Construction method of ardealite improved roadbed
A construction method of an ardealite improved roadbed is characterized by comprising the five steps of ardealite mixture treatment, mixture curing treatment, solidifying material water-adding preparation in proportion, solidifying material improvement anti-cracking treatment and site spreading and...
Saved in:
Main Authors | , , , , , , , , , , , , , , , , , |
---|---|
Format | Patent |
Language | Chinese English |
Published |
18.01.2017
|
Subjects | |
Online Access | Get full text |
Cover
Loading…
Abstract | A construction method of an ardealite improved roadbed is characterized by comprising the five steps of ardealite mixture treatment, mixture curing treatment, solidifying material water-adding preparation in proportion, solidifying material improvement anti-cracking treatment and site spreading and testing. The requirements for road base strength and rebound modulus can be met, the construction method can be widely applied in the region lack of filled earth and the region having higher solid ardealite waste yield, the occupation on cultivated land of ardealite can be decreased, the environmental damage caused by the ardealite is reduced, and the waster is changed into wealth. In addition, the ardealite is subjected to solidifying and improving treatment, differential settlement of the roadbed can be reduced, the problem of differential settlement caused by the fact that a traditional roadbed adopts disordered fillers and is not well compacted is solved, and the service life of the roadbed is prolonged.
种磷石膏改良 |
---|---|
AbstractList | A construction method of an ardealite improved roadbed is characterized by comprising the five steps of ardealite mixture treatment, mixture curing treatment, solidifying material water-adding preparation in proportion, solidifying material improvement anti-cracking treatment and site spreading and testing. The requirements for road base strength and rebound modulus can be met, the construction method can be widely applied in the region lack of filled earth and the region having higher solid ardealite waste yield, the occupation on cultivated land of ardealite can be decreased, the environmental damage caused by the ardealite is reduced, and the waster is changed into wealth. In addition, the ardealite is subjected to solidifying and improving treatment, differential settlement of the roadbed can be reduced, the problem of differential settlement caused by the fact that a traditional roadbed adopts disordered fillers and is not well compacted is solved, and the service life of the roadbed is prolonged.
种磷石膏改良 |
Author | QIAN KUN ZENG LI FANG SHAOLIN WU SHANGFENG LI ZHIQING ZHANG SHIHUA HU DEJUN ZHANG XIAOFENG MIAO SHENGYUAN WU JIZHONG LI DANDAN KONG LINGWEI FAN SILIN LI WEN CHEN WU YANG JUNHONG ZENG WEICHENG ZHOU YINGXIN |
Author_xml | – fullname: LI ZHIQING – fullname: MIAO SHENGYUAN – fullname: QIAN KUN – fullname: FAN SILIN – fullname: ZENG WEICHENG – fullname: HU DEJUN – fullname: ZHANG SHIHUA – fullname: KONG LINGWEI – fullname: YANG JUNHONG – fullname: ZHANG XIAOFENG – fullname: LI WEN – fullname: WU SHANGFENG – fullname: CHEN WU – fullname: ZENG LI – fullname: WU JIZHONG – fullname: LI DANDAN – fullname: FANG SHAOLIN – fullname: ZHOU YINGXIN |
BookMark | eNrjYmDJy89L5WQwdM7PKy4pKk0uyczPU8hNLcnIT1HIT1NILEpJTczJLElVyMwtKMovS01RKMpPTElKTeFhYE1LzClO5YXS3AyKbq4hzh66qQX58anFBYnJqXmpJfHOfoYGZsbG5sYm5o7GxKgBALYaLb0 |
ContentType | Patent |
DBID | EVB |
DatabaseName | esp@cenet |
DatabaseTitleList | |
Database_xml | – sequence: 1 dbid: EVB name: esp@cenet url: http://worldwide.espacenet.com/singleLineSearch?locale=en_EP sourceTypes: Open Access Repository |
