Probabilistic Unit Commitment with Wind Farms Considerations
This paper proposes a method for unit commitment in restructured power systems with high penetration of wind farms. As wind is an intermittent source of energy and can not be predicted with high accuracy, reliability of wind farms compare to conventional power plants is lower. By increasing penetrat...
Saved in:
Published in | 2007 Large Engineering Systems Conference on Electric Power Engineering pp. 73 - 77 |
---|---|
Main Authors | , |
Format | Conference Proceeding |
Language | English |
Published |
IEEE
01.10.2007
|
Subjects | |
Online Access | Get full text |
ISBN | 9781424415823 1424415829 |
DOI | 10.1109/LESCPE.2007.4437356 |
Cover
Abstract | This paper proposes a method for unit commitment in restructured power systems with high penetration of wind farms. As wind is an intermittent source of energy and can not be predicted with high accuracy, reliability of wind farms compare to conventional power plants is lower. By increasing penetration of wind farms in generation system, reliability of power system will decrease. Therefore, reliability constraint should be added to unit commitment (UC) formulation. On the other hand, wind is a green source of energy; additionally environmental crisis is very important issue in the 21 st century. By adding emission constraint to UC, wind energy will be valued. Both reliability and emission constraints are acing as fuzzy constraints. It means that if the UC solution exceeds these constraints limits, that configuration of UC will be penalized by adding augmented cost to total UC cost. To implement these constraints to UC, simulated annealing (SA) has been used because it converges very well under complex and nonlinear constraints. At the end, if any wind farm considered to be off in UC, a must run constraint will make them on and calculate reliability effect of the recommitted wind farm on generation system and decrease from the capacity of the most expensive thermal units equal to the calculated effect of newly committed wind farm on system reliability. Then wind farms that recommitted will be paid 80 percent of the cheapest committed unit in that period. In this way, wind farms will be supported wisely and free power market conditions will be remain unchanged. |
---|---|
AbstractList | This paper proposes a method for unit commitment in restructured power systems with high penetration of wind farms. As wind is an intermittent source of energy and can not be predicted with high accuracy, reliability of wind farms compare to conventional power plants is lower. By increasing penetration of wind farms in generation system, reliability of power system will decrease. Therefore, reliability constraint should be added to unit commitment (UC) formulation. On the other hand, wind is a green source of energy; additionally environmental crisis is very important issue in the 21 st century. By adding emission constraint to UC, wind energy will be valued. Both reliability and emission constraints are acing as fuzzy constraints. It means that if the UC solution exceeds these constraints limits, that configuration of UC will be penalized by adding augmented cost to total UC cost. To implement these constraints to UC, simulated annealing (SA) has been used because it converges very well under complex and nonlinear constraints. At the end, if any wind farm considered to be off in UC, a must run constraint will make them on and calculate reliability effect of the recommitted wind farm on generation system and decrease from the capacity of the most expensive thermal units equal to the calculated effect of newly committed wind farm on system reliability. Then wind farms that recommitted will be paid 80 percent of the cheapest committed unit in that period. In this way, wind farms will be supported wisely and free power market conditions will be remain unchanged. |
Author | Hosseini, S.H. Abbasi, E. |
Author_xml | – sequence: 1 givenname: S.H. surname: Hosseini fullname: Hosseini, S.H. organization: Sharif Univ. of Technol., Tehran – sequence: 2 givenname: E. surname: Abbasi fullname: Abbasi, E. organization: Sharif Univ. of Technol., Tehran |
BookMark | eNpVj89KxDAYxCOuoK59gr30BVq__GnSgBcpXRUKLuyKxyVNE_xkm0oTEN_egnvxNDO_gYG5JaswBUfIhkJJKej7rt03u7ZkAKoUgiteyQuSaVVTwYSgVc3h8l9m_JpkMX4CAFVyIfyGPOzmqTc9njAmtPlbwJQ30zhiGl1I-Temj_wdw5BvzTzGpQoRBzebhIu7I1fenKLLzromh217aJ6L7vXppXnsCtSQCu2kG4zspWbM-MoAc5Ra5g1lzNXUaFZ7LUB6a2urvbJKVLpSQnJlPO8lX5PN3yw6545fM45m_jmeL_NfeWVL5g |
