Manual pipe jacking construction method

The invention discloses a manual pipe jacking construction method which comprises the following steps: measuring and positioning, including axis positioning and elevation positioning; grouting in advance to consolidate the soil body in the pipe jacking range to form a water insulation belt; control...

Full description

Saved in:
Bibliographic Details
Main Authors ZHANG DAOBING, LIN WEIJIE, DUAN PENGCHANG, PENG CHENG, LONG MINGHUA, WANG HONGWEN, HAO WENBO, LIU YUNLONG, XIONG SHENG, LIU KAI, TANG YU, LIU WENTUO, PENG XUEJUN, DUAN LEI, HE LINYUN, ZHANG JIAHUA, YANG WEI, YANG XIBIN, AN FANGXIN, LING TAO
Format Patent
LanguageChinese
English
Published 13.05.2022
Subjects
Online AccessGet full text

Cover

Loading…