PSC Beam교 환경부하량 추정을 위한 인공신경망 모델 적용 연구

Considering that earlier stage of construction project has a great influence on the possibility of lowering of environmental load, it is important to build and utilize system that can support effective decision making at the initial stage of the project. In this study, we constructed an environmenta...

Full description

Saved in:
Bibliographic Details
Published in한국건설관리학회 논문집, 19(4) Vol. 19; no. 4; pp. 82 - 92
Main Authors 김의왕, 윤원건, 김경주, Kim, Eu Wang, Yun, Won Gun, Kim, Kyong Ju
Format Journal Article
LanguageKorean
Published 한국건설관리학회 01.07.2018
Subjects
Online AccessGet full text
ISSN2005-6095
2465-9703
DOI10.6106/KJCEM.2018.19.4.082

Cover

Abstract Considering that earlier stage of construction project has a great influence on the possibility of lowering of environmental load, it is important to build and utilize system that can support effective decision making at the initial stage of the project. In this study, we constructed an environmental load estimation model that can be used at the early stage of the project using basic design factors. The model was constructed by using the artificial neural network to estimate environmental load by applying to planning stage (ANN-1), basic design stage (ANN-2). The result of test, shows that average of absolute measuring efficiency and standard deviation of ANN-1 and ANN-2 were 11.19% / 5.30% and 9.59% / 3.09% each. This result indicates that the model using the input variables extended with the project progress has high reliability and it is considered to be effective in decision support at the initial design stage of the project. 건설사업 초기단계가 환경부하량의 절감 가능성에 큰 영향을 미친다는 것을 감안한다면, 효과적인 의사결정을 지원할 수 있는 시스템을 초기에 구축하고 활용하는 것이 중요하다. 이에 본 연구에서는 기본적인 설계 요인들을 고려하여 초기 설계단계에서 활용될 수 있는 환경부하량 산정 모델을 구축하였다. 이 모델은 인공신경망 기법을 활용하고 설계단계 업무가 진행됨에 따라 얻을 수 있는 가용정보 수준을 고려하여 기획단계 적용 모델(ANN-1)과 기본 설계단계 적용 모델(ANN-2)로 구분하여 환경부하량을 산정하도록 구축되었다. 모델의 실험결과 ANN-1, ANN-2모델의 절대평균오차율과 표준편차는 각각 11.19% / 5.30% 및 9.59% / 3.09%로 높은 신뢰성을 갖는 것으로 나타났다. 본 모델은 프로젝트 초기단계별 기초적인 가용정보만을 활용하여 신속하고 정확하게 환경부하량을 추정하고 합리적인 의사결정을 지원할 수 있을 것으로 기대된다.
AbstractList 건설사업 초기단계가 환경부하량의 절감 가능성에 큰 영향을 미친다는 것을 감안한다면, 효과적인 의사결정을 지원할 수 있는 시스템을 초기에 구축하고 활용하는 것이 중요하다. 이에 본 연구에서는 기본적인 설계 요인들을 고려하여 초기 설계단계에서 활용될 수 있는 환경부하량 산정 모델을 구축하였다. 이 모델은 인공신경망 기법을 활용하고 설계단계 업무가 진행됨에 따라 얻을 수 있는 가용정보 수준을 고려하여 기획단계 적용 모델(ANN-1)과 기본 설계단계 적용 모델(ANN-2)로 구분하여 환경부하량을 산정하도록 구축되었다. 모델의 실험결과 ANN-1, ANN-2모델의 절대평균오차율과 표준편차는 각각 11.19% / 5.30% 및 9.59% / 3.09%로 높은 신뢰성을 갖는 것으로 나타났다. 