Filling ditch reclamation erosion gully treatment method

The invention discloses a filling ditch reclamation erosion gully treatment method, relates to the engineering technology of water and soil conservation, in particular to the filling ditch reclamation erosion gully treatment method, and solves the problems of land occupation by slope cutting, low la...

Full description

Saved in:
Bibliographic Details
Main Authors CHEN SHENGYONG, LI CHAO, HOU SHUYAN, ZHAO YI, LI WENCHAO, LIU HAOHUA, GAO RUI, LI WENYING, LIU JIANXIN, JU MINRUI, WEI LIN
Format Patent
LanguageChinese
English
Published 11.08.2017
Subjects
Online AccessGet full text

Cover

Loading…
More Information
Summary:The invention discloses a filling ditch reclamation erosion gully treatment method, relates to the engineering technology of water and soil conservation, in particular to the filling ditch reclamation erosion gully treatment method, and solves the problems of land occupation by slope cutting, low land utilization rate and no consideration of the channel drainage in a traditional erosion gully treatment method. The method comprises the steps of: (1) slope cutting; (2) vegetation planting; (3) construction of drainage facilities; (4) construction of water storage facilities; and (5) construction of trench bottom drainage facilities. The method changes a slope surface of a traditional waste gully to a terrace surface to improve the slope stability, and meanwhile, plants economic forests on field surfaces to generate additional economic benefits, increase the grain yield and improve the peasant incomes; the mated drainage facilities can effectively drain water from the slope surface to fully reduce the scour of t
Bibliography:Application Number: CN201611093040