Railway timetable rescheduling with flexible stopping and flexible short-turning during disruptions

•A new timetable rescheduling model is proposed, which includes flexible stopping and flexible short-turning as well as retiming, reordering, and cancelling trains.•The model deals with all phases of a disruption.•Adjusted train running times due to saved (extra) decelerations and accelerations are...

Full description

Saved in:
Bibliographic Details
Published inTransportation research. Part B: methodological Vol. 123; pp. 149 - 181
Main Authors Zhu, Yongqiu, Goverde, Rob M.P.
Format Journal Article
LanguageEnglish
Published Oxford Elsevier Ltd 01.05.2019
Elsevier Science Ltd
Subjects
Online AccessGet full text

Cover

Loading…
Abstract •A new timetable rescheduling model is proposed, which includes flexible stopping and flexible short-turning as well as retiming, reordering, and cancelling trains.•The model deals with all phases of a disruption.•Adjusted train running times due to saved (extra) decelerations and accelerations are explicitly considered when skipping (adding) stops.•Station capacity is considered by ensuring that each train corresponding to passenger boarding/alighting stops at a platform track while the minimum headway times are taken into account.•Rolling stock circulations at the short-turning and terminal stations of trains are included.•Dispatching decisions are optimized with the objective of minimizing passenger delays. Railway operations are vulnerable to unexpected disruptions that should be handled in an efficient and passenger-friendly way. To this end, we propose a timetable rescheduling model where flexible stopping (i.e. skipping stops and adding stops) and flexible short-turning (i.e. full choice of short-turn stations) are innovatively integrated with three other dispatching measures: retiming, reordering, and cancelling. The Mixed Integer Linear Programming model also ensures that each train serving a station is ensured with a platform track. To consider the rescheduling impact on passengers, the weight of each decision is estimated individually according to the time-dependent passenger demand. The objective is minimizing passenger delays. A case study is carried out for hundreds of disruption scenarios on a subnetwork of the Dutch railways. It is found that (1) applying a mix of flexible stopping and flexible short-turning results in less passenger delays; (2) shortening the recovery duration mitigates the post-disruption consequence by less delay propagation but is at the expense of more cancelled train services during the disruption; and (3) the optimal rescheduling solution is sensitive to the disruption duration, but some steady behaviour is observed when the disruption duration increases by the timetable cycle time.
AbstractList Railway operations are vulnerable to unexpected disruptions that should be handled in an efficient and passenger-friendly way. To this end, we propose a timetable rescheduling model where flexible stopping (i.e. skipping stops and adding stops) and flexible short-turning (i.e. full choice of short-turn stations) are innovatively integrated with three other dispatching measures: retiming, reordering, and cancelling. The Mixed Integer Linear Programming model also ensures that each train serving a station is ensured with a platform track. To consider the rescheduling impact on passengers, the weight of each decision is estimated individually according to the time-dependent passenger demand. The objective is minimizing passenger delays. A case study is carried out for hundreds of disruption scenarios on a subnetwork of the Dutch railways. It is found that (1) applying a mix of flexible stopping and flexible short-turning results in less passenger delays; (2) shortening the recovery duration mitigates the post-disruption consequence by less delay propagation but is at the expense of more cancelled train services during the disruption; and (3) the optimal rescheduling solution is sensitive to the disruption duration, but some steady behaviour is observed when the disruption duration increases by the timetable cycle time.
•A new timetable rescheduling model is proposed, which includes flexible stopping and flexible short-turning as well as retiming, reordering, and cancelling trains.•The model deals with all phases of a disruption.•Adjusted train running times due to saved (extra) decelerations and accelerations are explicitly considered when skipping (adding) stops.•Station capacity is considered by ensuring that each train corresponding to passenger boarding/alighting stops at a platform track while the minimum headway times are taken into account.•Rolling stock circulations at the short-turning and terminal stations of trains are included.•Dispatching decisions are optimized with the objective of minimizing passenger delays. Railway operations are vulnerable to unexpected disruptions that should be handled in an efficient and passenger-friendly way. To this end, we propose a timetable rescheduling model where flexible stopping (i.e. skipping stops and adding stops) and flexible short-turning (i.e. full choice of short-turn stations) are innovatively integrated with three other dispatching measures: retiming, reordering, and cancelling. The Mixed Integer Linear Programming model also ensures that each train serving a station is ensured with a platform track. To consider the rescheduling impact on passengers, the weight of each decision is estimated individually according to the time-dependent passenger demand. The objective is minimizing passenger delays. A case study is carried out for hundreds of disruption scenarios on a subnetwork of the Dutch railways. It is found that (1) applying a mix of flexible stopping and flexible short-turning results in less passenger delays; (2) shortening the recovery duration mitigates the post-disruption consequence by less delay propagation but is at the expense of more cancelled train services during the disruption; and (3) the optimal rescheduling solution is sensitive to the disruption duration, but some steady behaviour is observed when the disruption duration increases by the timetable cycle time.
Author Goverde, Rob M.P.