본 모델은 프로젝트 초기단계별 기초적인 가용정보만을 활용하여 신속하고 정확하게 환경부하량을 추정하고 합리적인 의사결정을 지원할 수 있을 것으로 기대된다. Considering that earlier stage of construction project has a great influence on the possibility of lowering of environmental load, it is important to build and utilize system that can support effective decision making at the initial stage of the project. In this study, we constructed an environmental load estimation model that can be used at the early stage of the project using basic design factors. The model was constructed by using the artificial neural network to estimate environmental load by applying to planning stage (ANN-1), basic design stage (ANN-2). The result of test, shows that average of absolute measuring efficiency and standard deviation of ANN-1 and ANN-2 were 11.19% / 5.30% and 9.59% / 3.09% each. This result indicates that the model using the input variables extended with the project progress has high reliability and it is considered to be effective in decision support at the initial design stage of the project. KCI Citation Count: 0
Considering that earlier stage of construction project has a great influence on the possibility of lowering of environmental load, it is important to build and utilize system that can support effective decision making at the initial stage of the project. In this study, we constructed an environmental load estimation model that can be used at the early stage of the project using basic design factors. The model was constructed by using the artificial neural network to estimate environmental load by applying to planning stage (ANN-1), basic design stage (ANN-2). The result of test, shows that average of absolute measuring efficiency and standard deviation of ANN-1 and ANN-2 were 11.19% / 5.30% and 9.59% / 3.09% each. This result indicates that the model using the input variables extended with the project progress has high reliability and it is considered to be effective in decision support at the initial design stage of the project. 건설사업 초기단계가 환경부하량의 절감 가능성에 큰 영향을 미친다는 것을 감안한다면, 효과적인 의사결정을 지원할 수 있는 시스템을 초기에 구축하고 활용하는 것이 중요하다. 이에 본 연구에서는 기본적인 설계 요인들을 고려하여 초기 설계단계에서 활용될 수 있는 환경부하량 산정 모델을 구축하였다. 이 모델은 인공신경망 기법을 활용하고 설계단계 업무가 진행됨에 따라 얻을 수 있는 가용정보 수준을 고려하여 기획단계 적용 모델(ANN-1)과 기본 설계단계 적용 모델(ANN-2)로 구분하여 환경부하량을 산정하도록 구축되었다. 모델의 실험결과 ANN-1, ANN-2모델의 절대평균오차율과 표준편차는 각각 11.19% / 5.30% 및 9.59% / 3.09%로 높은 신뢰성을 갖는 것으로 나타났다. 본 모델은 프로젝트 초기단계별 기초적인 가용정보만을 활용하여 신속하고 정확하게 환경부하량을 추정하고 합리적인 의사결정을 지원할 수 있을 것으로 기대된다.
Author 김의왕
Kim, Kyong Ju
윤원건
김경주
Yun, Won Gun
Kim, Eu Wang
Author_xml – sequence: 1
  fullname: 김의왕
– sequence: 2
  fullname: 윤원건
– sequence: 3
  fullname: 김경주
– sequence: 4
  fullname: Kim, Eu Wang
– sequence: 5
  fullname: Yun, Won Gun
– sequence: 6
  fullname: Kim, Kyong Ju
