Precast slab ballast bed construction method
The invention relates to a precast slab ballast bed construction method which comprises the following steps: preparation before use: firstly, processing a ballast bed slab and conveying the processedballast bed slab to a track laying base, installing a power supply cable in a tunnel, installing a tr...
Saved in:
Main Authors | , , , , , |
---|---|
Format | Patent |
Language | Chinese English |
Published |
22.01.2021
|
Subjects | |
Online Access | Get full text |
Cover
Loading…
Abstract | The invention relates to a precast slab ballast bed construction method which comprises the following steps: preparation before use: firstly, processing a ballast bed slab and conveying the processedballast bed slab to a track laying base, installing a power supply cable in a tunnel, installing a transition tool in advance at a wellhead of the tunnel or pouring a section of base into the tunnel,and installing a concrete blanking pipeline at the wellhead; and blanking, transporting materials, transporting plates, grabbing plates, finely adjusting the plates, fixing the ballast bed slab, pouring concrete, and after construction is finished, removing the fixing tool and finely adjusting and installing the track. The method has the advantages that the precast slabs are transported to a construction working face to be rapidly installed and laid, and the method is a prefabricated track laying method for urban rail transit engineering, the laying method is simple, and the construction speedis high. The assembly type |
---|---|
AbstractList | The invention relates to a precast slab ballast bed construction method which comprises the following steps: preparation before use: firstly, processing a ballast bed slab and conveying the processedballast bed slab to a track laying base, installing a power supply cable in a tunnel, installing a transition tool in advance at a wellhead of the tunnel or pouring a section of base into the tunnel,and installing a concrete blanking pipeline at the wellhead; and blanking, transporting materials, transporting plates, grabbing plates, finely adjusting the plates, fixing the ballast bed slab, pouring concrete, and after construction is finished, removing the fixing tool and finely adjusting and installing the track. The method has the advantages that the precast slabs are transported to a construction working face to be rapidly installed and laid, and the method is a prefabricated track laying method for urban rail transit engineering, the laying method is simple, and the construction speedis high. The assembly type |
Author | DAI BIAO SUN JUN PEI BAOJUN XUE HENGHE ZHOU HUI CHEN SHIXIANG |
Author_xml | – fullname: ZHOU HUI – fullname: CHEN SHIXIANG – fullname: SUN JUN – fullname: XUE HENGHE – fullname: PEI BAOJUN – fullname: DAI BIAO |
BookMark | eNrjYmDJy89L5WTQCShKTU4sLlEozklMUkhKzMkBcZJSUxSS8_OKS4pKk0sy8_MUclNLMvJTeBhY0xJzilN5oTQ3g6Kba4izh25qQX58anFBYnJqXmpJvLOfoaGRkamRgYW5ozExagCIvCuX |
ContentType | Patent |
DBID | EVB |
DatabaseName | esp@cenet |
DatabaseTitleList | |
Database_xml | – sequence: 1 dbid: EVB name: esp@cenet url: http://worldwide.espacenet.com/singleLineSearch?locale=en_EP sourceTypes: Open Access Repository |