Zhu, Yongqiu
Author_xml – sequence: 1
  givenname: Yongqiu
  surname: Zhu
  fullname: Zhu, Yongqiu
  email: y.zhu-5@tudelft.nl
– sequence: 2
  givenname: Rob M.P.
  orcidid: 0000-0001-8840-4488
  surname: Goverde
  fullname: Goverde, Rob M.P.
  email: r.m.p.goverde@tudelft.nl
BookMark eNp9kE1LxDAQhoOs4O7qD_BW8Nw6SZt-4EkWv2BBED2HNJ26Kd22Jqnr_ntT14N42NOQeedJJs-CzLq-Q0IuKUQUaHrdRM6UEQNaRMAioPyEzGmeFSGL02xG5j6gIUspPyMLaxsAiBOgc6JepG53ch84vUUnyxYDg1ZtsBpb3b0HO-02Qd3il54i6_phmNqyq_50N71xoRtNN0XVaH6KtmYcnO47e05Oa9lavPitS_J2f_e6egzXzw9Pq9t1qBJWuFBBjDwHlvOsyNIy5ylPlT_IBGUpKVIqqxpYXTMoOEsqnhR5nLGY5Syty4THS3J1uHcw_ceI1omm90v5JwVjLE0SCpD5qewwpUxvrcFaKO3ktKgz3oWgICajohHeqJiMCmDCG_Uk_UcORm-l2R9lbg4M-o9_ajTCKo2dwkobVE5UvT5CfwOjvZGf
CitedBy_id crossref_primary_10_1080_23249935_2023_2220423
crossref_primary_10_1016_j_ins_2023_03_003
crossref_primary_10_1016_j_trc_2020_102889
crossref_primary_10_1177_03611981221115079
crossref_primary_10_3390_su151713040
crossref_primary_10_1360_SSI_2021_0332
crossref_primary_10_3390_app131910695
crossref_primary_10_1016_j_tust_2024_106186
crossref_primary_10_1109_TITS_2022_3228340
crossref_primary_10_1016_j_aej_2021_01_027
crossref_primary_10_1016_j_tre_2023_103339
crossref_primary_10_2139_ssrn_4158253
crossref_primary_10_1109_ACCESS_2020_3022667
crossref_primary_10_1155_2024_9961840
crossref_primary_10_1109_TITS_2024_3394535
crossref_primary_10_1155_2022_2917240
crossref_primary_10_1016_j_ejor_2021_03_014
crossref_primary_10_1016_j_tre_2024_103900
crossref_primary_10_1080_23248378_2024_2306964
crossref_primary_10_1016_j_trb_2024_103094
crossref_primary_10_1155_2023_3897353
crossref_primary_10_1155_2020_8974315
crossref_primary_10_3390_app14125006
crossref_primary_10_1016_j_trc_2025_105076
crossref_primary_10_1177_03611981221104810
crossref_primary_10_1016_j_trb_2024_102885
crossref_primary_10_1177_03611981241252143
crossref_primary_10_1016_j_ejor_2021_11_019
crossref_primary_10_3390_app13063729
crossref_primary_10_1080_01441647_2020_1728419
crossref_primary_10_1109_TITS_2020_3041151
crossref_primary_10_1016_j_trb_2021_06_001
crossref_primary_10_1109_TITS_2024_3386728
crossref_primary_10_1016_j_tranpol_2022_03_006
crossref_primary_10_1016_j_trc_2021_103368
crossref_primary_10_1051_e3sconf_202340206016
crossref_primary_10_1049_itr2_12001
crossref_primary_10_1016_j_aej_2025_03_003
crossref_primary_10_1016_j_cor_2022_105859
crossref_primary_10_1109_TITS_2023_3236004
crossref_primary_10_1177_03611981211052960
crossref_primary_10_1177_1748006X19889149
crossref_primary_10_1016_j_trc_2021_103080
crossref_primary_10_1080_23248378_2024_2329717
crossref_primary_10_1016_j_cie_2024_109980
crossref_primary_10_3390_app12041919
crossref_primary_10_1016_j_trb_2024_103067
crossref_primary_10_3390_machines11060580
crossref_primary_10_1016_j_cie_2023_109742
crossref_primary_10_1007_s12469_021_00261_5
crossref_primary_10_1080_21680566_2023_2203847
crossref_primary_10_1177_03611981241242083
crossref_primary_10_1016_j_trb_2021_08_003
crossref_primary_10_1109_JRFID_2024_3379225
crossref_primary_10_1080_23249935_2021_1877369
crossref_primary_10_3390_app14146273
crossref_primary_10_1016_j_cor_2023_106479
crossref_primary_10_1016_j_trb_2023_02_015
crossref_primary_10_1007_s12469_023_00344_5
crossref_primary_10_1016_j_ress_2022_108538
crossref_primary_10_1016_j_tre_2024_103605
crossref_primary_10_1080_21680566_2024_2336041
crossref_primary_10_1177_03611981241258747
crossref_primary_10_1016_j_trc_2022_103994