BackLink https://www.kci.go.kr/kciportal/ci/sereArticleSearch/ciSereArtiView.kci?sereArticleSearchBean.artiId=ART002370577$$DAccess content in National Research Foundation of Korea (NRF)
BookMark eNotkD1PwkAAhi8GExH5BS63ODi0XnvX692IBJUPgx_sTT-upimWhPoDNGExxsRBIhqIbH7EwWggLP6h9vgPFnF63uHJM7zrIBd1IgHApoZUqiG6U6-VK4eqjjSmalwlKmL6CsjrhBoKNxHOZRshQ6GIG2ugGMeBgxAjhmaaJA-Oj07LcFfY58nkDs4fB8nXTzq9nPcH6fM1lNN7Oe7LUQ_KYW_eH0I5miXfE3kzXmgvI5i-v6a3MyjHV_LpDcqHz2TysQFWfbsdi-I_C6C1V2mVD5RGc79aLjWUkBKqMOEz2_dcTH1kc6EZLmaEIM_1heNx39cx1blHXexgIhgn3HE1nXHDFIJlkocLYHuZjbq-FbqB1bGDP551rLBrlU5aVStLEI5p5m4t3TCILwIr8uK2VSvVm4vPdMwNwgnCJsO_z2x3kg
ContentType Journal Article
DBID JDI
ACYCR
DEWEY 690
DOI 10.6106/KJCEM.2018.19.4.082
DatabaseName KoreaScience
Korean Citation Index
DatabaseTitleList

DeliveryMethod fulltext_linktorsrc
Discipline Engineering
DocumentTitleAlternate Application of Artificial Neural Network Model for Environmental Load Estimation of Pre-Stressed Concrete Beam Bridge
EISSN 2465-9703
EndPage 92
ExternalDocumentID oai_kci_go_kr_ARTI_6294936
JAKO201823954940378
GroupedDBID .UV
JDI
ACYCR
ID FETCH-LOGICAL-k646-8ef8afdc36f0a9e15c38440dcfebd9ff23629d6c3b34e8949bc128957ee8dcfd3
ISSN 2005-6095
IngestDate Wed Dec 20 03:39:03 EST 2023
Fri Dec 22 12:04:11 EST 2023
IsDoiOpenAccess true
IsOpenAccess true
IsPeerReviewed false
IsScholarly false
Issue 4
Keywords PSC
Language Korean
LinkModel OpenURL
MergedId FETCHMERGED-LOGICAL-k646-8ef8afdc36f0a9e15c38440dcfebd9ff23629d6c3b34e8949bc128957ee8dcfd3
Notes KISTI1.1003/JNL.JAKO201823954940378
OpenAccessLink http://click.ndsl.kr/servlet/LinkingDetailView?cn=JAKO201823954940378&dbt=JAKO&org_code=O481&site_code=SS1481&service_code=01
PageCount 11
ParticipantIDs nrf_kci_oai_kci_go_kr_ARTI_6294936
kisti_ndsl_JAKO201823954940378
PublicationCentury 2000
PublicationDate 2018-07
PublicationDateYYYYMMDD 2018-07-01
PublicationDate_xml – month: 07
  year: 2018
  text: 2018-07
PublicationDecade 2010
PublicationTitle 한국건설관리학회 논문집, 19(4)
PublicationTitleAlternate Korean journal of construction engineering and management
PublicationYear 2018
Publisher 한국건설관리학회
Publisher_xml – name: 한국건설관리학회
SSID ssib008451774
ssib036279018
ssib044750969
ssib053377154
Score 1.6576616
Snippet Considering that earlier stage of construction project has a great influence on the possibility of lowering of environmental load, it is important to build and...
건설사업 초기단계가 환경부하량의 절감 가능성에 큰 영향을 미친다는 것을 감안한다면, 효과적인 의사결정을 지원할 수 있는 시스템을 초기에 구축하고 활용하는 것이 중요하다. 이에 본 연구에서는 기본적인 설계 요인들을 고려하여 초기 설계단계에서 활용될 수 있는 환경부하량 산정 모델을...
SourceID nrf
kisti
SourceType Open Website
Open Access Repository
StartPage 82
SubjectTerms 건축공학
Title PSC Beam교 환경부하량 추정을 위한 인공신경망 모델 적용 연구
