The IT project for power plants initiated domestically in 2005 necessitates the power equipment facility and the controllers for those to be sufficiently adaptable for automation system for power substations. This implies that the power plants using power equipments must be developed to satisfy the...

Full description

Saved in:
Bibliographic Details
Published in전기학회 논문지 P권, 59(1) Vol. 59; no. 1; pp. 35 - 39
Main Authors 우천희(Chun-Hee Woo), 이보인(Bo-In Lee)
Format Journal Article
LanguageKorean
Published 대한전기학회 2010
Subjects
Online AccessGet full text
ISSN1229-800X
2586-7792

Cover

Abstract The IT project for power plants initiated domestically in 2005 necessitates the power equipment facility and the controllers for those to be sufficiently adaptable for automation system for power substations. This implies that the power plants using power equipments must be developed to satisfy the IEC61850 standards. The IEC61850 communication standards that all power equipment and facility and controllers installed in automation system for power substations must follow has had its Parts 3 and Part 4 established as international standard in January 2002 and Part 10 in May 2005, the last to become international standard. Hence all separate parts of the original IEC61850 standard came to be established as international standards. As a consequence, after 2005, in most power substations around the world the IEC61850 standard is being applied and the prominent makers are geared towards manufacturing products to the IEC61850 standard. The IEC61850 is being recognized as an essential standard that must be applied to not only power substations but for automation of power systems and communication systems. In this research, the Gateway device that connects current SCADA system and IEC61580 based system has been domesticated with Korea‘s own technology and extensive testing was carried out in order to obtain confidence in its performance.
AbstractList The IT project for power plants initiated domestically in 2005 necessitates the power equipment facility and the controllers for those to be sufficiently adaptable for automation system for power substations. This implies that the power plants using power equipments must be developed to satisfy the IEC61850 standards. The IEC61850 communication standards that all power equipment and facility and controllers installed in automation system for power substations must follow has had its Parts 3 and Part 4 established as international standard in January 2002 and Part 10 in May 2005, the last to become international standard. Hence all separate parts of the original IEC61850 standard came to be established as international standards. As a consequence, after 2005, in most power substations around the world the IEC61850 standard is being applied and the prominent makers are geared towards manufacturing products to the IEC61850 standard. The IEC61850 is being recognized as an essential standard that must be applied to not only power substations but for automation of power systems and communication systems. In this research, the Gateway device that connects current SCADA system and IEC61580 based system has been domesticated with Korea’s own technology and extensive testing was carried out in order to obtain confidence in its performance. KCI Citation Count: 3
The IT project for power plants initiated domestically in 2005 necessitates the power equipment facility and the controllers for those to be sufficiently adaptable for automation system for power substations. This implies that the power plants using power equipments must be developed to satisfy the IEC61850 standards. The IEC61850 communication standards that all power equipment and facility and controllers installed in automation system for power substations must follow has had its Parts 3 and Part 4 established as international standard in January 2002 and Part 10 in May 2005, the last to become international standard. Hence all separate parts of the original IEC61850 standard came to be established as international standards. As a consequence, after 2005, in most power substations around the world the IEC61850 standard is being applied and the prominent makers are geared towards manufacturing products to the IEC61850 standard. The IEC61850 is being recognized as an essential standard that must be applied to not only power substations but for automation of power systems and communication systems. In this research, the Gateway device that connects current SCADA system and IEC61580 based system has been domesticated with Korea‘s own technology and extensive testing was carried out in order to obtain confidence in its performance.
Author 이보인(Bo-In Lee)
우천희(Chun-Hee Woo)
Author_xml – sequence: 1
  fullname: 우천희(Chun-Hee Woo)
– sequence: 2
  fullname: 이보인(Bo-In Lee)
BackLink https://www.kci.go.kr/kciportal/ci/sereArticleSearch/ciSereArtiView.kci?sereArticleSearchBean.artiId=ART001424627$$DAccess content in National Research Foundation of Korea (NRF)
BookMark eNpFzD9Lw0AcxvFDKlhr30MWwSXwu8vl_oylVq0WC5LB7Uh6d3KkppLo4O5UC46K1lHQrYqDr6lN34PRCk7PZ_jybKJaNsrMGqqTUDCfc0lqqI4Jkb4AON1AzaJwCVDKWUAIrqOg22kzLEIoH9-8-cekfP5cjr_Kp9cK3nw2Xcym3mJ255U374vxS3k7Xd4_bKF1Gw8L0_zbBor2OlH7wO_197vtVs9PZcB9a5gFrqmkkhmCNRNGGwsE4EchS0RFS02sRSKx0dYO5ABEgi3RjCQsaKCd1W2WW5UOnBrF7nfPRirNVesk6ioccsZ5lW6v0tQVl05luhiqw9ZRnwAGTBgFLjBm9L_LrnJ3brSL1UWFOL9Wx_3dDuBAVjkPvgHmL2ia
ContentType Journal Article
DBID DBRKI
TDB
JDI
ACYCR
DEWEY 620
621.3
620.11297
DatabaseName DBPIA - 디비피아
Nurimedia DBPIA Journals
KoreaScience
Korean Citation Index
DatabaseTitleList