crossref_primary_10_1016_j_omega_2024_103040
crossref_primary_10_1016_j_trb_2020_09_001
crossref_primary_10_1016_j_trb_2023_102786
crossref_primary_10_1016_j_trc_2024_104681
crossref_primary_10_1016_j_ejor_2020_03_034
crossref_primary_10_1109_TCSS_2024_3379214
crossref_primary_10_47072_demiryolu_1203693
crossref_primary_10_1080_21680566_2020_1854896
crossref_primary_10_1080_0305215X_2023_2213640
crossref_primary_10_1016_j_ijtst_2021_02_002
crossref_primary_10_1371_journal_pone_0246077
crossref_primary_10_1016_j_omega_2023_102968
crossref_primary_10_1007_s00500_021_05708_2
crossref_primary_10_1080_21680566_2021_1932638
crossref_primary_10_3390_su151914511
crossref_primary_10_1016_j_asoc_2023_110590
crossref_primary_10_1016_j_trd_2021_102975
crossref_primary_10_1016_j_trc_2020_102959
crossref_primary_10_1109_TITS_2021_3093570
crossref_primary_10_1186_s12544_023_00587_0
crossref_primary_10_1016_j_jrtpm_2022_100318
crossref_primary_10_1016_j_trb_2020_11_006
crossref_primary_10_1080_01605682_2020_1806745
crossref_primary_10_1016_j_tre_2021_102492
crossref_primary_10_1007_s42524_023_0291_z
crossref_primary_10_1016_j_ejor_2023_07_023
crossref_primary_10_1016_j_jrtpm_2020_100196
crossref_primary_10_3390_app12094465
crossref_primary_10_1016_j_cie_2025_111018
crossref_primary_10_12720_jait_15_4_458_466
crossref_primary_10_1016_j_trc_2023_104150
crossref_primary_10_1287_trsc_2021_1107
Cites_doi 10.1016/j.cie.2012.08.004
10.1016/j.trb.2015.04.001
10.1287/opre.2014.1327
10.1016/j.tre.2016.07.015
10.1016/j.trc.2017.04.012
10.1016/j.trc.2018.02.006
10.1016/j.trb.2011.05.001
10.1016/j.trb.2016.08.011
10.1016/j.ejor.2013.12.020
10.1016/j.tre.2013.01.013
10.1016/j.trb.2009.05.004
10.1007/s12469-017-0157-z
10.1016/j.trc.2017.03.012
10.1016/j.trb.2017.10.002
10.1016/j.trb.2013.10.013
10.1016/j.trb.2016.12.019
10.1016/j.trc.2017.02.001
10.1287/trsc.1080.0247
10.1016/j.trb.2018.12.008
10.1016/j.trb.2014.01.009
10.1016/j.trc.2016.04.018
10.1287/trsc.2015.0618
10.1016/j.trb.2014.05.005
ContentType Journal Article
Copyright 2019 Elsevier Ltd
Copyright Elsevier Science Ltd. May 2019
Copyright_xml – notice: 2019 Elsevier Ltd
– notice: Copyright Elsevier Science Ltd. May 2019
DBID AAYXX
CITATION
7ST
8FD
C1K
FR3
KR7
SOI
DOI 10.1016/j.trb.2019.02.015
DatabaseName CrossRef
Environment Abstracts
Technology Research Database
Environmental Sciences and Pollution Management
Engineering Research Database
Civil Engineering Abstracts
Environment Abstracts
DatabaseTitle CrossRef
Civil Engineering Abstracts
Engineering Research Database
Technology Research Database
Environment Abstracts
Environmental Sciences and Pollution Management
DatabaseTitleList Civil Engineering Abstracts

DeliveryMethod fulltext_linktorsrc
Discipline Economics
Engineering
EISSN 1879-2367
EndPage 181
ExternalDocumentID 10_1016_j_trb_2019_02_015
S0191261518303801
GroupedDBID --K
--M
-~X
.DC
.~1
0R~
123
1B1
1RT
1~.
1~5
29Q
4.4
457
4G.
5VS
7-5
71M
8P~
9JO
AAAKF
AAAKG
AACTN
AAEDT
AAEDW
AAFJI
AAIAV
AAIKJ
AAKOC
AALRI
AAOAW
AAQFI
AAQXK
AARIN
AAXUO
ABDEX
ABDMP
ABFNM
ABLJU
ABMAC
ABMMH
ABPPZ
ABUCO
ABXDB
ABYKQ
ACDAQ
ACGFS
ACNCT
ACRLP
ADBBV
ADEZE
ADMUD
AEBSH
AEKER
AFKWA
AFTJW
AGHFR
AGUBO
AGYEJ
AHHHB
AHRSL
AIEXJ
AIKHN
AITUG
AJBFU
AJOXV
AKYCK
ALMA_UNASSIGNED_HOLDINGS
AMFUW
AMRAJ
AOMHK
APLSM
ASPBG
AVARZ
AVWKF
AXJTR
AZFZN
BKOJK
BLXMC
CS3
EBS
EFJIC
EFLBG
EJD
EO8
EO9
EP2
EP3
FDB
FEDTE
FGOYB
FIRID
FNPLU
FYGXN
G-2
G-Q
GBLVA
HAMUX
HMY
HVGLF
HZ~
H~9
IHE
J1W
KOM
LY1
LY7
M3Y
M41
MO0
MS~
N9A
O-L
O9-
OAUVE
OHT
OZT
P-8
P-9
P2P
PC.