URI http://click.ndsl.kr/servlet/LinkingDetailView?cn=JAKO201823954940378&dbt=JAKO&org_code=O481&site_code=SS1481&service_code=01
https://www.kci.go.kr/kciportal/ci/sereArticleSearch/ciSereArtiView.kci?sereArticleSearchBean.artiId=ART002370577
Volume 19
hasFullText 1
inHoldings 1
isFullTextHit
isPrint
ispartofPNX 한국건설관리학회 논문집, 2018, 19(4), 104, pp.82-92
link http://utb.summon.serialssolutions.com/2.0.0/link/0/eLvHCXMwrV3Na9RAFA9tvXgRRcX6UYI4pyVrspkk845JdkttqR9Yobdlk0xKWdlCbS8eRKEXEcGDxSotFi9-4EGULb34D-2m_4NvXrJpLBWqeAmPeW_evHkvk_zeZDKjaTesjg2RG0eGbCQdg3vSNSAWseGCdCQ4aSeln8Lmb7szD_jsorM4Nv6hsmppfS2qx4-P_a_kX6KKZRhX9ZfsX0S2VIoFSGN88YoRxuuJYnz3PgZHYkhbPgscBmaNtZoMgIGgogYLmqwVsMBVCxoUyyFWwGCaCUDpUPGAK8I3FRsJaDLBiQchUqN6Ya1gBrlyWzWJJSJQVavN-R6K1YjymU_tCVWtVjQjLNKEvNwE8FhgFn0otoIs4HLZ9ojbJMJiAZmMxvmcSjh1EBt0UcOoFhDhMxGSMcJhQUhCIfUhJEMtdZNZgECbV2ZFSCmQUuozkLzyrHMoQg7yyRJAl5qlbcdoKd2DNdBzYXW2xRLlytx8fPyvbh8-5WkrWLXrX_5Czsu46xjgmXblzZIf0VRglPz4wKNvP0TCaiJmbjZszatFi6JuQZ3XzVHV6l7jRzDAb7uNd-Pl9tJKu7vaxpzqVtttAAfbHddONTyPlkLMP2mVz2zBHauSQiAe8hBils90tZ8kZsklZMbsApXQ4YRlz_PNwJT1N4-xHbNGlUotI_jrraYV8LdwVjtTZG26nw_Bc9pYd-W8dg-Hn66G36D_Sj94uzX4_nO49_Rgc2v4_rme7b3OdjeznQ0929442NzWs539wY9-9mJXiX3c0YdfPg1f7uvZ7rPs3Wc9e_Nt0P96QVuYbi2EM0ZxQonRdblrCJmKTprEtpuaHZCWE9uCczOJUxklkKYN9AYkbmxHNpcCvRjFCAfB8aQUKJTYF7WJ3kpPXtJ0lLEkIDxPRAczmFhEgMDeQ70OVzONk9oUeaHdSx49bM_6c3eUkxq2-krPTdsTk9p1dA_F7s8xvHwSoSva6cM7_6o2sba6Lq8h8l6Lpij0vwD8LajG
linkProvider ISSN International Centre
openUrl ctx_ver=Z39.88-2004&ctx_enc=info%3Aofi%2Fenc%3AUTF-8&rfr_id=info%3Asid%2Fsummon.serialssolutions.com&rft_val_fmt=info%3Aofi%2Ffmt%3Akev%3Amtx%3Ajournal&rft.genre=article&rft.atitle=PSC+Beam%EA%B5%90+%ED%99%98%EA%B2%BD%EB%B6%80%ED%95%98%EB%9F%89+%EC%B6%94%EC%A0%95%EC%9D%84+%EC%9C%84%ED%95%9C+%EC%9D%B8%EA%B3%B5%EC%8B%A0%EA%B2%BD%EB%A7%9D+%EB%AA%A8%EB%8D%B8+%EC%A0%81%EC%9A%A9+%EC%97%B0%EA%B5%AC&rft.jtitle=%ED%95%9C%EA%B5%AD%EA%B1%B4%EC%84%A4%EA%B4%80%EB%A6%AC%ED%95%99%ED%9A%8C+%EB%85%BC%EB%AC%B8%EC%A7%91%2C+19%284%29&rft.au=%EA%B9%80%EC%9D%98%EC%99%95&rft.au=%EC%9C%A4%EC%9B%90%EA%B1%B4&rft.au=%EA%B9%80%EA%B2%BD%EC%A3%BC&rft.date=2018-07-01&rft.pub=%ED%95%9C%EA%B5%AD%EA%B1%B4%EC%84%A4%EA%B4%80%EB%A6%AC%ED%95%99%ED%9A%8C&rft.issn=2005-6095&rft.eissn=2465-9703&rft.spage=82&rft.epage=92&rft_id=info:doi/10.6106%2FKJCEM.2018.19.4.082&rft.externalDBID=n%2Fa&rft.externalDocID=oai_kci_go_kr_ARTI_6294936
thumbnail_l http://covers-cdn.summon.serialssolutions.com/index.aspx?isbn=/lc.gif&issn=2005-6095&client=summon
thumbnail_m http://covers-cdn.summon.serialssolutions.com/index.aspx?isbn=/mc.gif&issn=2005-6095&client=summon
thumbnail_s http://covers-cdn.summon.serialssolutions.com/index.aspx?isbn=/sc.gif&issn=2005-6095&client=summon