Green reservoir framework reconstruction sand prevention method
The invention belongs to the technical field of petroleum engineering, and particularly relates to a green reservoir framework reconstruction sand prevention method. The sand prevention method comprises but is not limited to the following steps: collection and pretreatment of stratum sand; the strat...
Saved in:
Main Authors | , , , , , , , , |
---|---|
Format | Patent |
Language | Chinese English |
Published |
25.04.2023
|
Subjects | |
Online Access | Get full text |
Cover
Loading…
Abstract | The invention belongs to the technical field of petroleum engineering, and particularly relates to a green reservoir framework reconstruction sand prevention method. The sand prevention method comprises but is not limited to the following steps: collection and pretreatment of stratum sand; the stratum sand and the sand-carrying liquid are mixed to form sand-suspending liquid; pumping the sand suspending liquid into the stratum; pumping the sand consolidation agent into the stratum; displacing fluid is pumped in, cement setting is waited, and the well is opened. According to the method, the stratum sand flushed out by the oil-water well in the same block replaces artificial quartz sand to be filled into an oil well reservoir, then the sand consolidation agent is squeezed into the stratum sand, the stratum sand is consolidated, an artificial well wall is built, a reservoir framework is reconstructed, a sand filtering pipe is replaced to serve as a sand prevention mode of a sand blocking barrier, meanwhile, envi |
---|---|
AbstractList | The invention belongs to the technical field of petroleum engineering, and particularly relates to a green reservoir framework reconstruction sand prevention method. The sand prevention method comprises but is not limited to the following steps: collection and pretreatment of stratum sand; the stratum sand and the sand-carrying liquid are mixed to form sand-suspending liquid; pumping the sand suspending liquid into the stratum; pumping the sand consolidation agent into the stratum; displacing fluid is pumped in, cement setting is waited, and the well is opened. According to the method, the stratum sand flushed out by the oil-water well in the same block replaces artificial quartz sand to be filled into an oil well reservoir, then the sand consolidation agent is squeezed into the stratum sand, the stratum sand is consolidated, an artificial well wall is built, a reservoir framework is reconstructed, a sand filtering pipe is replaced to serve as a sand prevention mode of a sand blocking barrier, meanwhile, envi |
Author | WEI FANG GAO XUEFENG JIANG JING WANG YONG JIA WEIXIA LIANG WEI CHEN GANG WU MINGMING CHEN XUE |
Author_xml | – fullname: WU MINGMING – fullname: CHEN GANG – fullname: CHEN XUE – fullname: LIANG WEI – fullname: JIA WEIXIA – fullname: WEI FANG – fullname: GAO XUEFENG – fullname: WANG YONG – fullname: JIANG JING |
BookMark | eNrjYmDJy89L5WSwdy9KTc1TKEotTi0qy88sUkgrSsxNLc8vygaKJefnFZcUlSaXZObnKRQn5qUoFBSllqXmgfm5qSUZ-Sk8DKxpiTnFqbxQmptB0c01xNlDN7UgPz61uCAxOTUvtSTe2c_Q0MzAwMzQ2MTRmBg1AB02M6M |
ContentType | Patent |
DBID | EVB |
DatabaseName | esp@cenet |
DatabaseTitleList | |
Database_xml | – sequence: 1 dbid: EVB name: esp@cenet url: http://worldwide.espacenet.com/singleLineSearch?locale=en_EP sourceTypes: Open Access Repository |
DeliveryMethod | fulltext_linktorsrc |