PRBVW
Q38
R2-
RIG
ROL
RPZ
SDF
SDG
SDP
SDS
SES
SET
SEW
SPCBC
SSB
SSD
SSO
SSS
SSZ
T5K
WUQ
XPP
~G-
AATTM
AAXKI
AAYWO
AAYXX
ABWVN
ACRPL
ADNMO
AEIPS
AFJKZ
AFXIZ
AGCQF
AGQPQ
AGRNS
AIIUN
ANKPU
APXCP
BNPGV
CITATION
SSH
7ST
8FD
C1K
EFKBS
FR3
KR7
SOI
ID FETCH-LOGICAL-c429t-c03e5802857976b85656c857a4eaba1e11adf02ff209524d549837232826fb453
IEDL.DBID .~1
ISSN 0191-2615
IngestDate Wed Aug 13 11:15:07 EDT 2025
Tue Jul 01 03:50:13 EDT 2025
Thu Apr 24 23:09:56 EDT 2025
Fri Feb 23 02:33:21 EST 2024
IsPeerReviewed true
IsScholarly true
Keywords Flexible stopping
Disruption management
Timetable rescheduling
Railways
Flexible short-turning
Language English
LinkModel DirectLink
MergedId FETCHMERGED-LOGICAL-c429t-c03e5802857976b85656c857a4eaba1e11adf02ff209524d549837232826fb453
Notes ObjectType-Article-1
SourceType-Scholarly Journals-1
ObjectType-Feature-2
content type line 14
ORCID 0000-0001-8840-4488
PQID 2226441007
PQPubID 2047452
PageCount 33
ParticipantIDs proquest_journals_2226441007
crossref_citationtrail_10_1016_j_trb_2019_02_015
crossref_primary_10_1016_j_trb_2019_02_015
elsevier_sciencedirect_doi_10_1016_j_trb_2019_02_015
ProviderPackageCode CITATION
AAYXX
PublicationCentury 2000
PublicationDate 2019-05-01
PublicationDateYYYYMMDD 2019-05-01
PublicationDate_xml – month: 05
  year: 2019
  text: 2019-05-01
  day: 01
PublicationDecade 2010
PublicationPlace Oxford
PublicationPlace_xml – name: Oxford
PublicationTitle Transportation research. Part B: methodological
PublicationYear 2019
Publisher Elsevier Ltd
Elsevier Science Ltd
Publisher_xml – name: Elsevier Ltd
– name: Elsevier Science Ltd
References Zhan, Kroon, Zhao, Peng (bib0028) 2016; 95
Pellegrini, Marlière, Rodriguez (bib0018) 2014; 59
Corman, D’Ariano, Pacciarelli, Pranzo (bib0005) 2010; 44
Narayanaswami, Rangaraj (bib0017) 2013; 64
Zilko, Kurowicka, Goverde (bib0030) 2016; 68
Binder, Maknoon, Bierlaire (bib0002) 2017; 78
Zhu, Goverde (bib0029) 2018
Ghaemi, Cats, Goverde (bib0009) 2017; 9
Sato, Tamura, Tomii (bib0021) 2013; 3
Van Aken, Bešinović, Goverde (bib0022) 2017; 98
Cacchiani, Huisman, Kidd, Kroon, Toth, Veelenturf, Wagenaar (bib0003) 2014; 63
Altazin, Dauzère-Pérès, Ramond, Tréfond (bib0001) 2017; 79
D’Ariano, Corman, Pacciarelli, Pranzo (bib0006) 2008; 42
Ghaemi, Cats, Goverde (bib0008) 2017; 105
Veelenturf, Kroon, Maróti (bib0025) 2017; 80
Meng, Zhou (bib0016) 2014; 67
Zhan, Kroon, Veelenturf, Wagenaar (bib0027) 2015; 78
Jespersen-Groth, Potthoff, Clausen, Huisman, Kroon, Maróti, Nielsen (bib0012) 2009
Lamorgese, Mannino (bib0013) 2015; 63
Veelenturf, Kidd, Cacchiani, Kroon, Toth (bib0024) 2015; 50
Ghaemi, Zilko, Yan, Cats, Kurowicka, Goverde (bib0011) 2018; 8
Puong, Wilson (bib0020) 2008
Gao, Kroon, Schmidt, Yang (bib0007) 2016; 93
Van Aken, Bešinović, Goverde (bib0023) 2017; 7
Louwerse, Huisman (bib0014) 2014; 235
Cadarso, Marín, Maróti (bib0004) 2013; 53
Meng, Zhou (bib0015) 2011; 45
Ghaemi, Cats, Goverde (bib0010) 2018; 89
Pellegrini, Pesenti, Rodriguez (bib0019) 2019; 120
Wilson, Macchi, Fellows, Deckoff (bib0026) 1992
Meng (10.1016/j.trb.2019.02.015_bib0016) 2014; 67
Pellegrini (10.1016/j.trb.2019.02.015_bib0019) 2019; 120
Corman (10.1016/j.trb.2019.02.015_bib0005) 2010; 44
Ghaemi (10.1016/j.trb.2019.02.015_bib0008) 2017; 105
Gao (10.1016/j.trb.2019.02.015_bib0007) 2016; 93
Altazin (10.1016/j.trb.2019.02.015_bib0001) 2017; 79
Louwerse (10.1016/j.trb.2019.02.015_bib0014) 2014; 235
Van Aken (10.1016/j.trb.2019.02.015_bib0022) 2017; 98
Puong (10.1016/j.trb.2019.02.015_bib0020) 2008
Cacchiani (10.1016/j.trb.2019.02.015_bib0003) 2014; 63
Ghaemi (10.1016/j.trb.2019.02.015_bib0009) 2017; 9
Zhan (10.1016/j.trb.2019.02.015_bib0028) 2016; 95
Veelenturf (10.1016/j.trb.2019.02.015_bib0024) 2015; 50
Cadarso (10.1016/j.trb.2019.02.015_bib0004) 2013; 53
Sato (10.1016/j.trb.2019.02.015_bib0021) 2013; 3
Ghaemi (10.1016/j.trb.2019.02.015_bib0011) 2018; 8
Jespersen-Groth (10.1016/j.trb.2019.02.015_bib0012) 2009
Binder (10.1016/j.trb.2019.02.015_bib0002) 2017; 78
Zhan (10.1016/j.trb.2019.02.015_bib0027) 2015; 78
Zhu (10.1016/j.trb.2019.02.015_sbref0029) 2018
Ghaemi (10.1016/j.trb.2019.02.015_bib0010) 2018; 89
D’Ariano (10.1016/j.trb.2019.02.015_bib0006) 2008; 42
Narayanaswami (10.1016/j.trb.2019.02.015_bib0017) 2013; 64
Pellegrini (10.1016/j.trb.2019.02.015_bib0018) 2014; 59
Van Aken (10.1016/j.trb.2019.02.015_bib0023) 2017; 7
Zilko (10.1016/j.trb.2019.02.015_bib0030) 2016; 68
Veelenturf (10.1016/j.trb.2019.02.015_bib0025) 2017; 80
Lamorgese (10.1016/j.trb.2019.02.015_bib0013) 2015; 63
Meng (10.1016/j.trb.2019.02.015_bib0015) 2011; 45
Wilson (10.1016/j.trb.2019.02.015_bib0026) 1992
References_xml – volume: 59
  start-page: 58
  year: 2014
  end-page: 80
  ident: bib0018
  article-title: Optimal train routing and scheduling for managing traffic perturbations in complex junctions
  publication-title: Transp. Res. Part B Methodol.
