Railway timetable rescheduling with flexible stopping and flexible short-turning during disruptions
•A new timetable rescheduling model is proposed, which includes flexible stopping and flexible short-turning as well as retiming, reordering, and cancelling trains.•The model deals with all phases of a disruption.•Adjusted train running times due to saved (extra) decelerations and accelerations are...
Saved in:
Published in | Transportation research. Part B: methodological Vol. 123; pp. 149 - 181 |
---|---|
Main Authors | , |
Format | Journal Article |
Language | English |
Published |
Oxford
Elsevier Ltd
01.05.2019
Elsevier Science Ltd |
Subjects | |
Online Access | Get full text |
Cover
Loading…
Abstract | •A new timetable rescheduling model is proposed, which includes flexible stopping and flexible short-turning as well as retiming, reordering, and cancelling trains.•The model deals with all phases of a disruption.•Adjusted train running times due to saved (extra) decelerations and accelerations are explicitly considered when skipping (adding) stops.•Station capacity is considered by ensuring that each train corresponding to passenger boarding/alighting stops at a platform track while the minimum headway times are taken into account.•Rolling stock circulations at the short-turning and terminal stations of trains are included.•Dispatching decisions are optimized with the objective of minimizing passenger delays.
Railway operations are vulnerable to unexpected disruptions that should be handled in an efficient and passenger-friendly way. To this end, we propose a timetable rescheduling model where flexible stopping (i.e. skipping stops and adding stops) and flexible short-turning (i.e. full choice of short-turn stations) are innovatively integrated with three other dispatching measures: retiming, reordering, and cancelling. The Mixed Integer Linear Programming model also ensures that each train serving a station is ensured with a platform track. To consider the rescheduling impact on passengers, the weight of each decision is estimated individually according to the time-dependent passenger demand. The objective is minimizing passenger delays. A case study is carried out for hundreds of disruption scenarios on a subnetwork of the Dutch railways. It is found that (1) applying a mix of flexible stopping and flexible short-turning results in less passenger delays; (2) shortening the recovery duration mitigates the post-disruption consequence by less delay propagation but is at the expense of more cancelled train services during the disruption; and (3) the optimal rescheduling solution is sensitive to the disruption duration, but some steady behaviour is observed when the disruption duration increases by the timetable cycle time. |
---|---|
AbstractList | Railway operations are vulnerable to unexpected disruptions that should be handled in an efficient and passenger-friendly way. To this end, we propose a timetable rescheduling model where flexible stopping (i.e. skipping stops and adding stops) and flexible short-turning (i.e. full choice of short-turn stations) are innovatively integrated with three other dispatching measures: retiming, reordering, and cancelling. The Mixed Integer Linear Programming model also ensures that each train serving a station is ensured with a platform track. To consider the rescheduling impact on passengers, the weight of each decision is estimated individually according to the time-dependent passenger demand. The objective is minimizing passenger delays. A case study is carried out for hundreds of disruption scenarios on a subnetwork of the Dutch railways. It is found that (1) applying a mix of flexible stopping and flexible short-turning results in less passenger delays; (2) shortening the recovery duration mitigates the post-disruption consequence by less delay propagation but is at the expense of more cancelled train services during the disruption; and (3) the optimal rescheduling solution is sensitive to the disruption duration, but some steady behaviour is observed when the disruption duration increases by the timetable cycle time. •A new timetable rescheduling model is proposed, which includes flexible stopping and flexible short-turning as well as retiming, reordering, and cancelling trains.•The model deals with all phases of a disruption.