DeliveryMethod | fulltext_linktorsrc |
Discipline | Medicine Chemistry Sciences |
DocumentTitleAlternate | 一种预制板道床施工方法 |
ExternalDocumentID | CN112252087A |
GroupedDBID | EVB |
ID | FETCH-epo_espacenet_CN112252087A3 |
IEDL.DBID | EVB |
IngestDate | Fri Jul 19 15:05:49 EDT 2024 |
IsOpenAccess | true |
IsPeerReviewed | false |
IsScholarly | false |
Language | Chinese English |
LinkModel | DirectLink |
MergedId | FETCHMERGED-epo_espacenet_CN112252087A3 |
Notes | Application Number: CN202011421263 |
OpenAccessLink | https://worldwide.espacenet.com/publicationDetails/biblio?FT=D&date=20210122&DB=EPODOC&CC=CN&NR=112252087A |
ParticipantIDs | epo_espacenet_CN112252087A |
PublicationCentury | 2000 |
PublicationDate | 20210122 |
PublicationDateYYYYMMDD | 2021-01-22 |
PublicationDate_xml | – month: 01 year: 2021 text: 20210122 day: 22 |
PublicationDecade | 2020 |
PublicationYear | 2021 |
RelatedCompanies | ANHUI XINGYU TRACK EQUIPMENT CO., LTD |
RelatedCompanies_xml | – name: ANHUI XINGYU TRACK EQUIPMENT CO., LTD |
Score | 3.437432 |
Snippet | The invention relates to a precast slab ballast bed construction method which comprises the following steps: preparation before use: firstly, processing a... |
SourceID | epo |
SourceType | Open Access Repository |
SubjectTerms | CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES FIXED CONSTRUCTIONS MACHINES FOR MAKING RAILWAYS OF ALL KINDS PERMANENT WAY PERMANENT-WAY TOOLS |
Title | Precast slab ballast bed construction method |
URI | https://worldwide.espacenet.com/publicationDetails/biblio?FT=D&date=20210122&DB=EPODOC&locale=&CC=CN&NR=112252087A |
hasFullText | 1 |
inHoldings | 1 |
isFullTextHit | |
isPrint | |
link | http://utb.summon.serialssolutions.com/2.0.0/link/0/eLvHCXMwfV3NS8MwFH_MKepNp6LzgwrSk8Eubddeiri0ZQjrikzZbSRNyvTgBi0I_vW-xM560Vs-4OUlj5f3keQXgBuhOPrlA0rQdrrEQ6kT7pUl4cpV0g-dwjdg1ZNsOH72Huf-vANvm7cwBif0w4AjokYVqO-12a_XbRIrNncrqzvxik2r-3QWxXYTHVONVkXteBQl-TSeMpuxiGV29hQhO9SnThg8bME2utGBvv6VvIz0q5T1b5OSHsBOjtTe60PofC57sMc2P6_1YHfSHHhjsdG96ghuc9yceFVbKERhCZ0Ax4pQ0ipWLQys9f0l9DFcp8mMjQkOu_iZ44JlLYfuCXQx9lenYOlYcVhKpxA88ApJueDoFHHlqIFbylCdQf9vOv3_Os9hX6-XziZQegFdZFNdon2txZVZmC_3kH7t |
link.rule.ids | 230,309,783,888,25578,76884 |
linkProvider | European Patent Office |
linkToHtml | http://utb.summon.serialssolutions.com/2.0.0/link/0/eLvHCXMwfV3NT4MwFH-Z0zhvOjVzfmFiOElkBTYuxLgCQR2MGDS7kRZK1INbAomJf72vyMSL3vqRvL725fV9tP0V4JILhn75iGhoOw3NRKlrzCwKjQlD5JatZ1YNVh1G4-DJvF9Yiw68rd_C1DihHzU4ImpUhvpe1fv1qk1iufXdyvKav2LT8sZPHFdtomMi0aqI6k4dL567c6pS6tBIjR4dZIdYRLcntxuwiS62LXH2veepfJWy-m1S_F3YipHae7UHnc-XPvTo-ue1PmyHzYE3FhvdK_fhKsbNiZWVgkLkCpcJcKxwkSvZsoWBVb6_hD6AC99LaKDhsOnPHFMatRwah9DF2F8MQJGx4rjI9YyziZnlhHGGThETuhgZRW6LIxj-TWf4X-c59IIknKWzu-jhGHbk2snMAiEn0EWWxSna2oqf1Yv0BRNJgd0 |
openUrl | ctx_ver=Z39.88-2004&ctx_enc=info%3Aofi%2Fenc%3AUTF-8&rfr_id=info%3Asid%2Fsummon.serialssolutions.com&rft_val_fmt=info%3Aofi%2Ffmt%3Akev%3Amtx%3Apatent&rft.title=Precast+slab+ballast+bed+construction+method&rft.inventor=ZHOU+HUI&rft.inventor=CHEN+SHIXIANG&rft.inventor=SUN+JUN&rft.inventor=XUE+HENGHE&rft.inventor=PEI+BAOJUN&rft.inventor=DAI+BIAO&rft.date=2021-01-22&rft.externalDBID=A&rft.externalDocID=CN112252087A |