DeliveryMethod fulltext_linktorsrc
Discipline Engineering
DocumentTitleAlternate The Development of IEC61850 Gateway and the Performance Test
DocumentTitle_FL The Development of IEC61850 Gateway and the Performance Test
EISSN 2586-7792
EndPage 39
ExternalDocumentID oai_kci_go_kr_ARTI_157677
JAKO201012640781164
NODE01391267
GroupedDBID .UV
ALMA_UNASSIGNED_HOLDINGS
DBRKI
TDB
JDI
ACYCR
M~E
ID FETCH-LOGICAL-k937-fe6f07d49496e21d68edef020068ed56b8200f4ead8b91edffc9c08b1f2d62b63
ISSN 1229-800X
IngestDate Tue Nov 21 21:41:32 EST 2023
Fri Dec 22 12:04:04 EST 2023
Thu Feb 06 13:27:11 EST 2025
IsOpenAccess true
IsPeerReviewed false
IsScholarly true
Issue 1
Keywords Type Test
IEC61850
IED
Gateway
DNP3.0
PMS
0
DNP3
Language Korean
LinkModel OpenURL
MergedId FETCHMERGED-LOGICAL-k937-fe6f07d49496e21d68edef020068ed56b8200f4ead8b91edffc9c08b1f2d62b63
Notes KISTI1.1003/JNL.JAKO201012640781164
G704-001568.2010.59.1.011
OpenAccessLink http://click.ndsl.kr/servlet/LinkingDetailView?cn=JAKO201012640781164&dbt=JAKO&org_code=O481&site_code=SS1481&service_code=01
PageCount 5
ParticipantIDs nrf_kci_oai_kci_go_kr_ARTI_157677
kisti_ndsl_JAKO201012640781164
nurimedia_primary_NODE01391267
PublicationCentury 2000
PublicationDate 2010
PublicationDateYYYYMMDD 2010-01-01
PublicationDate_xml – year: 2010
  text: 2010
PublicationDecade 2010
PublicationTitle 전기학회 논문지 P권, 59(1)
PublicationTitleAlternate 전기학회논문지. The Transactions of the Korean Institute of Electrical Engineers. P
PublicationYear 2010
Publisher 대한전기학회
Publisher_xml – name: 대한전기학회
SSID ssib044763221
ssib005299917
ssib013785837
ssib053377038
ssib006781898
ssib036278838
ssib022234313
ssib012146194
Score 1.7131602
Snippet The IT project for power plants initiated domestically in 2005 necessitates the power equipment facility and the controllers for those to be sufficiently...
SourceID nrf
kisti
nurimedia
SourceType Open Website
Open Access Repository
Publisher
StartPage 35
SubjectTerms 전기공학
Title IEC61850용 게이트웨이 개발 및 성능시험
URI https://www.dbpia.co.kr/journal/articleDetail?nodeId=NODE01391267
http://click.ndsl.kr/servlet/LinkingDetailView?cn=JAKO201012640781164&dbt=JAKO&org_code=O481&site_code=SS1481&service_code=01
https://www.kci.go.kr/kciportal/ci/sereArticleSearch/ciSereArtiView.kci?sereArticleSearchBean.artiId=ART001424627