•Adjusted train running times due to saved (extra) decelerations and accelerations are explicitly considered when skipping (adding) stops.•Station capacity is considered by ensuring that each train corresponding to passenger boarding/alighting stops at a platform track while the minimum headway times are taken into account.•Rolling stock circulations at the short-turning and terminal stations of trains are included.•Dispatching decisions are optimized with the objective of minimizing passenger delays. Railway operations are vulnerable to unexpected disruptions that should be handled in an efficient and passenger-friendly way. To this end, we propose a timetable rescheduling model where flexible stopping (i.e. skipping stops and adding stops) and flexible short-turning (i.e. full choice of short-turn stations) are innovatively integrated with three other dispatching measures: retiming, reordering, and cancelling. The Mixed Integer Linear Programming model also ensures that each train serving a station is ensured with a platform track. To consider the rescheduling impact on passengers, the weight of each decision is estimated individually according to the time-dependent passenger demand. The objective is minimizing passenger delays. A case study is carried out for hundreds of disruption scenarios on a subnetwork of the Dutch railways. It is found that (1) applying a mix of flexible stopping and flexible short-turning results in less passenger delays; (2) shortening the recovery duration mitigates the post-disruption consequence by less delay propagation but is at the expense of more cancelled train services during the disruption; and (3) the optimal rescheduling solution is sensitive to the disruption duration, but some steady behaviour is observed when the disruption duration increases by the timetable cycle time. |
Author | Goverde, Rob M.P. Zhu, Yongqiu |
Author_xml | – sequence: 1 givenname: Yongqiu surname: Zhu fullname: Zhu, Yongqiu email: y.zhu-5@tudelft.nl – sequence: 2 givenname: Rob M.P. orcidid: 0000-0001-8840-4488 surname: Goverde fullname: Goverde, Rob M.P. email: r.m.p.goverde@tudelft.nl |
BookMark | eNp9kE1LxDAQhoOs4O7qD_BW8Nw6SZt-4EkWv2BBED2HNJ26Kd22Jqnr_ntT14N42NOQeedJJs-CzLq-Q0IuKUQUaHrdRM6UEQNaRMAioPyEzGmeFSGL02xG5j6gIUspPyMLaxsAiBOgc6JepG53ch84vUUnyxYDg1ZtsBpb3b0HO-02Qd3il54i6_phmNqyq_50N71xoRtNN0XVaH6KtmYcnO47e05Oa9lavPitS_J2f_e6egzXzw9Pq9t1qBJWuFBBjDwHlvOsyNIy5ylPlT_IBGUpKVIqqxpYXTMoOEsqnhR5nLGY5Syty4THS3J1uHcw_ceI1omm90v5JwVjLE0SCpD5qewwpUxvrcFaKO3ktKgz3oWgICajohHeqJiMCmDCG_Uk_UcORm-l2R9lbg4M-o9_ajTCKo2dwkobVE5UvT5CfwOjvZGf |
CitedBy_id | crossref_primary_10_1080_23249935_2023_2220423 crossref_primary_10_1016_j_ins_2023_03_003 crossref_primary_10_1016_j_trc_2020_102889 crossref_primary_10_1177_03611981221115079 crossref_primary_10_3390_su151713040 crossref_primary_10_1360_SSI_2021_0332 crossref_primary_10_3390_app131910695 crossref_primary_10_1016_j_tust_2024_106186 crossref_primary_10_1109_TITS_2022_3228340 crossref_primary_10_1016_j_aej_2021_01_027 crossref_primary_10_1016_j_tre_2023_103339 crossref_primary_10_2139_ssrn_4158253 crossref_primary_10_1109_ACCESS_2020_3022667 crossref_primary_10_1155_2024_9961840 crossref_primary_10_1109_TITS_2024_3394535 crossref_primary_10_1155_2022_2917240 crossref_primary_10_1016_j_ejor_2021_03_014 crossref_primary_10_1016_j_tre_2024_103900 crossref_primary_10_1080_23248378_2024_2306964 crossref_primary_10_1016_j_trb_2024_103094 crossref_primary_10_1155_2023_3897353 crossref_primary_10_1155_2020_8974315 crossref_primary_10_3390_app14125006 crossref_primary_10_1016_j_trc_2025_105076 crossref_primary_10_1177_03611981221104810 crossref_primary_10_1016_j_trb_2024_102885 crossref_primary_10_1177_03611981241252143 crossref_primary_10_1016_j_ejor_2021_11_019 crossref_primary_10_3390_app13063729 crossref_primary_10_1080_01441647_2020_1728419 crossref_primary_10_1109_TITS_2020_3041151 crossref_primary_10_1016_j_trb_2021_06_001 crossref_primary_10_1109_TITS_2024_3386728 crossref_primary_10_1016_j_tranpol_2022_03_006 crossref_primary_10_1016_j_trc_2021_103368 crossref_primary_10_1051_e3sconf_202340206016 crossref_primary_10_1049_itr2_12001 crossref_primary_10_1016_j_aej_2025_03_003 crossref_primary_10_1016_j_cor_2022_105859 crossref_primary_10_1109_TITS_2023_3236004 crossref_primary_10_1177_03611981211052960 crossref_primary_10_1177_1748006X19889149 crossref_primary_10_1016_j_trc_2021_103080 