Method for building a bridge and bridge-building apparatus
A method for building a bridge, said bridge (4) comprising piers (6) and at least one deck (8), the method comprising: - a cantilever step, wherein a girder (16) is set in a cantilevered position relative to a bank or to a constructed zone (12) of the bridge so that the girder comprises a first end...
Saved in:
Main Authors | , , , |
---|---|
Format | Patent |
Language | Chinese English |
Published |
19.04.2017
|
Subjects | |
Online Access | Get full text |
Cover
Loading…
Abstract | A method for building a bridge, said bridge (4) comprising piers (6) and at least one deck (8), the method comprising: - a cantilever step, wherein a girder (16) is set in a cantilevered position relative to a bank or to a constructed zone (12) of the bridge so that the girder comprises a first end (24) overhanging the bank or the constructed zone, and a second end (26) overhanging a construction zone (14) of the bridge, - a construction step, wherein pier elements and deck elements (10) are installed in said construction zone (14) via a first and a second lifting devices (18, 20) mounted movable on the girder (16) between the first and second ends (24, 26). The first and second lifting devices (18, 20) cross one another along the girder during the cantilever step and/or during the construction step. Associated bridge-building apparatus.
种建造桥梁的方法,所述桥梁(4)包括桥墩(6)以及至少个桥面(8),该方法包括:-悬臂步骤,其中,把主梁(16)设置在与河岸或桥梁建成区(12)相对的悬臂位置,所以主梁包括悬于所述河岸或所述建成区之上的第端(24)以及悬于桥梁施工区(14)之上的第二端(26),-施工步骤,其中,桥墩构件和桥面构件(10)通过第个升降装置和第二个升降装置(18、2 |
---|---|
AbstractList | A method for building a bridge, said bridge (4) comprising piers (6) and at least one deck (8), the method comprising: - a cantilever step, wherein a girder (16) is set in a cantilevered position relative to a bank or to a constructed zone (12) of the bridge so that the girder comprises a first end (24) overhanging the bank or the constructed zone, and a second end (26) overhanging a construction zone (14) of the bridge, - a construction step, wherein pier elements and deck elements (10) are installed in said construction zone (14) via a first and a second lifting devices (18, 20) mounted movable on the girder (16) between the first and second ends (24, 26). The first and second lifting devices (18, 20) cross one another along the girder during the cantilever step and/or during the construction step. Associated bridge-building apparatus.
种建造桥梁的方法,所述桥梁(4)包括桥墩(6)以及至少个桥面(8),该方法包括:-悬臂步骤,其中,把主梁(16)设置在与河岸或桥梁建成区(12)相对的悬臂位置,所以主梁包括悬于所述河岸或所述建成区之上的第端(24)以及悬于桥梁施工区(14)之上的第二端(26),-施工步骤,其中,桥墩构件和桥面构件(10)通过第个升降装置和第二个升降装置(18、2 |
Author | BERMINGHAM PATRICK D GABALDO STEFANO L MELLIER ERIK LE TREUT BRICE |
Author_xml | – fullname: GABALDO STEFANO L – fullname: BERMINGHAM PATRICK D – fullname: LE TREUT BRICE – fullname: MELLIER ERIK |
BookMark | eNrjYmDJy89L5WSw8k0tychPUUjLL1JIKs3MScnMS1dIVEgqykxJT1VIzEuBMnURkgUFiUWJJaXFPAysaYk5xam8UJqbQdHNNcTZQze1ID8-tbggMTk1L7Uk3tnP0MDM1NzExMTS0ZgYNQBNdDB_ |
ContentType | Patent |
DBID | EVB |
DatabaseName | esp@cenet |
DatabaseTitleList | |
Database_xml | – sequence: 1 dbid: EVB name: esp@cenet url: http://worldwide.espacenet.com/singleLineSearch?locale=en_EP sourceTypes: Open Access Repository |
