Foundation pit water burst emergency processing construction method based on silt riprap stratum
The invention discloses a foundation pit water burstemergency processing construction method based on a silt riprap stratum. The foundation pit water burst emergency processing construction method comprises the following steps that S1, power is turned off, and Personnel withdraw; S2, water burst is...
Saved in:
Main Authors | , , , , , , , , , |
---|---|
Format | Patent |
Language | Chinese English |
Published |
28.12.2018
|
Subjects | |
Online Access | Get full text |
Cover
Loading…
Be the first to leave a comment!