ID FETCH-epo_espacenet_CN116644924A3
IEDL.DBID EVB
IngestDate Fri Sep 06 06:06:59 EDT 2024
IsOpenAccess true
IsPeerReviewed false
IsScholarly false
Language Chinese
English
LinkModel DirectLink
MergedId FETCHMERGED-epo_espacenet_CN116644924A3
Notes Application Number: CN202310632515
OpenAccessLink https://worldwide.espacenet.com/publicationDetails/biblio?FT=D&date=20230825&DB=EPODOC&CC=CN&NR=116644924A
ParticipantIDs epo_espacenet_CN116644924A
PublicationCentury 2000
PublicationDate 20230825
PublicationDateYYYYMMDD 2023-08-25
PublicationDate_xml – month: 08
  year: 2023
  text: 20230825
  day: 25
PublicationDecade 2020
PublicationYear 2023
RelatedCompanies GANGHUA SHUZHI ENERGY TECHNOLOGY (SHENZHEN) CO., LTD
RelatedCompanies_xml – name: GANGHUA SHUZHI ENERGY TECHNOLOGY (SHENZHEN) CO., LTD
Score 3.6246972
Snippet The invention provides a virtual power plant resource scheduling method which can be applied to the technical field of power scheduling. The method comprises...
SourceID epo
SourceType Open Access Repository
SubjectTerms CALCULATING
COMPUTING
COUNTING
DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FORADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORYOR FORECASTING PURPOSES
ELECTRIC DIGITAL DATA PROCESSING
PHYSICS
SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE,COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTINGPURPOSES, NOT OTHERWISE PROVIDED FOR
Title Virtual power plant resource scheduling method
URI https://worldwide.espacenet.com/publicationDetails/biblio?FT=D&date=20230825&DB=EPODOC&locale=&CC=CN&NR=116644924A
hasFullText 1
inHoldings 1
isFullTextHit
isPrint
link http://utb.summon.serialssolutions.com/2.0.0/link/0/eLvHCXMwfV3dS8MwED_m_HzTquj8IIL0rUq7pLUPRVzaMoR1Q-bY2-hHhhPpSlsR_Ou9xM75ok-BCxyXg8t9JPc7gOv5XUZZnEmgW5oYFC3IcOeUGhiZZLHjCJepmu4gsvvP9HHKpi14XfXCKJzQDwWOiBaVor3X6r4u1kUsX_2trG6TBZKW9-HY8_UmO7Yk-ArT_Z4XjIb-kOucezzSoyfPNG30_JhsPGzApgyjJc5-MOnJrpTit0sJ92FrhNzy-gBany8a7PLV5DUNdgbNg7cG2-qHZlohsbHC6hBuJotStn2QQo44I8UbaoeUTR2eYLqK7kN2mZPv8dBHcBUGY943UITZz3lnPFpL2z2Gdr7MxQkQl8UuFU5mmbjamKk4KXVpN8lYIjFWxCl0_ubT-W_zDPak7mSp1GLn0K7Ld3GBvrZOLpWSvgDBgYJ4
link.rule.ids 230,309,786,891,25594,76906
linkProvider European Patent Office
linkToHtml http://utb.summon.serialssolutions.com/2.0.0/link/0/eLvHCXMwfV1LS8NAEB5qfdSbRkXrK4LkFqXtbmIOQeymIWqTFomlt5BXsSJpSCKCv97ZNbVe9LQwC8PswOw8ducbgMvZTUJomHCgWxKpBC1INWaEqBiZJKGupwYVNV3X05xn8jCl0wa8LnthBE7ohwBHRIuK0d4rcV_nqyKWJf5WltfRHEmLW9s3LaXOjrscfIUqVt8cjEfWiCmMmcxTvCez09HQ82OycbcG6zpH5-Wh06TPu1Ly3y7F3oGNMXLLql1ofL5I0GLLyWsSbLn1g7cEm-KHZlwisbbCcg-uJvOCt33IOR9xJudvqB25qOvwMqar6D54l7n8PR56Hy7sgc8cFUUIfs4bMG8lbe8AmtkiSw9BNmhokFRPuh1cNcxU9JgYpBclNOIYK-kRtP_m0_5v8xxaju8Og-G993gM21yPvGzapSfQrIr39BT9bhWdCYV9AQPGhWU
openUrl ctx_ver=Z39.88-2004&ctx_enc=info%3Aofi%2Fenc%3AUTF-8&rfr_id=info%3Asid%2Fsummon.serialssolutions.com&rft_val_fmt=info%3Aofi%2Ffmt%3Akev%3Amtx%3Apatent&rft.title=Virtual+power+plant+resource+scheduling+method&rft.inventor=LYU+CHAOQING&rft.inventor=LIU+QIANG&rft.inventor=SHI+YE&rft.inventor=MA+XIANGZHUI&rft.inventor=JIN+HAO&rft.inventor=SU+HENGXUN&rft.inventor=HU+WUHUA&rft.inventor=WU+JIN&rft.date=2023-08-25&rft.externalDBID=A&rft.externalDocID=CN116644924A