플랜트 프로젝트 사업기획단계 표준 업무 프로세스 개발 - 사업발굴 및 사업참여 결정을 중심으로

Recently, overseas plant orders of domestic enterprises are steadily increased, and the amount of orders in the first half of 2014 were 93% increased compared to the previous year. In addition, now which is the third quarter of 2015, overseas plant orders are already over 249.8 billion dollars so th...

Full description

Saved in:
Bibliographic Details
Published in한국건설관리학회 논문집, 17(4) Vol. 17; no. 4; pp. 3 - 11
Main Authors 이도윤, 최창훈, 원서경, 조문영, 한충희, 이준복, Lee, Do-yun, Choi, Chang-Hoon, Won, Seo-kyung, Cho, Moon-Young, Han, Choong-Hee, Lee, Junbok
Format Journal Article
LanguageKorean
Published 한국건설관리학회 01.07.2016
Subjects
Online AccessGet full text
ISSN2005-6095
2465-9703
DOI10.6106/KJCEM.2016.17.4.003

Cover

Abstract Recently, overseas plant orders of domestic enterprises are steadily increased, and the amount of orders in the first half of 2014 were 93% increased compared to the previous year. In addition, now which is the third quarter of 2015, overseas plant orders are already over 249.8 billion dollars so the interests of plant industry research has been increased. In the life cycle of the plant project, CM before the construction stage is to complement the uncertainties that are inherent in the early stages of the project, and from the viewpoint of supporting the rational decision-making, the importance of its role is on the rise. Among them, excavating and investing participation plan in the planning stage is an important work that has a large impact force to influence the success and failure of future project. However, the work has become a problem with frequent consultations due to decision-making, continuous modification, and inefficient repetitive tasks. Therefore, it is needed that work process should be changed to effectively accommodate. The purpose of this paper is to derive the major work items for excavating and investing participation plan in the planning stage of the plant project, and establish a standardized work process through the Delphi analysis. The result of this study is expected to be utilized for EPC companies in ensuring the technical competitiveness in planning on overseas markets, and improve the efficiency of work. 최근 국내 기업의 해외 플랜트 수주는 꾸준히 증가하는 추세이며, 2014년 상반기의 수주액은 전년도 대비 93% 이상 크게 증가되었다. 또한, 2015년 3사분기가 지난 현재, 해외 플랜트 수주액은 이미 2,498억 달러를 넘어섰다고 조사된 만큼 플랜트 산업에 대한 관심이 증가되고 있다. 플랜트 프로젝트의 생애주기 중 시공 이전 단계의 건설 사업관리(CM)는 사업 초기 단계에 내재된 불확실성을 보완하고, 합리적인 의사결정을 지원한다는 측면에서 그 역할의 중요성이 대두되고 있다. 그 중에서도 사업 기획 단계의 사업 발굴 및 사업 참여방안 검토 업무는 향후 사업의 성공과 실패를 좌우할 수 있는 큰 영향력을 가진 중요한 업무이지만, 의사결정을 위한 각 분야 간의 빈번한 협의, 그리고 이에 따른 계속된 수정, 변경 등과 비효율적인 반복 작업이 문제가 되고 있다. 따라서 이를 효과적으로 수용할 수 있는 업무 프로세스의 변화가 필요하게 되었고, 본 논문에서는 플랜트 프로젝트 기획 단계의 '사업 발굴 및 사업 참여방안 검토'를 대상으로 주요 업무 항목을 도출하고 전문가 자문을 활용한 델파이 분석을 통해 표준화된 업무 프로세스를 정립하였다. 본 논문의 결과는 우리나라 EPC 기업이 해외시장에서 기획 분야의 기술 경쟁력을 확보하고 업무 효율성을 제고할 수 있는 기반을 마련하는 데에 활용될 수 있을 것으로 기대된다.