– volume: 44
  start-page: 175
  year: 2010
  end-page: 192
  ident: bib0005
  article-title: A tabu search algorithm for rerouting trains during rail operations
  publication-title: Transp. Res. Part B Methodol.
– volume: 63
  start-page: 15
  year: 2014
  end-page: 37
  ident: bib0003
  article-title: An overview of recovery models and algorithms for real-time railway rescheduling
  publication-title: Transp. Res. Part B Methodol.
– volume: 68
  start-page: 350
  year: 2016
  end-page: 368
  ident: bib0030
  article-title: Modeling railway disruption lengths with copula Bayesian networks
  publication-title: Transp. Res. Part C Emerg. Technol.
– volume: 89
  start-page: 113
  year: 2018
  end-page: 132
  ident: bib0010
  article-title: Macroscopic multiple-station short-turning model in case of complete railway blockages
  publication-title: Transp. Res. Part C Emerg. Technol.
– volume: 9
  start-page: 343
  year: 2017
  end-page: 364
  ident: bib0009
  article-title: Railway disruption management challenges and possible solution directions
  publication-title: Public Transp.
– volume: 45
  start-page: 1080
  year: 2011
  end-page: 1102
  ident: bib0015
  article-title: Robust single-track train dispatching model under a dynamic and stochastic environment: a scenario-based rolling horizon solution approach
  publication-title: Transp. Res. Part B Methodol.
– volume: 64
  start-page: 469
  year: 2013
  end-page: 481
  ident: bib0017
  article-title: Modelling disruptions and resolving conflicts optimally in a railway schedule
  publication-title: Comput. Ind. Eng.
– volume: 95
  start-page: 32
  year: 2016
  end-page: 61
  ident: bib0028
  article-title: A rolling horizon approach to the high speed train rescheduling problem in case of a partial segment blockage
  publication-title: Transp. Res. Part E Logist. Transp. Rev.
– volume: 120
  start-page: 33
  year: 2019
  end-page: 48
  ident: bib0019
  article-title: Efficient train re-routing and rescheduling: valid inequalities and reformulation of RECIFE-MILP
  publication-title: Transp. Res. Part B Methodol.
– volume: 105
  start-page: 423
  year: 2017
  end-page: 437
  ident: bib0008
  article-title: A microscopic model for optimal train short-turnings during complete blockages
  publication-title: Transp. Res. Part B Methodol.
– volume: 93
  start-page: 425
  year: 2016
  end-page: 449
  ident: bib0007
  article-title: Rescheduling a metro line in an over-crowded situation after disruptions
  publication-title: Transportation Research Part B: Methodological
– volume: 79
  start-page: 73
  year: 2017
  end-page: 84
  ident: bib0001
  article-title: Rescheduling through stop-skipping in dense railway systems
  publication-title: Transp. Res. Part C Emerg. Technol.
– volume: 78
  start-page: 78
  year: 2017
  end-page: 94
  ident: bib0002
  article-title: The multi-objective railway timetable rescheduling problem
  publication-title: Transp. Res. Part C Emerg. Technol.
– volume: 98
  start-page: 224
  year: 2017
  end-page: 238
  ident: bib0022
  article-title: Designing alternative railway timetables under infrastructure maintenance possessions
  publication-title: Transp. Res. Part B Methodol.
– volume: 7
  start-page: 141
  year: 2017
  end-page: 156
  ident: bib0023
  article-title: Solving large-scale train timetable adjustment problems under infrastructure maintenance possessions
  publication-title: J. Rail Transp. Plan. Manag.
– start-page: 296
  year: 1992
  end-page: 304
  ident: bib0026
  article-title: Improving service on the MBTA green line through better operations control
  publication-title: Transp. Res. Rec.
– volume: 78
  start-page: 182
  year: 2015
  end-page: 201
  ident: bib0027
  article-title: Real-time high-speed train rescheduling in case of a complete blockage
  publication-title: Transp. Res. Part B Methodol.
– volume: 50
  start-page: 841
  year: 2015
  end-page: 862
  ident: bib0024
  article-title: A railway timetable rescheduling approach for handling large-scale disruptions
  publication-title: Transp. Sci.
– start-page: 319
  year: 2008
  end-page: 337
  ident: bib0020
  article-title: A train holding model for urban rail transit systems
  publication-title: Computer-Aided Systems in Public Transport
– volume: 53
  start-page: 15
  year: 2013
  end-page: 33
  ident: bib0004
  article-title: Recovery of disruptions in rapid transit networks
  publication-title: Transp. Res. Part E Logist. Transp. Rev.
