Successful slab construction: steel-fibre floor in Peterborough

Describes the construction of a steel-fibre reinforced concrete ground floor slab on a large distribution centre for IKEA Ltd., Peterborough. Constructed by Twintec Industrial Flooring of Rugby, the entire slab was suspended on 250mm or 300mm square driven precast concrete piles on a grid greater th...

Full description

Saved in:
Bibliographic Details
Published inConcrete Vol. 37; no. 4; pp. 49 - 51
Main Author EDDY, Darryl
Format Magazine Article Trade Publication Article
LanguageEnglish
Published Slough Concrete Society 01.04.2003
The Concrete Society
Subjects
Online AccessGet full text

Cover

Loading…
More Information
Summary:Describes the construction of a steel-fibre reinforced concrete ground floor slab on a large distribution centre for IKEA Ltd., Peterborough. Constructed by Twintec Industrial Flooring of Rugby, the entire slab was suspended on 250mm or 300mm square driven precast concrete piles on a grid greater than 4 x 4m. The abrasion resistance and flatness of the floor are outstanding.
Bibliography:ObjectType-Article-2
SourceType-Scholarly Journals-1
ObjectType-Feature-1
content type line 23
ISSN:0010-5317