Construction method for steel-concrete mixed section of cable-stayed bridge
The invention provides a construction method for a steel-concrete mixed section of a cable-stayed bridge, which is characterized by comprising the following steps of: pre-burying a thick steel plate for later welding of a stiff skeleton during construction of a mid-span No.15 beam section, meanwhile...
Saved in:
Main Authors | , , , , , , , , , , , , , , |
---|---|
Format | Patent |
Language | Chinese English |
Published |
04.04.2023
|
Subjects | |
Online Access | Get full text |
Cover
Loading…
Be the first to leave a comment!