Volume 59
hasFullText 1
inHoldings 1
isFullTextHit
isPrint
ispartofPNX 전기학회 논문지 P권, 2010, 59(1), , pp.35-39
link http://utb.summon.serialssolutions.com/2.0.0/link/0/eLvHCXMwnV3NjtMwELaqvcAFgQCx_KyChE9VUOIkjnNM0qzaRbt7KVJvUX4cWBWlq9JeOHDitCBxBEE5IsGtIA68A2-y7b4DM07aBoTEwiUZTWzHk7HG3zjjMSH3kJ8UCddtL3F0O2GJLjLL0IWTO6mUEpwS3O-8f8C7D-29gTNotX40opamk_R-9uyP-0r-R6vAA73iLtl_0Oy6UWAADfqFK2gYrufScS8KOcyEBo1C6vnUBwc_8mnAqAgVq0MDm0YdKoApFCegvlg_qkob1IPSQUW0a0rstrGYsGlgIgta8B3FCVTxDvVcWh3svIK2-NQ3sEqkXgetYDGHep4ifNUraMqhgSL8sO6V71JhbDaa1dIESiwQpn5fByswET6elnpXYhjQqLGM0ZAXBLAUUXEExcS5eq9sq6Ajr7nOUce64phUXQsx8KPudXgegRo2nTEPJmJjUE15isccwcGx8H6ZCOrU5M0BX1n1KqFKjQ-q3Eu_Jek-OOxECKZNxjGzAaA-DC_cfx5tbB1DKN7Y0-sCVNq4uqblCkdsoCLCNsB2a9sJOMMVjT_ctg0TA9tAL0DtLhhvtfNzJS_4W-iEHAFsKseAti6UUzwyAuxOA0L1L5NLte-j-dVAvkJaw9FVYq0G8fLdZ-3066vlh29nJ9-X7z8BoZ3OZ4v5TFvMX2vLF18WJx-XL2dnb95eI_3dqB929fokD30I8FcvJC8MN8dESFwyM-dC5rIwcDULKIenAEONwgajJlLPlHlRZF5miNQsWM5Zyq3rZKsclfIG0SxXZkKadmpZUIElws5ZUbi5EDm4AoazTXaUzHGZP30S7_kPDnEsgVrwf7Vpcnub3IWPEQ-zoxgzq-P90SgejmPwH3uxCe6360Ij608VH1dZX-Kmim_-rcAtcrEKM8G1uttkazKeyjuAXifpjhoWPwH4HHVl
linkProvider ISSN International Centre
openUrl ctx_ver=Z39.88-2004&ctx_enc=info%3Aofi%2Fenc%3AUTF-8&rfr_id=info%3Asid%2Fsummon.serialssolutions.com&rft_val_fmt=info%3Aofi%2Ffmt%3Akev%3Amtx%3Ajournal&rft.genre=article&rft.atitle=IEC61850%EC%9A%A9+%EA%B2%8C%EC%9D%B4%ED%8A%B8%EC%9B%A8%EC%9D%B4+%EA%B0%9C%EB%B0%9C+%EB%B0%8F+%EC%84%B1%EB%8A%A5%EC%8B%9C%ED%97%98&rft.jtitle=%EC%A0%84%EA%B8%B0%ED%95%99%ED%9A%8C%EB%85%BC%EB%AC%B8%EC%A7%80+P&rft.au=%EC%9A%B0%EC%B2%9C%ED%9D%AC%28Chun-Hee+Woo%29&rft.au=%EC%9D%B4%EB%B3%B4%EC%9D%B8%28Bo-In+Lee%29&rft.date=2010&rft.pub=%EB%8C%80%ED%95%9C%EC%A0%84%EA%B8%B0%ED%95%99%ED%9A%8C&rft.issn=1229-800X&rft.eissn=2586-7792&rft.volume=59&rft.issue=1&rft.spage=35&rft.epage=39&rft.externalDocID=NODE01391267
thumbnail_l http://covers-cdn.summon.serialssolutions.com/index.aspx?isbn=/lc.gif&issn=1229-800X&client=summon
thumbnail_m http://covers-cdn.summon.serialssolutions.com/index.aspx?isbn=/mc.gif&issn=1229-800X&client=summon
thumbnail_s http://covers-cdn.summon.serialssolutions.com/index.aspx?isbn=/sc.gif&issn=1229-800X&client=summon