A Analysis of Time and Cost Optimization in Building Contruction Using Time Cost Trade Off Method

The construction of both buildings and roads has several success factors. One of the influencing factors is the timely completion of the project and the costs incurred in accordance with the Budget Plan (RAB) that was prepared during planning. Many projects experience problems with delays in complet...

Full description

Saved in:
Bibliographic Details
Published inJournal of Civil Engineering and Planning Vol. 4; no. 2; pp. 199 - 210
Main Author Nabila, Firyaal
Format Journal Article
LanguageEnglish
Published 04.12.2023
Online AccessGet full text
ISSN2746-6299
2746-6299
DOI10.37253/jcep.v4i2.8662

Cover

Abstract The construction of both buildings and roads has several success factors. One of the influencing factors is the timely completion of the project and the costs incurred in accordance with the Budget Plan (RAB) that was prepared during planning. Many projects experience problems with delays in completion time, if the project is completed late then they will be subject to fines. So it is necessary to carry out appropriate calculations so that construction implementation can proceed based on the initial planning. For this reason, this research was carried out by analyzing time and cost optimization using one method, namely Time Cost Trade Off, by calculating the fastest implementation time and the minimum costs incurred. The results obtained from this research are that, by increasing the working hours by 1 hour, the project duration is reduced to 106 days and the cost decreases to Rp. 2,722,750,086, 05. Meanwhile, if workers are added equivalent to an additional 1 hour of working hours, the project duration is reduced to 106 days and costs also decrease to Rp. 2,720,684,806.69. For additional working hours of 3 hours, the project duration becomes 59 days and the cost becomes Rp. 2,552,212,214, 71. Meanwhile, if you add workers equivalent to adding 3 hours of work, the project duration will be 59 days, but the cost will decrease to Rp. 2,545,208,046.33. It can be concluded from this research that by speeding up the project completion time, total costs will decrease and it is most efficient to increase labor rather than increase working hours (overtime). This is done so that the project does not experience delays and incur fines.
AbstractList The construction of both buildings and roads has several success factors. One of the influencing factors is the timely completion of the project and the costs incurred in accordance with the Budget Plan (RAB) that was prepared during planning. Many projects experience problems with delays in completion time, if the project is completed late then they will be subject to fines. So it is necessary to carry out appropriate calculations so that construction implementation can proceed based on the initial planning. For this reason, this research was carried out by analyzing time and cost optimization using one method, namely Time Cost Trade Off, by calculating the fastest implementation time and the minimum costs incurred. The results obtained from this research are that, by increasing the working hours by 1 hour, the project duration is reduced to 106 days and the cost decreases to Rp. 2,722,750,086, 05. Meanwhile, if workers are added equivalent to an additional 1 hour of working hours, the project duration is reduced to 106 days and costs also decrease to Rp. 2,720,684,806.69. For additional working hours of 3 hours, the project duration becomes 59 days and the cost becomes Rp. 2,552,212,214, 71. Meanwhile, if you add workers equivalent to adding 3 hours of work, the project duration will be 59 days, but the cost will decrease to Rp. 2,545,208,046.33. It can be concluded from this research that by speeding up the project completion time, total costs will decrease and it is most efficient to increase labor rather than increase working hours (overtime). This is done so that the project does not experience delays and incur fines.