AbstractList Recently, overseas plant orders of domestic enterprises are steadily increased, and the amount of orders in the first half of 2014 were 93% increased compared to the previous year. In addition, now which is the third quarter of 2015, overseas plant orders are already over 249.8 billion dollars so the interests of plant industry research has been increased. In the life cycle of the plant project, CM before the construction stage is to complement the uncertainties that are inherent in the early stages of the project, and from the viewpoint of supporting the rational decision-making, the importance of its role is on the rise. Among them, excavating and investing participation plan in the planning stage is an important work that has a large impact force to influence the success and failure of future project. However, the work has become a problem with frequent consultations due to decision-making, continuous modification, and inefficient repetitive tasks. Therefore, it is needed that work process should be changed to effectively accommodate. The purpose of this paper is to derive the major work items for excavating and investing participation plan in the planning stage of the plant project, and establish a standardized work process through the Delphi analysis. The result of this study is expected to be utilized for EPC companies in ensuring the technical competitiveness in planning on overseas markets, and improve the efficiency of work. 최근 국내 기업의 해외 플랜트 수주는 꾸준히 증가하는 추세이며, 2014년 상반기의 수주액은 전년도 대비 93% 이상 크게 증가되었다. 또한, 2015년 3사분기가 지난 현재, 해외 플랜트 수주액은 이미 2,498억 달러를 넘어섰다고 조사된 만큼 플랜트 산업에 대한 관심이 증가되고 있다. 플랜트 프로젝트의 생애주기 중 시공 이전 단계의 건설 사업관리(CM)는 사업 초기 단계에 내재된 불확실성을 보완하고, 합리적인 의사결정을 지원한다는 측면에서 그 역할의 중요성이 대두되고 있다. 그 중에서도 사업 기획 단계의 사업 발굴 및 사업 참여방안 검토 업무는 향후 사업의 성공과 실패를 좌우할 수 있는 큰 영향력을 가진 중요한 업무이지만, 의사결정을 위한 각 분야 간의 빈번한 협의, 그리고 이에 따른 계속된 수정, 변경 등과 비효율적인 반복 작업이 문제가 되고 있다. 따라서 이를 효과적으로 수용할 수 있는 업무 프로세스의 변화가 필요하게 되었고, 본 논문에서는 플랜트 프로젝트 기획 단계의 '사업 발굴 및 사업 참여방안 검토'를 대상으로 주요 업무 항목을 도출하고 전문가 자문을 활용한 델파이 분석을 통해 표준화된 업무 프로세스를 정립하였다. 본 논문의 결과는 우리나라 EPC 기업이 해외시장에서 기획 분야의 기술 경쟁력을 확보하고 업무 효율성을 제고할 수 있는 기반을 마련하는 데에 활용될 수 있을 것으로 기대된다.
최근 국내 기업의 해외 플랜트 수주는 꾸준히 증가하는 추세이며, 2014년 상반기의 수주액은 전년도 대비 93% 이상 크게 증가되었다. 또한, 2015년 3사분기가 지난 현재, 해외 플랜트 수주액은 이미 2,498억 달러를 넘어섰다고 조사된 만큼 플랜트 산업에 대한 관심이 증가되고 있다. 플랜트 프로젝트의 생애주기 중 시공 이전 단계의 건설 사업관리(CM)는 사업 초기 단계에 내재된 불확실성을 보완하고, 합리적인 의사결정을 지원한다는 측면에서 그 역할의 중요성이 대두되고 있다. 그 중에서도 사업 기획 단계의 사업 발굴 및 사업 참여방안 검토 업무는 향후 사업의 성공과 실패를 좌우할 수 있는 큰 영향력을 가진 중요한 업무이지만, 의사결정을 위한 각 분야 간의 빈번한 협의, 그리고 이에 따른 계속된 수정, 변경 등과 비효율적인 반복 작업이 문제가 되고 있다. 따라서 이를 효과적으로 수용할 수 있는 업무 프로세스의 변화가 필요하게 되었고, 본 논문에서는 플랜트 프로젝트 기획 단계의 ‘사업 발굴 및 사업 참여방안 검토’를 대상으로 주요 업무 항목을 도출하고 전문가 자문을 활용한 델파이 분석을 통해 표준화된 업무 프로세스를 정립하였다. 