ContentType | Conference Proceeding |
DBID | 6IE 6IL CBEJK RIE RIL |
DOI | 10.1109/LESCPE.2007.4437356 |
DatabaseName | IEEE Electronic Library (IEL) Conference Proceedings IEEE Proceedings Order Plan All Online (POP All Online) 1998-present by volume IEEE Xplore All Conference Proceedings IEEE Electronic Library (IEL) IEEE Proceedings Order Plans (POP All) 1998-Present |
DatabaseTitleList | |
Database_xml | – sequence: 1 dbid: RIE name: IEEE Electronic Library (IEL) url: https://proxy.k.utb.cz/login?url=https://ieeexplore.ieee.org/ sourceTypes: Publisher |
DeliveryMethod | fulltext_linktorsrc |
EISBN | 9781424415830 1424415837 |
EndPage | 77 |
ExternalDocumentID | 4437356 |
Genre | orig-research |
GroupedDBID | 6IE 6IF 6IK 6IL 6IN AAJGR AARBI AAWTH ALMA_UNASSIGNED_HOLDINGS BEFXN BFFAM BGNUA BKEBE BPEOZ CBEJK IERZE OCL RIE RIL |
ID | FETCH-LOGICAL-i90t-9e6eda6b6922af5a02e11c2fa122e81a928f9406fcc8c9f7c7459574637af3b63 |
IEDL.DBID | RIE |
ISBN | 9781424415823 1424415829 |
IngestDate | Wed Aug 27 01:39:45 EDT 2025 |
IsPeerReviewed | false |
IsScholarly | false |
Language | English |
LinkModel | DirectLink |
MergedId | FETCHMERGED-LOGICAL-i90t-9e6eda6b6922af5a02e11c2fa122e81a928f9406fcc8c9f7c7459574637af3b63 |
PageCount | 5 |
ParticipantIDs | ieee_primary_4437356 |
PublicationCentury | 2000 |
PublicationDate | 2007-Oct. |
PublicationDateYYYYMMDD | 2007-10-01 |
PublicationDate_xml | – month: 10 year: 2007 text: 2007-Oct. |
PublicationDecade | 2000 |
PublicationTitle | 2007 Large Engineering Systems Conference on Electric Power Engineering |
PublicationTitleAbbrev | LESCPE |
PublicationYear | 2007 |
Publisher | IEEE |
Publisher_xml | – name: IEEE |
SSID | ssj0001764153 |
Score | 1.4320693 |
Snippet | This paper proposes a method for unit commitment in restructured power systems with high penetration of wind farms. As wind is an intermittent source of energy... |
SourceID | ieee |
SourceType | Publisher |
StartPage | 73 |
SubjectTerms | Accuracy Costs Power generation Power markets Power system reliability Reliability and emission constraint restructured power market Simulated annealing unit commitment Wind energy Wind energy generation Wind farm Wind farms Wind forecasting |
Title | Probabilistic Unit Commitment with Wind Farms Considerations |
URI | https://ieeexplore.ieee.org/document/4437356 |
hasFullText | 1 |
inHoldings | 1 |
isFullTextHit | |
isPrint | |
link | http://utb.summon.serialssolutions.com/2.0.0/link/0/eLvHCXMwjV1NawIxEB3UU09t0dJvcuixq26-dgO9iSKlFqGWepN8gpRq0fXSX98ku6u09NDbbg7LhIS8ydt5bwDuqKGcSH87yYQ2CXWYJDlzMlG5dcwJYlTsEjF55uNX-jhn8wbc77Uw1tpYfGa74TH-yzdrvQtUWY8GHx7Gm9D026zUah34lIx7LCK1ditlORa1pVP1TirXobQvek_Dl8F0WFoYVp_90V8lwsvoGCZ1YGVVyXt3V6iu_vrl2fjfyE-gcxDyoekeok6hYVdtePAjKhrrBo9mFLJOFHQiy1hwjgIzi978VR2N5OZji-qWniW114HZaDgbjJOqiUKyFP0iEZZbI7niAmPpmOxjm6YaO5libPNUCpw74UHdaZ1r4TKdUSZY5hcwk44oTs6gtVqv7Dkgn2wp408IrayhzmcS1FImlZOOc2UovoB2mPjis7TJWFRzvvx7-AqOIk0a6-KuoVVsdvbG43uhbuPCfgMdkKHO |
linkProvider | IEEE |
linkToHtml | http://utb.summon.serialssolutions.com/2.0.0/link/0/eLvHCXMwjV1NTwIxFHxBPOhJDRi_7cGjC2y37W4TbwSCCoREjNxIPxNjBIPLxV9v292FaDx4a3to2jTpvE7fzAO4IZqwRLjXScqVjojFSZRRKyKZGUstT7QMVSJGYzZ4Jg8zOqvB7UYLY4wJyWem5ZvhL18v1dpTZW3ifXgo24Fdh_uEFmqtLaOSModGSaXeimmGeWXqVPaT0nco7vD2sPfUnfQKE8Ny4h8VVgLA9A9gVC2tyCt5a61z2VJfv1wb_7v2Q2hupXxosgGpI6iZRQPu3IgM1rrepRn5uBN5pchrSDlHnptFL-6xjvpi9f6JqqKeBbnXhGm_N-0OorKMQvTKO3nEDTNaMMk4xsJS0cEmjhW2IsbYZLHgOLPcwbpVKlPcpiollNPUHWEqbCJZcgz1xXJhTgC5cEtqd0coaTSxLpYghlAhrbCMSU3wKTT8xucfhVHGvNzz2d_D17A3mI6G8-H9-PEc9gNpGrLkLqCer9bm0qF9Lq_CIX8DzPKlGw |
openUrl | ctx_ver=Z39.88-2004&ctx_enc=info%3Aofi%2Fenc%3AUTF-8&rfr_id=info%3Asid%2Fsummon.serialssolutions.com&rft_val_fmt=info%3Aofi%2Ffmt%3Akev%3Amtx%3Abook&rft.genre=proceeding&rft.title=2007+Large+Engineering+Systems+Conference+on+Electric+Power+Engineering&rft.atitle=Probabilistic+Unit+Commitment+with+Wind+Farms+Considerations&rft.au=Hosseini%2C+S.H.&rft.au=Abbasi%2C+E.&rft.date=2007-10-01&rft.pub=IEEE&rft.isbn=9781424415823&rft.spage=73&rft.epage=77&rft_id=info:doi/10.1109%2FLESCPE.2007.4437356&rft.externalDocID=4437356 |
thumbnail_l | http://covers-cdn.summon.serialssolutions.com/index.aspx?isbn=9781424415823/lc.gif&client=summon&freeimage=true |
thumbnail_m | http://covers-cdn.summon.serialssolutions.com/index.aspx?isbn=9781424415823/mc.gif&client=summon&freeimage=true |
thumbnail_s | http://covers-cdn.summon.serialssolutions.com/index.aspx?isbn=9781424415823/sc.gif&client=summon&freeimage=true |