Large-span steel trestle construction device and method in deep canyon area

The invention provides a deep canyon area large-span steel trestle construction device and method.The deep canyon area large-span steel trestle construction device comprises a first bridge pier and a second bridge pier which are arranged on the two sides of a river valley, a zero bridge abutment is...

Full description

Saved in:
Bibliographic Details
Main Authors FANG JIN, CUI YUEYA, ZHANG SHIKUI, YI XUE, JIANG SHUO, ZHANG ZHENGWU, CHEN HONGLIANG, LIU PENGXIANG, WANG HANLIN
Format Patent
LanguageChinese
English
Published 04.10.2022
Subjects
Online AccessGet full text

Cover

Loading…
More Information
Summary:The invention provides a deep canyon area large-span steel trestle construction device and method.The deep canyon area large-span steel trestle construction device comprises a first bridge pier and a second bridge pier which are arranged on the two sides of a river valley, a zero bridge abutment is arranged on the outer side of the first bridge pier, a reaction frame is arranged on the zero bridge abutment, a third bridge abutment is arranged on the outer side of the second bridge pier, and an L-shaped supporting base is arranged on the third bridge abutment; the first bridge pier and the second bridge pier are connected with a guide frame and a traction frame through steel pipe piles correspondingly, and the traction frame drags the military beam to the L-shaped supporting base from the zero bridge abutment through a cable. Construction is safe and efficient, field operation conditions are fully combined, the large-span temporary steel bridge with the main span being 40 m can be successfully installed in pla
Bibliography:Application Number: CN202210863829