Control modeling method and device of new energy power station in master station AGC system and medium

The invention discloses a control modeling method and device for a new energy power station in a master station AGC system and a medium. The method comprises the steps that a control area is established in the AGC system; establishing a control object logic model for each control object of the new e...

Full description

Saved in:
Bibliographic Details
Main Authors WU JIPING, CHEN SHIYUAN, GUO BINQI, XU RUI, YU CHANGHAI, ZHANG XIAOBAI, CHANG LI, CAO RONGZHANG, LIU AIMEI
Format Patent
LanguageChinese
English
Published 02.05.2023
Subjects
Online AccessGet full text

Cover

Loading…
More Information
Summary:The invention discloses a control modeling method and device for a new energy power station in a master station AGC system and a medium. The method comprises the steps that a control area is established in the AGC system; establishing a control object logic model for each control object of the new energy power station in the control area; establishing a station end monitoring system model for each control object of the new energy power station; obtaining measurement information of the station end monitoring system model associated with each control object, and performing synthesis processing; updating the operation information of the logic model of the control object according to the synthesis processing result of each control object; the method can adapt to the change of operation modes of different types of power generation systems at the station end, and provides a finer control object logic model and more reliable operation state information for the master station AGC. 本发明公开了新能源电站在主站AGC系统中的控制建模方法、装置及介质,其方
Bibliography:Application Number: CN202211575772