Track translation lift truck for integrally installing fan
The rail translation lift truck comprises a lifting table, the lifting table is located in a shuttle tunnel, the lifting table makes contact with the inner wall of the shuttle tunnel, the upper surface of the lifting table is connected with a mounting support through threads, the mounting support is...
Saved in:
Main Authors | , , , , , , , , , |
---|---|
Format | Patent |
Language | Chinese English |
Published |
02.12.2022
|
Subjects | |
Online Access | Get full text |
Cover
Loading…
Summary: | The rail translation lift truck comprises a lifting table, the lifting table is located in a shuttle tunnel, the lifting table makes contact with the inner wall of the shuttle tunnel, the upper surface of the lifting table is connected with a mounting support through threads, the mounting support is provided with a fan, and the fan is arranged on the mounting support. The lower surface of the lifting platform is connected with a plurality of hydraulic jacks, the hydraulic jacks are installed in a rack, the lower surface of the rack is provided with four mutually symmetrical walking mechanisms used for moving, and the four walking mechanisms are located in the shuttle tunnel. The problems that after a fan is assembled at a wharf, the fan is integrally hoisted to a transport ship and transported to a wind field to complete integral hoisting, the integral hoisting is completed by a floating crane at present, the floating crane needs to move and adjust the position of the ship machine once when the fan is assembl |
---|---|
Bibliography: | Application Number: CN202211274307 |