– volume: 3
  start-page: 38
  year: 2013
  end-page: 53
  ident: bib0021
  article-title: A MIP-based timetable rescheduling formulation and algorithm minimizing further inconvenience to passengers
  publication-title: J. Rail Transp. Plan. Manag.
– volume: 80
  start-page: 133
  year: 2017
  end-page: 147
  ident: bib0025
  article-title: Passenger oriented railway disruption management by adapting timetables and rolling stock schedules
  publication-title: Transp. Res. Part C Emerg. Technol.
– year: 2018
  ident: bib0029
  article-title: Dynamic passenger assignment model for major railway disruptions considering information interventions
  publication-title: Netw. Spat. Econ
– start-page: 399
  year: 2009
  end-page: 421
  ident: bib0012
  article-title: Disruption management in passenger railway transportation
  publication-title: Robust and Online Large-scale Optimization
– volume: 63
  start-page: 48
  year: 2015
  end-page: 64
  ident: bib0013
  article-title: An exact decomposition approach for the real-time train dispatching problem
  publication-title: Oper. Res.
– volume: 42
  start-page: 405
  year: 2008
  end-page: 419
  ident: bib0006
  article-title: Reordering and local rerouting strategies to manage train traffic in real time
  publication-title: Transp. Sci.
– volume: 8
  start-page: 103
  year: 2018
  end-page: 122
  ident: bib0011
  article-title: Impact of railway disruption predictions and rescheduling on passenger delays
  publication-title: J. Rail Transp. Plan. Manag.
– volume: 235
  start-page: 583
  year: 2014
  end-page: 593
  ident: bib0014
  article-title: Adjusting a railway timetable in case of partial or complete blockades
  publication-title: Eur. J. Oper. Res.
– volume: 67
  start-page: 208
  year: 2014
  end-page: 234
  ident: bib0016
  article-title: Simultaneous train rerouting and rescheduling on an n-track network: a model reformulation with network-based cumulative flow variables
  publication-title: Transp. Res. Part B Methodol.
– volume: 64
  start-page: 469
  issue: 1
  year: 2013
  ident: 10.1016/j.trb.2019.02.015_bib0017
  article-title: Modelling disruptions and resolving conflicts optimally in a railway schedule
  publication-title: Comput. Ind. Eng.
  doi: 10.1016/j.cie.2012.08.004
– volume: 78
  start-page: 182
  year: 2015
  ident: 10.1016/j.trb.2019.02.015_bib0027
  article-title: Real-time high-speed train rescheduling in case of a complete blockage
  publication-title: Transp. Res. Part B Methodol.
  doi: 10.1016/j.trb.2015.04.001
– volume: 63
  start-page: 48
  issue: 1
  year: 2015
  ident: 10.1016/j.trb.2019.02.015_bib0013
  article-title: An exact decomposition approach for the real-time train dispatching problem
  publication-title: Oper. Res.
  doi: 10.1287/opre.2014.1327
– start-page: 319
  year: 2008
  ident: 10.1016/j.trb.2019.02.015_bib0020
  article-title: A train holding model for urban rail transit systems
– volume: 95
  start-page: 32
  year: 2016
  ident: 10.1016/j.trb.2019.02.015_bib0028
  article-title: A rolling horizon approach to the high speed train rescheduling problem in case of a partial segment blockage
  publication-title: Transp. Res. Part E Logist. Transp. Rev.
  doi: 10.1016/j.tre.2016.07.015
– volume: 80
  start-page: 133
  year: 2017
  ident: 10.1016/j.trb.2019.02.015_bib0025
  article-title: Passenger oriented railway disruption management by adapting timetables and rolling stock schedules
  publication-title: Transp. Res. Part C Emerg. Technol.
  doi: 10.1016/j.trc.2017.04.012
– volume: 89
  start-page: 113
  year: 2018
  ident: 10.1016/j.trb.2019.02.015_bib0010
  article-title: Macroscopic multiple-station short-turning model in case of complete railway blockages
  publication-title: Transp. Res. Part C Emerg. Technol.
  doi: 10.1016/j.trc.2018.02.006
– volume: 45
  start-page: 1080
  issue: 7
  year: 2011
  ident: 10.1016/j.trb.2019.02.015_bib0015
  article-title: Robust single-track train dispatching model under a dynamic and stochastic environment: a scenario-based rolling horizon solution approach
  publication-title: Transp. Res. Part B Methodol.
  doi: 10.1016/j.trb.2011.05.001
– volume: 93
  start-page: 425
  year: 2016
  ident: 10.1016/j.trb.2019.02.015_bib0007
  article-title: Rescheduling a metro line in an over-crowded situation after disruptions
  publication-title: Transportation Research Part B: Methodological
  doi: 10.1016/j.trb.2016.08.011
– volume: 235
  start-page: 583
  issue: 3
  year: 2014
  ident: 10.1016/j.trb.2019.02.015_bib0014
  article-title: Adjusting a railway timetable in case of partial or complete blockades
  publication-title: Eur. J. Oper. Res.
  doi: 10.1016/j.ejor.2013.12.020
– start-page: 296
  issue: 1361
  year: 1992
  ident: 10.1016/j.trb.2019.02.015_bib0026
  article-title: Improving service on the MBTA green line through better operations control
  publication-title: Transp. Res. Rec.