DeliveryMethod | fulltext_linktorsrc |
Discipline | Medicine Chemistry Sciences |
DocumentTitleAlternate | 种磷石膏改良路基的施工方法 |
ExternalDocumentID | CN106337347A |
GroupedDBID | EVB |
ID | FETCH-epo_espacenet_CN106337347A3 |
IEDL.DBID | EVB |
IngestDate | Fri Jul 19 17:08:40 EDT 2024 |
IsOpenAccess | true |
IsPeerReviewed | false |
IsScholarly | false |
Language | Chinese English |
LinkModel | DirectLink |
MergedId | FETCHMERGED-epo_espacenet_CN106337347A3 |
Notes | Application Number: CN20161942265 |
OpenAccessLink | https://worldwide.espacenet.com/publicationDetails/biblio?FT=D&date=20170118&DB=EPODOC&CC=CN&NR=106337347A |
ParticipantIDs | epo_espacenet_CN106337347A |
PublicationCentury | 2000 |
PublicationDate | 20170118 |
PublicationDateYYYYMMDD | 2017-01-18 |
PublicationDate_xml | – month: 01 year: 2017 text: 20170118 day: 18 |
PublicationDecade | 2010 |
PublicationYear | 2017 |
RelatedCompanies | INSTITUTE OF GEOLOGY AND GEOPHYSICS, CHINESE ACADEMY OF SCIENCES |
RelatedCompanies_xml | – name: INSTITUTE OF GEOLOGY AND GEOPHYSICS, CHINESE ACADEMY OF SCIENCES |
Score | 3.1884513 |
Snippet | A construction method of an ardealite improved roadbed is characterized by comprising the five steps of ardealite mixture treatment, mixture curing treatment,... |
SourceID | epo |
SourceType | Open Access Repository |
SubjectTerms | CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, ORTHE LIKE FIXED CONSTRUCTIONS MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR |
Title | Construction method of ardealite improved roadbed |
URI | https://worldwide.espacenet.com/publicationDetails/biblio?FT=D&date=20170118&DB=EPODOC&locale=&CC=CN&NR=106337347A |
hasFullText | 1 |
inHoldings | 1 |
isFullTextHit | |
isPrint | |
link | http://utb.summon.serialssolutions.com/2.0.0/link/0/eLvHCXMwfV3dS8MwED_mFPVNp6LzgwjStyJtsnZ7KOLSliGsGzJlb6NpEzYf2uEKgn-9l9g6X_QtJJBPfrnfXXJ3AHd97b7pDTxbOogm5lHfFoIqxBXrZcJ31MB4vY8Tb_TCnua9eQveGl8YEyf0wwRHRERliPfK3NfrrRErNH8rN_dihVXlQzwLQqvWjnVwcYRzOAyi6SSccIvzgCdW8oxc16PUp8x_3IFdpNG-RkP0OtReKevfIiU-gr0p9lZUx9D6XHbggDeZ1zqwP64fvLFYY29zAo7OrdlEeyXfmZ9JqQgesdRkWpKVMRDInLyXaS5kfgq3cTTjIxvHXvwsdMGT7TTpGbSLspDnQFzlZtLJqXBZxlKJlEugmuSkTCEZoUpdQPfvfrr_NV7Cod40bVJw-lfQxkXIaxSylbgxu_MF7DGAHQ |
link.rule.ids | 230,309,783,888,25576,76876 |
linkProvider | European Patent Office |
linkToHtml | http://utb.summon.serialssolutions.com/2.0.0/link/0/eLvHCXMwfV3dS8MwED_mFOebTmXOrwqytyJtsnZ7KOLSlqpbN2TK3krTJjgf1uEKgn-9l7g6X_QtJJBPfrnfXXJ3ANc95b7p9B1TWIgm6hDX5JxIxBXtZty1ZF97vY9iJ3qmD7PurAZvlS-MjhP6oYMjIqIyxHup7-vlxojl67-Vqxs-x6riNpx6fmetHavg4ghnf-AFk7E_Zh3GPBZ34ifkug4hLqHu3RZsI8V2FRqCl4HySln-FinhPuxMsLdFeQC1z9cmNFiVea0Ju6P1gzcW19hbHYKlcmtW0V6N78zPRiENPGKhyLQw5tpAIHLjvUhzLvIjuAqDKYtMHDv5WWjC4s00yTHUF8VCtMCwpZ0JKyfcphlNBVIujmqSlVKJZIRIeQLtv_tp_9d4CY1oOhomw_v48RT21AYq84LVO4M6Lkico8At-YXeqS8ZYoMQ |
openUrl | ctx_ver=Z39.88-2004&ctx_enc=info%3Aofi%2Fenc%3AUTF-8&rfr_id=info%3Asid%2Fsummon.serialssolutions.com&rft_val_fmt=info%3Aofi%2Ffmt%3Akev%3Amtx%3Apatent&rft.title=Construction+method+of+ardealite+improved+roadbed&rft.inventor=LI+ZHIQING&rft.inventor=MIAO+SHENGYUAN&rft.inventor=QIAN+KUN&rft.inventor=FAN+SILIN&rft.inventor=ZENG+WEICHENG&rft.inventor=HU+DEJUN&rft.inventor=ZHANG+SHIHUA&rft.inventor=KONG+LINGWEI&rft.inventor=YANG+JUNHONG&rft.inventor=ZHANG+XIAOFENG&rft.inventor=LI+WEN&rft.inventor=WU+SHANGFENG&rft.inventor=CHEN+WU&rft.inventor=ZENG+LI&rft.inventor=WU+JIZHONG&rft.inventor=LI+DANDAN&rft.inventor=FANG+SHAOLIN&rft.inventor=ZHOU+YINGXIN&rft.date=2017-01-18&rft.externalDBID=A&rft.externalDocID=CN106337347A |