Discipline | Medicine Chemistry Sciences |
DocumentTitleAlternate | 一种绿色储层骨架再建防砂方法 |
ExternalDocumentID | CN116006134A |
GroupedDBID | EVB |
ID | FETCH-epo_espacenet_CN116006134A3 |
IEDL.DBID | EVB |
IngestDate | Fri Jul 19 14:23:25 EDT 2024 |
IsOpenAccess | true |
IsPeerReviewed | false |
IsScholarly | false |
Language | Chinese English |
LinkModel | DirectLink |
MergedId | FETCHMERGED-epo_espacenet_CN116006134A3 |
Notes | Application Number: CN202111234639 |
OpenAccessLink | https://worldwide.espacenet.com/publicationDetails/biblio?FT=D&date=20230425&DB=EPODOC&CC=CN&NR=116006134A |
ParticipantIDs | epo_espacenet_CN116006134A |
PublicationCentury | 2000 |
PublicationDate | 20230425 |
PublicationDateYYYYMMDD | 2023-04-25 |
PublicationDate_xml | – month: 04 year: 2023 text: 20230425 day: 25 |
PublicationDecade | 2020 |
PublicationYear | 2023 |
RelatedCompanies | CHINA PETROLEUM & CHEMICAL CORPORATION RESEARCH INSTITUTE OF PETROLEUM ENGINEERING, SINOPEC SHENGLI OILFIELD BRANCH |
RelatedCompanies_xml | – name: RESEARCH INSTITUTE OF PETROLEUM ENGINEERING, SINOPEC SHENGLI OILFIELD BRANCH – name: CHINA PETROLEUM & CHEMICAL CORPORATION |
Score | 3.5956917 |
Snippet | The invention belongs to the technical field of petroleum engineering, and particularly relates to a green reservoir framework reconstruction sand prevention... |
SourceID | epo |
SourceType | Open Access Repository |
SubjectTerms | EARTH DRILLING EARTH DRILLING, e.g. DEEP DRILLING FIXED CONSTRUCTIONS MINING OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR ASLURRY OF MINERALS FROM WELLS |
Title | Green reservoir framework reconstruction sand prevention method |
URI | https://worldwide.espacenet.com/publicationDetails/biblio?FT=D&date=20230425&DB=EPODOC&locale=&CC=CN&NR=116006134A |
hasFullText | 1 |
inHoldings | 1 |
isFullTextHit | |
isPrint | |
link | http://utb.summon.serialssolutions.com/2.0.0/link/0/eLvHCXMwY2BQSU00T0wBnfKZmGacBOygGFrqWholgQ4EMEiytDBITTMyA21O9vUz8wg18YowjWBiyILthQGfE1oOPhwRmKOSgfm9BFxeFyAGsVzAayuL9ZMygUL59m4hti5q0N4xaITTyFTNxcnWNcDfxd9ZzdnZ1tlPzS_I1tDQDFRbG5s4MjOwApvR5qDc4BrmBNqVUoBcpbgJMrAFAE3LKxFiYKrKEGbgdIbdvCbMwOELnfAGMqF5r1iEwR68REYBtF2oqCw_s0ghDbauSgHcq4WfBKtQnJiXolAAPZsJyIfcEi3KoOjmGuLsoQt0STzc2_HOfghHG4sxsOTl56VKMCgYJiYapYLOWTO2AHUXUpKS0iySTSwtDM2ANbexUYokgxRuc6TwSUozcIGCEDRXYmQqw8ACdHaqLLDKLUmSA4cVANeUhhc |
link.rule.ids | 230,309,783,888,25576,76876 |
linkProvider | European Patent Office |
linkToHtml | http://utb.summon.serialssolutions.com/2.0.0/link/0/eLvHCXMwY2BQSU00T0wBnfKZmGacBOygGFrqWholgQ4EMEiytDBITTMyA21O9vUz8wg18YowjWBiyILthQGfE1oOPhwRmKOSgfm9BFxeFyAGsVzAayuL9ZMygUL59m4hti5q0N4xaITTyFTNxcnWNcDfxd9ZzdnZ1tlPzS_I1tDQDFRbG5s4MjOwApvY5qDc4BrmBNqVUoBcpbgJMrAFAE3LKxFiYKrKEGbgdIbdvCbMwOELnfAGMqF5r1iEwR68REYBtF2oqCw_s0ghDbauSgHcq4WfBKtQnJiXolAAPZsJyIfcEi3KoOjmGuLsoQt0STzc2_HOfghHG4sxsOTl56VKMCgYJiYapYLOWTO2AHUXUpKS0iySTSwtDM2ANbexUYokgxRuc6TwScozcHqE-PrE-3j6eUszcIGCEzRvYmQqw8AC9EKqLLD6LUmSA4cbAE0TiQo |
openUrl | ctx_ver=Z39.88-2004&ctx_enc=info%3Aofi%2Fenc%3AUTF-8&rfr_id=info%3Asid%2Fsummon.serialssolutions.com&rft_val_fmt=info%3Aofi%2Ffmt%3Akev%3Amtx%3Apatent&rft.title=Green+reservoir+framework+reconstruction+sand+prevention+method&rft.inventor=WU+MINGMING&rft.inventor=CHEN+GANG&rft.inventor=CHEN+XUE&rft.inventor=LIANG+WEI&rft.inventor=JIA+WEIXIA&rft.inventor=WEI+FANG&rft.inventor=GAO+XUEFENG&rft.inventor=WANG+YONG&rft.inventor=JIANG+JING&rft.date=2023-04-25&rft.externalDBID=A&rft.externalDocID=CN116006134A |