본 논문의 결과는 우리나라 EPC 기업이 해외시장에서 기획 분야의 기술 경쟁력을 확보하고 업무 효율성을 제고할 수 있는 기반을 마련하는 데에 활용될 수 있을 것으로 기대된다. Recently, overseas plant orders of domestic enterprises are steadily increased, and the amount of orders in the first half of 2014 were 93% increased compared to the previous year. In addition, now which is the third quarter of 2015, overseas plant orders are already over 249.8 billion dollars so the interests of plant industry research has been increased. In the life cycle of the plant project, CM before the construction stage is to complement the uncertainties that are inherent in the early stages of the project, and from the viewpoint of supporting the rational decision-making, the importance of its role is on the rise. Among them, excavating and investing participation plan in the planning stage is an important work that has a large impact force to influence the success and failure of future project. However, the work has become a problem with frequent consultations due to decision-making, continuous modification, and inefficient repetitive tasks. Therefore, it is needed that work process should be changed to effectively accommodate. The purpose of this paper is to derive the major work items for excavating and investing participation plan in the planning stage of the plant project, and establish a standardized work process through the Delphi analysis. The result of this study is expected to be utilized for EPC companies in ensuring the technical competitiveness in planning on overseas markets, and improve the efficiency of work. KCI Citation Count: 1
Author 원서경
Won, Seo-kyung
한충희
Lee, Do-yun
Cho, Moon-Young
이도윤
Choi, Chang-Hoon
최창훈
이준복
조문영
Han, Choong-Hee
Lee, Junbok
Author_xml – sequence: 1
  fullname: 이도윤
– sequence: 2
  fullname: 최창훈
– sequence: 3
  fullname: 원서경
– sequence: 4
  fullname: 조문영
– sequence: 5
  fullname: 한충희
– sequence: 6
  fullname: 이준복
– sequence: 7
  fullname: Lee, Do-yun
– sequence: 8
  fullname: Choi, Chang-Hoon
– sequence: 9
  fullname: Won, Seo-kyung
– sequence: 10
  fullname: Cho, Moon-Young
– sequence: 11
  fullname: Han, Choong-Hee
– sequence: 12
  fullname: Lee, Junbok
BackLink https://www.kci.go.kr/kciportal/ci/sereArticleSearch/ciSereArtiView.kci?sereArticleSearchBean.artiId=ART002130188$$DAccess content in National Research Foundation of Korea (NRF)
BookMark eNo1kM1Kw0AUhQepYK19AjfZCG4SJ5lkZrIspWp_pCDdh_xKSEmh8QGk1E1VpFApSCoVunCRRdAKWfhEyeQdTG1dnXMP3z1w7yEo-QPfBuBYhAIWIT5rt-qNK0GCIhZEIsgChGgPlCUZK7xKICoVHkKFx1BVDkA1CFwDQiorIiFyGYzy2WP2FuaThMtn4-w9ZMvFZmCjiM3v0yTOX5-yh4_0a8zl05Ct7rgizqL1Pz1O2GTFpXGYxSHH79YKn36vuSx-3gUsTtg84tLPmC1f2GLMsdWUPUQs_Ck6jsC-o_cDu7rTCuidN3r1S77TvWjWax3ewwjzpkNVQyWmQaBuYSxJqilRmVATm7pt2MW1FkWWIxs6EqGjytRyLNEitmFAh1LDQhVwuq31h47mma420N0_vRlo3lCrXfeaGoYiIrhAT7ao5wa3ruZbQV9r1drdzY8lWUIUqURRMfoFMJCZjA
