Control of fracture growth during well operation

A dissipation equilibrium value for a well operation may be determined based on a height of a fracture within a layer and a limit on the change of the height of the fracture (fracture height change limit). A pressure limit for the well operation may be determined based on the dissipation equilibrium...

Full description

Saved in:
Bibliographic Details
Main Authors Bunger, Andrew Paul, Lu, Qiao, Zaki, Karim S, Adachi, Jose I, El-Fayoumi, Amr Said
Format Patent
LanguageEnglish
Published 08.08.2024
Subjects
Online AccessGet full text

Cover

Loading…