DeliveryMethod | fulltext_linktorsrc |
Discipline | Medicine Chemistry Sciences |
DocumentTitleAlternate | 建造桥梁的方法及建造桥梁的装置 |
ExternalDocumentID | CN106574449A |
GroupedDBID | EVB |
ID | FETCH-epo_espacenet_CN106574449A3 |
IEDL.DBID | EVB |
IngestDate | Fri Jul 19 15:01:14 EDT 2024 |
IsOpenAccess | true |
IsPeerReviewed | false |
IsScholarly | false |
Language | Chinese English |
LinkModel | DirectLink |
MergedId | FETCHMERGED-epo_espacenet_CN106574449A3 |
Notes | Application Number: CN201480079994 |
OpenAccessLink | https://worldwide.espacenet.com/publicationDetails/biblio?FT=D&date=20170419&DB=EPODOC&CC=CN&NR=106574449A |
ParticipantIDs | epo_espacenet_CN106574449A |
PublicationCentury | 2000 |
PublicationDate | 20170419 |
PublicationDateYYYYMMDD | 2017-04-19 |
PublicationDate_xml | – month: 04 year: 2017 text: 20170419 day: 19 |
PublicationDecade | 2010 |
PublicationYear | 2017 |
RelatedCompanies | SOLETANCHE FREYSSINET |
RelatedCompanies_xml | – name: SOLETANCHE FREYSSINET |
Score | 3.2024412 |
Snippet | A method for building a bridge, said bridge (4) comprising piers (6) and at least one deck (8), the method comprising: - a cantilever step, wherein a girder... |
SourceID | epo |
SourceType | Open Access Repository |
SubjectTerms | ASSEMBLY OF BRIDGES CONSTRUCTION OF BRIDGES CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES FIXED CONSTRUCTIONS OR VIADUCTS |
Title | Method for building a bridge and bridge-building apparatus |
URI | https://worldwide.espacenet.com/publicationDetails/biblio?FT=D&date=20170419&DB=EPODOC&locale=&CC=CN&NR=106574449A |
hasFullText | 1 |
inHoldings | 1 |
isFullTextHit | |
isPrint | |
link | http://utb.summon.serialssolutions.com/2.0.0/link/0/eLvHCXMwfV3dS8MwED_mFPVNp6LzgwjSt2Bn03YVirh0ZQjthkzZ20ibDPWhK7ZD8K_3Gjvri74dCRyXg8vd5XK_A7jCmNhW6IpoX5kWZQvPpgL9FJWiL6wb0xaORtePYmf0xB5m9qwFb-teGI0T-qHBEdGiUrT3Ut_XefOIFei_lcV18opLy7tw6gdGnR33XJOhBQYDfzgZB2NucO7z2IgfMdZ1bJcx5t1vwCaG0a5O2p4HVVdK_tulhHuwNUFuWbkPrc-XDuzw9eS1DmxHdcEbydr2igO4jfSwZ4JRJknqYdZEkO-OKyIyWZO02cw1sPeqOITLcDjlI4pCzH9OPOdxI691BO1smaljIAtppkpKZrtphRwvvFQqC7NhVKuZSCZPoPs3n-5_m6ewW2mvKpP0vDNol-8rdY7etkwutJq-ACNmg84 |
link.rule.ids | 230,309,783,888,25577,76883 |
linkProvider | European Patent Office |
linkToHtml | http://utb.summon.serialssolutions.com/2.0.0/link/0/eLvHCXMwfV3dS8NADA9zivNNp6Lzq4L0rdjZ65dQxF1Xqq7dkCp7G9deh_rQFdsh-Nebnp31Rd_CHYRcIJfkcvkF4AJjYj1FV6RYqaopZG7rCkM_pXBmMe1K1Zkh0PWD0PCfyP1Un7bgbdULI3BCPwQ4IlpUgvZeivs6bx6xXPG3sriMX3FpceNFjivX2XHfVAlaoDtwhpOxO6YypQ4N5fARY11DNwkh9u0arGOIbYlU6XlQdaXkv12Ktw0bE-SWlTvQ-nzpQoeuJq91YTOoC95I1rZX7MJ1IIY9SxhlSnE9zFpi0nfHlcQyXpNKs5kLYO9lsQfn3jCivoJCzH5OPKNhI6-2D-1skaUHIM25mqScE91MKuR4Zic81TAbRrWqMSf8EHp_8-n9t3kGHT8KRrPRXfhwBFuVJquSSd8-hnb5vkxP0POW8alQ2Rd5SIa- |
openUrl | ctx_ver=Z39.88-2004&ctx_enc=info%3Aofi%2Fenc%3AUTF-8&rfr_id=info%3Asid%2Fsummon.serialssolutions.com&rft_val_fmt=info%3Aofi%2Ffmt%3Akev%3Amtx%3Apatent&rft.title=Method+for+building+a+bridge+and+bridge-building+apparatus&rft.inventor=GABALDO+STEFANO+L&rft.inventor=BERMINGHAM+PATRICK+D&rft.inventor=LE+TREUT+BRICE&rft.inventor=MELLIER+ERIK&rft.date=2017-04-19&rft.externalDBID=A&rft.externalDocID=CN106574449A |