Underwater guide frame construction process

The invention provides an underwater guide frame construction process. The process comprises the following steps that 1, an underwater guide frame is put to an exact position; 2, a sling of a crane is connected to the lower portion of a pile pipe; 3, a flat mouth hook driven by a winch is hooked to...

Full description

Saved in:
Bibliographic Details
Main Authors QIN CHENYANG, LIAO PENG, SANG QI, MA HONGLIN, LU JINGDONG, ZHANG REN, CHEN XIUZHEN, SHA YINGEN
Format Patent
LanguageChinese
English
Published 12.11.2021
Subjects
Online AccessGet full text

Cover

Loading…
More Information
Summary:The invention provides an underwater guide frame construction process. The process comprises the following steps that 1, an underwater guide frame is put to an exact position; 2, a sling of a crane is connected to the lower portion of a pile pipe; 3, a flat mouth hook driven by a winch is hooked to the pipe wall of the open end of the bottom of the pile pipe; 4, after the pile pipe is horizontally arranged on an overturning plate, the winch is matched with the overturning plate and the crane to overturn the pile pipe; 5, the pile pipe is downwards inserted into a guide sleeve of the underwater guide frame through the crane, and then a lifting hook on the sling is lifted after being separated from a lifting lug on the inner wall of the pile pipe; and 6, the step 4 and the step 5 are repeated until all the pile pipes are inserted into the corresponding guide sleeves. According to the underwater guide frame construction process, the inner lifting lug close to the bottom of the pile pipe is adopted, so that opera
Bibliography:Application Number: CN202110835717