The two-machine flowshop total completion time problem: Improved lower bounds and a branch-and-bound algorithm
This paper presents a branch-and-bound algorithm for the two-machine flowshop scheduling problem with the objective of minimizing the sum of completion times. The main feature of the branch-and-bound algorithm is a new lower bounding scheme that is based on a network formulation of the problem. With...
Saved in:
Published in | European journal of operational research Vol. 159; no. 2; pp. 420 - 429 |
---|---|
Main Authors | , |
Format | Journal Article |
Language | English |
Published |
Amsterdam
Elsevier B.V
01.12.2004
Elsevier Elsevier Sequoia S.A |
Series | European Journal of Operational Research |
Subjects | |
Online Access | Get full text |
Cover
Loading…
Be the first to leave a comment!