ContentType Journal Article
DBID JDI
ACYCR
DEWEY 690
DOI 10.6106/KJCEM.2016.17.4.003
DatabaseName KoreaScience
Korean Citation Index
DatabaseTitleList

DeliveryMethod fulltext_linktorsrc
Discipline Engineering
DocumentTitleAlternate The Development of a Standardized Work Process for Planning oPf lant Project - Focus on Excavating and Investing Participation Plan
EISSN 2465-9703
EndPage 11
ExternalDocumentID oai_kci_go_kr_ARTI_601376
JAKO201624238397596
GroupedDBID .UV
JDI
ACYCR
ID FETCH-LOGICAL-k636-cf89b97cb70ad66229c28478c6caebe465d83df4ba310f948dfd1d7ebb0f88bd3
ISSN 2005-6095
IngestDate Wed Dec 20 03:39:03 EST 2023
Fri Dec 22 11:59:21 EST 2023
IsDoiOpenAccess true
IsOpenAccess true
IsPeerReviewed false
IsScholarly false
Issue 4
Language Korean
LinkModel OpenURL
MergedId FETCHMERGED-LOGICAL-k636-cf89b97cb70ad66229c28478c6caebe465d83df4ba310f948dfd1d7ebb0f88bd3
Notes KISTI1.1003/JNL.JAKO201624238397596
G704-001084.2016.17.4.001
OpenAccessLink http://click.ndsl.kr/servlet/LinkingDetailView?cn=JAKO201624238397596&dbt=JAKO&org_code=O481&site_code=SS1481&service_code=01
PageCount 9
ParticipantIDs nrf_kci_oai_kci_go_kr_ARTI_601376
kisti_ndsl_JAKO201624238397596
PublicationCentury 2000
PublicationDate 2016-07
PublicationDateYYYYMMDD 2016-07-01
PublicationDate_xml – month: 07
  year: 2016
  text: 2016-07
PublicationDecade 2010
PublicationTitle 한국건설관리학회 논문집, 17(4)
PublicationTitleAlternate Korean journal of construction engineering and management
PublicationYear 2016
Publisher 한국건설관리학회
Publisher_xml – name: 한국건설관리학회
SSID ssib008451774
ssib036279018
ssib044750969
ssib053377154
Score 1.5950912
Snippet Recently, overseas plant orders of domestic enterprises are steadily increased, and the amount of orders in the first half of 2014 were 93% increased compared...
최근 국내 기업의 해외 플랜트 수주는 꾸준히 증가하는 추세이며, 2014년 상반기의 수주액은 전년도 대비 93% 이상 크게 증가되었다. 또한, 2015년 3사분기가 지난 현재, 해외 플랜트 수주액은 이미 2,498억 달러를 넘어섰다고 조사된 만큼 플랜트 산업에 대한 관심이 증가되고...
SourceID nrf
kisti
SourceType Open Website
Open Access Repository
StartPage 3
SubjectTerms 건축공학
Title 플랜트 프로젝트 사업기획단계 표준 업무 프로세스 개발 - 사업발굴 및 사업참여 결정을 중심으로
URI http://click.ndsl.kr/servlet/LinkingDetailView?cn=JAKO201624238397596&dbt=JAKO&org_code=O481&site_code=SS1481&service_code=01
https://www.kci.go.kr/kciportal/ci/sereArticleSearch/ciSereArtiView.kci?sereArticleSearchBean.artiId=ART002130188
Volume 17
hasFullText 1
inHoldings 1
isFullTextHit
isPrint
ispartofPNX 한국건설관리학회 논문집, 2016, 17(4), 92, pp.3-11
