Island outburst coal seam strong and weak coupling structure multi-disaster integrated prevention and control method

The invention discloses an island outburst coal seam strong and weak coupling structure multi-disaster integrated prevention and control method, which comprises the following steps of: laying a floor roadway on a lower overlying rock layer below a coal seam of an island working face, integrating mul...

Full description

Saved in:
Bibliographic Details
Main Authors HUO XIAOQUAN, ZHAI CHENG, MA LIQIANG, FANG YAJIE, QIAN ZIWEI, XU JIZHAO, ZHENG YANGFENG, HUANG WEI, YUE DONG
Format Patent
LanguageChinese
English
Published 18.10.2022
Subjects
Online AccessGet full text

Cover

Loading…
More Information
Summary:The invention discloses an island outburst coal seam strong and weak coupling structure multi-disaster integrated prevention and control method, which comprises the following steps of: laying a floor roadway on a lower overlying rock layer below a coal seam of an island working face, integrating multi-disaster integrated prevention and control measures into the floor roadway, and continuously draining accumulated water in goaf areas on two sides of the island working face; after completion, drilling a gas extraction partition hole in a coal pillar adjacent to the goaf, cutting off a channel through which gas flows to the coal roadway from the goaf, and injecting high-strength cement grout into two sides of the coal roadway to enhance the strength of the coal body and reduce deformation of the coal roadway; due to the fact that the rock burst phenomenon of the island working face roadway appears seriously, after grouting reinforcement is conducted on a coal seam, a strong-weak coupling structure is formed by a
Bibliography:Application Number: CN202210799819