– volume: 53
  start-page: 15
  year: 2013
  ident: 10.1016/j.trb.2019.02.015_bib0004
  article-title: Recovery of disruptions in rapid transit networks
  publication-title: Transp. Res. Part E Logist. Transp. Rev.
  doi: 10.1016/j.tre.2013.01.013
– volume: 44
  start-page: 175
  issue: 1
  year: 2010
  ident: 10.1016/j.trb.2019.02.015_bib0005
  article-title: A tabu search algorithm for rerouting trains during rail operations
  publication-title: Transp. Res. Part B Methodol.
  doi: 10.1016/j.trb.2009.05.004
– volume: 9
  start-page: 343
  issue: 1–2
  year: 2017
  ident: 10.1016/j.trb.2019.02.015_bib0009
  article-title: Railway disruption management challenges and possible solution directions
  publication-title: Public Transp.
  doi: 10.1007/s12469-017-0157-z
– volume: 3
  start-page: 38
  issue: 3
  year: 2013
  ident: 10.1016/j.trb.2019.02.015_bib0021
  article-title: A MIP-based timetable rescheduling formulation and algorithm minimizing further inconvenience to passengers
  publication-title: J. Rail Transp. Plan. Manag.
– volume: 79
  start-page: 73
  year: 2017
  ident: 10.1016/j.trb.2019.02.015_bib0001
  article-title: Rescheduling through stop-skipping in dense railway systems
  publication-title: Transp. Res. Part C Emerg. Technol.
  doi: 10.1016/j.trc.2017.03.012
– volume: 105
  start-page: 423
  year: 2017
  ident: 10.1016/j.trb.2019.02.015_bib0008
  article-title: A microscopic model for optimal train short-turnings during complete blockages
  publication-title: Transp. Res. Part B Methodol.
  doi: 10.1016/j.trb.2017.10.002
– volume: 7
  start-page: 141
  issue: 3
  year: 2017
  ident: 10.1016/j.trb.2019.02.015_bib0023
  article-title: Solving large-scale train timetable adjustment problems under infrastructure maintenance possessions
  publication-title: J. Rail Transp. Plan. Manag.
– volume: 59
  start-page: 58
  year: 2014
  ident: 10.1016/j.trb.2019.02.015_bib0018
  article-title: Optimal train routing and scheduling for managing traffic perturbations in complex junctions
  publication-title: Transp. Res. Part B Methodol.
  doi: 10.1016/j.trb.2013.10.013
– volume: 98
  start-page: 224
  year: 2017
  ident: 10.1016/j.trb.2019.02.015_bib0022
  article-title: Designing alternative railway timetables under infrastructure maintenance possessions
  publication-title: Transp. Res. Part B Methodol.
  doi: 10.1016/j.trb.2016.12.019
– volume: 78
  start-page: 78
  year: 2017
  ident: 10.1016/j.trb.2019.02.015_bib0002
  article-title: The multi-objective railway timetable rescheduling problem
  publication-title: Transp. Res. Part C Emerg. Technol.
  doi: 10.1016/j.trc.2017.02.001
– start-page: 399
  year: 2009
  ident: 10.1016/j.trb.2019.02.015_bib0012
  article-title: Disruption management in passenger railway transportation
– volume: 42
  start-page: 405
  issue: 4
  year: 2008
  ident: 10.1016/j.trb.2019.02.015_bib0006
  article-title: Reordering and local rerouting strategies to manage train traffic in real time
  publication-title: Transp. Sci.
  doi: 10.1287/trsc.1080.0247
– volume: 120
  start-page: 33
  year: 2019
  ident: 10.1016/j.trb.2019.02.015_bib0019
  article-title: Efficient train re-routing and rescheduling: valid inequalities and reformulation of RECIFE-MILP
  publication-title: Transp. Res. Part B Methodol.
  doi: 10.1016/j.trb.2018.12.008
– year: 2018
  ident: 10.1016/j.trb.2019.02.015_sbref0029
  article-title: Dynamic passenger assignment model for major railway disruptions considering information interventions
  publication-title: Netw. Spat. Econ
– volume: 8
  start-page: 103
  issue: 2
  year: 2018
  ident: 10.1016/j.trb.2019.02.015_bib0011
  article-title: Impact of railway disruption predictions and rescheduling on passenger delays
  publication-title: J. Rail Transp. Plan. Manag.
– volume: 63
  start-page: 15
  year: 2014
  ident: 10.1016/j.trb.2019.02.015_bib0003
  article-title: An overview of recovery models and algorithms for real-time railway rescheduling
  publication-title: Transp. Res. Part B Methodol.
  doi: 10.1016/j.trb.2014.01.009
– volume: 68
  start-page: 350
  year: 2016
  ident: 10.1016/j.trb.2019.02.015_bib0030
  article-title: Modeling railway disruption lengths with copula Bayesian networks
  publication-title: Transp. Res. Part C Emerg. Technol.
  doi: 10.1016/j.trc.2016.04.018
– volume: 50
  start-page: 841
  issue: 3
  year: 2015
  ident: 10.1016/j.trb.2019.02.015_bib0024
  article-title: A railway timetable rescheduling approach for handling large-scale disruptions
  publication-title: Transp. Sci.
  doi: 10.1287/trsc.2015.0618
– volume: 67
  start-page: 208
  year: 2014
  ident: 10.1016/j.trb.2019.02.015_bib0016
  article-title: Simultaneous train rerouting and rescheduling on an n-track network: a model reformulation with network-based cumulative flow variables
  publication-title: Transp. Res. Part B Methodol.
  doi: 10.1016/j.trb.2014.05.005
SSID ssj0003401
Score 2.5628753
Snippet •A new timetable rescheduling model is proposed, which includes flexible stopping and flexible short-turning as well as retiming, reordering, and cancelling...