link http://utb.summon.serialssolutions.com/2.0.0/link/0/eLvHCXMwrV3Na9RAFA-1XryIomL9KBGc05Kaz8nMMcmm1JbqpULxsuwkGylbtlDbiweRsl5aRQqVgmylQg8e9rBohT34F-1m_wffzCTZtGyhipcw-96bX95HsvNemLwoymPLoZAWJLrWiGKs2U6SaFRnWHNcF5LlhhGbJn_fefkZXnhhL646q1PTL0u7lra32Fz0ZuJ7Jf8SVaBBXPlbsn8R2QIUCDCG-MIRIgzHS8UYhVVEIRkMUOgjGiIacArxkE8qOc_mPM8QvAB5OqLVslCAiIk8waMuIg4KOQP5upjvIVLl8wlAEMGyAFFiF5BwEr1SAvA5nm9foAH8BHw-8GBqRYDqgufLQUWbqJafi4G8I-EFicxPFA84T54IKF4gT2QKw6QbhBA4Q9gjzACTOJKfIwFGUOhezuKFZc5YG68qBgaolZkIaJzCXSMQsMCUs2ju2kDYANpmpwkyhT2XqwLXPu9NBWDjhzWZyr5wKZkXvhWKenZZxHcyZ3MfiHBTECdnUOCC0TNlMzvAOdWyCJjt62cUowTJL9_kz4kMXOwplnf2__LMeH0STWx5v0KZSkiajR2NurpVWhOtUnIlF9bzyzak8PwJ0tJiEC7z3ZZ4znDneFd7a5yl5DszziUvZ9qkN6O12quNWnOzBsXg0xrm7TTxFeWq6bpiC8fy27BYa4jtGKXSB_I4F1LjYi3ifTChui9SfaiKAER8VLGwWzYx48o_maA6VLu8BFyDpLW1mZSS1pUbyvWs2lQ9-ddxU5lqbtxSdkYHH4ZfO6Pdvjo6aA-_ddLjI_4j3emmh-8H_d7oy8fh3vfBz7Y62u-kJ-9UIA-7p7l0u5_unqiDXmfY66haNg3Gg1-n6rD3KSOkvX562FUHP3rp8ef0qK2mJ_vpXjft_AaM28rKfLgSLGjZp1i0JrawFiWEMupGzNXrMcamSSOe1pIIR3VYBSDoMbHixGZ1qBYTapM4iY3YbTCmJ4Sw2LqjTLc2Wo27imqyyKnrjh7hpG5jlrBG0rDqzGUQJEpsMqPMCrfVWvHr9dqit_Sce5VXfVDKuQ7FM8oj8KeI9YUxv3cJmfvKtfFt8kCZ3trcbjyEAmOLzYor5Q9P_fCr
linkProvider ISSN International Centre
openUrl ctx_ver=Z39.88-2004&ctx_enc=info%3Aofi%2Fenc%3AUTF-8&rfr_id=info%3Asid%2Fsummon.serialssolutions.com&rft_val_fmt=info%3Aofi%2Ffmt%3Akev%3Amtx%3Ajournal&rft.genre=article&rft.atitle=%ED%94%8C%EB%9E%9C%ED%8A%B8+%ED%94%84%EB%A1%9C%EC%A0%9D%ED%8A%B8+%EC%82%AC%EC%97%85%EA%B8%B0%ED%9A%8D%EB%8B%A8%EA%B3%84+%ED%91%9C%EC%A4%80+%EC%97%85%EB%AC%B4+%ED%94%84%EB%A1%9C%EC%84%B8%EC%8A%A4+%EA%B0%9C%EB%B0%9C+-+%EC%82%AC%EC%97%85%EB%B0%9C%EA%B5%B4+%EB%B0%8F+%EC%82%AC%EC%97%85%EC%B0%B8%EC%97%AC+%EA%B2%B0%EC%A0%95%EC%9D%84+%EC%A4%91%EC%8B%AC%EC%9C%BC%EB%A1%9C&rft.jtitle=%ED%95%9C%EA%B5%AD%EA%B1%B4%EC%84%A4%EA%B4%80%EB%A6%AC%ED%95%99%ED%9A%8C+%EB%85%BC%EB%AC%B8%EC%A7%91%2C+17%284%29&rft.au=%EC%9D%B4%EB%8F%84%EC%9C%A4&rft.au=%EC%B5%9C%EC%B0%BD%ED%9B%88&rft.au=%EC%9B%90%EC%84%9C%EA%B2%BD&rft.au=%EC%A1%B0%EB%AC%B8%EC%98%81&rft.date=2016-07-01&rft.pub=%ED%95%9C%EA%B5%AD%EA%B1%B4%EC%84%A4%EA%B4%80%EB%A6%AC%ED%95%99%ED%9A%8C&rft.issn=2005-6095&rft.eissn=2465-9703&rft.spage=3&rft.epage=11&rft_id=info:doi/10.6106%2FKJCEM.2016.17.4.003&rft.externalDBID=n%2Fa&rft.externalDocID=oai_kci_go_kr_ARTI_601376
thumbnail_l http://covers-cdn.summon.serialssolutions.com/index.aspx?isbn=/lc.gif&issn=2005-6095&client=summon
thumbnail_m http://covers-cdn.summon.serialssolutions.com/index.aspx?isbn=/mc.gif&issn=2005-6095&client=summon
thumbnail_s http://covers-cdn.summon.serialssolutions.com/index.aspx?isbn=/sc.gif&issn=2005-6095&client=summon