Author Nabila, Firyaal
Author_xml – sequence: 1
  givenname: Firyaal
  surname: Nabila
  fullname: Nabila, Firyaal
BookMark eNpNkD1PwzAYhC1UJErpzOo_kNR-7djOGCq-pKIuYbYcxwajxqniFKn8ekhgYLrTne6G5xotYh8dQreU5ExCwTYf1h3zTx4gV0LABVqC5CITUJaLf_4KrVMKDeFcciZZuUSmwlU0h3MKCfce16Fz2MQWb_s04v1xDF34MmPoIw4R353CoQ3x7aeN43Cyc_6apmQezqN6MK3De-_xixvf-_YGXXpzSG79pytUP9zX26dst3983la7zCoKGbiiBVkqxxsGTSGkZKLwHKgiQMAzSxlVVjDquAMiG1NYz0CAVSWxihO2QpvfWzv0KQ3O6-MQOjOcNSV6ZqQnRnpipCdG7BvbHFwD
ContentType Journal Article
CorporateAuthor Universitas Mangku Wiyata
CorporateAuthor_xml – name: Universitas Mangku Wiyata
DBID AAYXX
CITATION
DOI 10.37253/jcep.v4i2.8662
DatabaseName CrossRef
DatabaseTitle CrossRef
DatabaseTitleList CrossRef
DeliveryMethod fulltext_linktorsrc
EISSN 2746-6299
EndPage 210
ExternalDocumentID 10_37253_jcep_v4i2_8662
GroupedDBID AAYXX
CITATION
M~E
ID FETCH-LOGICAL-c812-2e5d2798e4b32b5677365f42180202f3c1318c631e4e207ba5cf3262c890c8403
ISSN 2746-6299
IngestDate Tue Jul 01 02:05:50 EDT 2025
IsDoiOpenAccess false
IsOpenAccess true
IsPeerReviewed false
IsScholarly false
Issue 2
Language English
LinkModel OpenURL
MergedId FETCHMERGED-LOGICAL-c812-2e5d2798e4b32b5677365f42180202f3c1318c631e4e207ba5cf3262c890c8403
OpenAccessLink https://journal.uib.ac.id/index.php/jce/article/download/8662/3635
PageCount 12
ParticipantIDs crossref_primary_10_37253_jcep_v4i2_8662
ProviderPackageCode CITATION
AAYXX
PublicationCentury 2000
PublicationDate 2023-12-4
PublicationDateYYYYMMDD 2023-12-04
PublicationDate_xml – month: 12
  year: 2023
  text: 2023-12-4
  day: 04
PublicationDecade 2020
PublicationTitle Journal of Civil Engineering and Planning
PublicationYear 2023
SSID ssib044743739
Score 1.8552535
Snippet The construction of both buildings and roads has several success factors. One of the influencing factors is the timely completion of the project and the costs...
SourceID crossref
SourceType Index Database
StartPage 199
Title A Analysis of Time and Cost Optimization in Building Contruction Using Time Cost Trade Off Method
Volume 4
hasFullText 1
inHoldings 1
isFullTextHit
isPrint
link http://utb.summon.serialssolutions.com/2.0.0/link/0/eLvHCXMwnV3PS8MwFA46L15EUfE3OXgQSmebpGl7nGNjCHOXCbuVJkuhotvQMdCDf7svadp1ssH0UkroezT5wst7Sd73ELplQlEm4sCVxFMuSyPqCsl8lwolOMQTsMjpfOf-E-89s8dRMFpeYjfZJXPRlF9r80r-gyq0Aa46S_YPyFZKoQHeAV94AsLw3Arj1gqniM7mMGcB7enH3BmALXizSZZ6U-PB1r_WOX4lZ6xTXBgwgkYIVq6xcgZZ5vRNZekNrms7X-SvdSrDIufA1j-q9pc1ea_xTbv5-2dqO2N3GAg1tzXY0hBB4MpdTopCRk21ps1aUlabMKRmFf1S1NpIb53tpiExFThepJo1FywnzYhbQ73Ckv1r9aruFEI0Y1QkWkGiFSRawS7aI2FoTvD7353S1DAWak4nHRxVPSmIn4yO-9WfqPksNedjeIgO7NDjVjEFjtCOmhyjtIVL-PE0wxpFDDhgjSSuw4_zCS7hxzX4sYG_EDRCBn4M8OMC_hM07HaG7Z5rK2a4Ehw1l6hgTMI4UkxQIgIehpQHGSOa5c8jGZU-WHDJqa-YIl4o0kBm4L4TGcWehEifnqLGZDpRZwizNOORpEqTITE_VcJTaRwHVFLuxUyKc3RXDkkyK3hRkg0IXGz_6SXaX07AK9SA8VDX4PTNxY2B7wc1AFh8
linkProvider ISSN International Centre
openUrl ctx_ver=Z39.88-2004&ctx_enc=info%3Aofi%2Fenc%3AUTF-8&rfr_id=info%3Asid%2Fsummon.serialssolutions.com&rft_val_fmt=info%3Aofi%2Ffmt%3Akev%3Amtx%3Ajournal&rft.genre=article&rft.atitle=A+Analysis+of+Time+and+Cost+Optimization+in+Building+Contruction+Using+Time+Cost+Trade+Off+Method&rft.jtitle=Journal+of+Civil+Engineering+and+Planning&rft.au=Nabila%2C+Firyaal&rft.date=2023-12-04&rft.issn=2746-6299&rft.eissn=2746-6299&rft.volume=4&rft.issue=2&rft.spage=199&rft.epage=210&rft_id=info:doi/10.37253%2Fjcep.v4i2.8662&rft.externalDBID=n%2Fa&rft.externalDocID=10_37253_jcep_v4i2_8662
thumbnail_l http://covers-cdn.summon.serialssolutions.com/index.aspx?isbn=/lc.gif&issn=2746-6299&client=summon
thumbnail_m http://covers-cdn.summon.serialssolutions.com/index.aspx?isbn=/mc.gif&issn=2746-6299&client=summon
thumbnail_s http://covers-cdn.summon.serialssolutions.com/index.aspx?isbn=/sc.gif&issn=2746-6299&client=summon