Railway operations are vulnerable to unexpected disruptions that should be handled in an efficient and passenger-friendly way. To this end, we propose a...
SourceID proquest
crossref
elsevier
SourceType Aggregation Database
Enrichment Source
Index Database
Publisher
StartPage 149
SubjectTerms Cycle time
Disruption management
Flexible short-turning
Flexible stopping
Integer programming
Linear programming
Mixed integer
Passengers
Railway stations
Railways
Rescheduling
Time dependence
Timetable rescheduling
Timetables
Travel demand
Title Railway timetable rescheduling with flexible stopping and flexible short-turning during disruptions
URI https://dx.doi.org/10.1016/j.trb.2019.02.015
https://www.proquest.com/docview/2226441007
Volume 123
hasFullText 1
inHoldings 1
isFullTextHit
isPrint
link http://utb.summon.serialssolutions.com/2.0.0/link/0/eLvHCXMwnV1BS8MwFA5jHtSD6FSczpGDJ6GuzVLTHsdwTMUd1MFuoWkTrYw6tg7x4m_3vTbVKbKDx6RJKC_pe99Lv_ceIWdGhUolXIBvoozDleJO5AexEwD0N4EQRnQx3vludDkc85uJP6mRfhULg7RKq_tLnV5oa9vTsdLszNK08wDgxGNokANQw0ERw8W5wFN-8fFN8-hy19Yk9BwcXf3ZLDhe-Vwhuyss0nZiZdy_bdMvLV2YnsEu2bGYkfbK19ojNZ01yGYVUrxokO2VrIL7JL6P0ulb9E6xbnyOoVEUfGrYnARZ508Ur16pwUSY-AgzC2DMFI2yZKX3GWC5A-YIr01oGctIk3QxX5YkmAMyHlw99oeOraXgxGBxcid2u9oPAEz4AgCIChDHxdCIuI5U5GnPixLjMmMYYC7GE3AbwXUFuAXuh1Hc7x6Sevaa6SNCMWkg0-hr8ZALESoBB0EDEHA1rMBUk7iVFGVsE41jvYuprBhlLxIEL1Hw0mUSBN8k519TZmWWjXWDebU18sdRkWAF1k1rVdso7Xe6kIwVgBCA0vH_Vj0hW9gqKZAtUs_nS30KMCVX7eIctslG7_p2OPoEWNLmwQ
linkProvider Elsevier
linkToHtml http://utb.summon.serialssolutions.com/2.0.0/link/0/eLvHCXMwnV1LT8MwDLam7TA4IJ7iMSAHTkjV2iyl3XGamDb2OMAm7RY1bQJDaExbJ8S_x27TaSDEgWOTJqqc1P6c2J8BboxqKpWIAH0TZRyhlHAiP4ydEKG_CYPABA3Kdx6O7roT8TD1pyVoF7kwFFZpdX-u0zNtbVvqVpr1xWxWf0Jw4nEyyCGq4ZByuCrETuWXodLq9bujjUJuCNeWJfQcGlBcbmZhXulSUYBXM2PupOK4v5unH4o6sz6dfdizsJG18i87gJKeH0K1yCpeHcLuFrHgEcSP0eztI_pkVDo-pewohm41rk9CgefPjE5fmSEuTOoicgFKm2LRPNlqfUFk7qBFopMTlqczsmS2Wq7zOJhjmHTux-2uY8spODEandSJ3Yb2Q8QTfoAYRIUE5WJ8iISOVORpz4sS43JjOMIuLhL0HNF7RcSFHohRwm-cQHn-PtenwIg3kGtyt0RTBEFTBbgXNGIBV-MMXJ2BW0hRxpZrnEpevMkiqOxVouAlCV66XKLgz-B2M2SRE2389bIolkZ-2y0SDcFfw2rFMkr7q64k5xkmRKx0_r9Zr6HaHQ8HctAb9S9gh3ryiMgalNPlWl8iaknVld2VX0mE6XI
openUrl ctx_ver=Z39.88-2004&ctx_enc=info%3Aofi%2Fenc%3AUTF-8&rfr_id=info%3Asid%2Fsummon.serialssolutions.com&rft_val_fmt=info%3Aofi%2Ffmt%3Akev%3Amtx%3Ajournal&rft.genre=article&rft.atitle=Railway+timetable+rescheduling+with+flexible+stopping+and+flexible+short-turning+during+disruptions&rft.jtitle=Transportation+research.+Part+B%3A+methodological&rft.au=Zhu%2C+Yongqiu&rft.au=Goverde%2C+Rob+M.P.&rft.date=2019-05-01&rft.pub=Elsevier+Ltd&rft.issn=0191-2615&rft.eissn=1879-2367&rft.volume=123&rft.spage=149&rft.epage=181&rft_id=info:doi/10.1016%2Fj.trb.2019.02.015&rft.externalDocID=S0191261518303801
thumbnail_l http://covers-cdn.summon.serialssolutions.com/index.aspx?isbn=/lc.gif&issn=0191-2615&client=summon
thumbnail_m http://covers-cdn.summon.serialssolutions.com/index.aspx?isbn=/mc.gif&issn=0191-2615&client=summon
thumbnail_s http://covers-cdn.summon.serialssolutions.com/index.aspx?isbn=/sc.gif&issn=0191-2615&client=summon