Method for safely equipotentially transferring live workers of AC power transmission line
A method for safely equipotentially transferring live workers of an AC power transmission line includes the steps that after an equipotential work body is carried to a to-be-overhauled position of theline by a helicopter, the equipotential work body makes contact with an upper-phase conductor to for...
Saved in:
Main Authors | , , , , , , , , , , , , , |
---|---|
Format | Patent |
Language | Chinese English |
Published |
12.10.2018
|
Subjects | |
Online Access | Get full text |
Cover
Loading…
Be the first to leave a comment!