crossref_primary_10_1080_23248378_2024_2329717 crossref_primary_10_1016_j_cie_2024_109980 crossref_primary_10_3390_app12041919 crossref_primary_10_1016_j_trb_2024_103067 crossref_primary_10_3390_machines11060580 crossref_primary_10_1016_j_cie_2023_109742 crossref_primary_10_1007_s12469_021_00261_5 crossref_primary_10_1080_21680566_2023_2203847 crossref_primary_10_1177_03611981241242083 crossref_primary_10_1016_j_trb_2021_08_003 crossref_primary_10_1109_JRFID_2024_3379225 crossref_primary_10_1080_23249935_2021_1877369 crossref_primary_10_3390_app14146273 crossref_primary_10_1016_j_cor_2023_106479 crossref_primary_10_1016_j_trb_2023_02_015 crossref_primary_10_1007_s12469_023_00344_5 crossref_primary_10_1016_j_ress_2022_108538 crossref_primary_10_1016_j_tre_2024_103605 crossref_primary_10_1080_21680566_2024_2336041 crossref_primary_10_1177_03611981241258747 crossref_primary_10_1016_j_trc_2022_103994 crossref_primary_10_1016_j_omega_2024_103040 crossref_primary_10_1016_j_trb_2020_09_001 crossref_primary_10_1016_j_trb_2023_102786 crossref_primary_10_1016_j_trc_2024_104681 crossref_primary_10_1016_j_ejor_2020_03_034 crossref_primary_10_1109_TCSS_2024_3379214 crossref_primary_10_47072_demiryolu_1203693 crossref_primary_10_1080_21680566_2020_1854896 crossref_primary_10_1080_0305215X_2023_2213640 crossref_primary_10_1016_j_ijtst_2021_02_002 crossref_primary_10_1371_journal_pone_0246077 crossref_primary_10_1016_j_omega_2023_102968 crossref_primary_10_1007_s00500_021_05708_2 crossref_primary_10_1080_21680566_2021_1932638 crossref_primary_10_3390_su151914511 crossref_primary_10_1016_j_asoc_2023_110590 crossref_primary_10_1016_j_trd_2021_102975 crossref_primary_10_1016_j_trc_2020_102959 crossref_primary_10_1109_TITS_2021_3093570 crossref_primary_10_1186_s12544_023_00587_0 crossref_primary_10_1016_j_jrtpm_2022_100318 crossref_primary_10_1016_j_trb_2020_11_006 crossref_primary_10_1080_01605682_2020_1806745 crossref_primary_10_1016_j_tre_2021_102492 crossref_primary_10_1007_s42524_023_0291_z crossref_primary_10_1016_j_ejor_2023_07_023 crossref_primary_10_1016_j_jrtpm_2020_100196 crossref_primary_10_3390_app12094465 crossref_primary_10_1016_j_cie_2025_111018 crossref_primary_10_12720_jait_15_4_458_466 crossref_primary_10_1016_j_trc_2023_104150 crossref_primary_10_1287_trsc_2021_1107 |
Cites_doi | 10.1016/j.cie.2012.08.004 10.1016/j.trb.2015.04.001 10.1287/opre.2014.1327 10.1016/j.tre.2016.07.015 10.1016/j.trc.2017.04.012 10.1016/j.trc.2018.02.006 10.1016/j.trb.2011.05.001 10.1016/j.trb.2016.08.011 10.1016/j.ejor.2013.12.020 10.1016/j.tre.2013.01.013 10.1016/j.trb.2009.05.004 10.1007/s12469-017-0157-z 10.1016/j.trc.2017.03.012 10.1016/j.trb.2017.10.002 10.1016/j.trb.2013.10.013 10.1016/j.trb.2016.12.019 10.1016/j.trc.2017.02.001 10.1287/trsc.1080.0247 10.1016/j.trb.2018.12.008 10.1016/j.trb.2014.01.009 10.1016/j.trc.2016.04.018 10.1287/trsc.2015.0618 10.1016/j.trb.2014.05.005 |
ContentType | Journal Article |
Copyright | 2019 Elsevier Ltd Copyright Elsevier Science Ltd. May 2019 |
Copyright_xml | – notice: 2019 Elsevier Ltd – notice: Copyright Elsevier Science Ltd. May 2019 |
DBID | AAYXX CITATION 7ST 8FD C1K FR3 KR7 SOI |
DOI | 10.1016/j.trb.2019.02.015 |
DatabaseName | CrossRef Environment Abstracts Technology Research Database Environmental Sciences and Pollution Management Engineering Research Database Civil Engineering Abstracts Environment Abstracts |
DatabaseTitle | CrossRef Civil Engineering Abstracts Engineering Research Database Technology Research Database Environment Abstracts Environmental Sciences and Pollution Management |
DatabaseTitleList | Civil Engineering Abstracts |
DeliveryMethod | fulltext_linktorsrc |
Discipline | Economics Engineering |
EISSN | 1879-2367 |
EndPage | 181 |
ExternalDocumentID | 10_1016_j_trb_2019_02_015 S0191261518303801 |
GroupedDBID | --K --M -~X .DC .~1 0R~ 123 1B1 1RT 1~. 1~5 29Q 4.4 457 4G. 5VS 7-5 71M 8P~ 9JO AAAKF AAAKG AACTN AAEDT AAEDW AAFJI AAIAV AAIKJ AAKOC AALRI AAOAW AAQFI AAQXK AARIN AAXUO ABDEX ABDMP ABFNM ABLJU ABMAC ABMMH ABPPZ ABUCO ABXDB ABYKQ ACDAQ ACGFS ACNCT ACRLP ADBBV ADEZE ADMUD AEBSH AEKER AFKWA AFTJW AGHFR AGUBO AGYEJ AHHHB AHRSL AIEXJ AIKHN AITUG AJBFU AJOXV AKYCK ALMA_UNASSIGNED_HOLDINGS AMFUW AMRAJ AOMHK APLSM ASPBG AVARZ AVWKF AXJTR AZFZN BKOJK BLXMC CS3 EBS EFJIC EFLBG EJD EO8 EO9 EP2 EP3 FDB FEDTE FGOYB FIRID FNPLU FYGXN G-2 G-Q GBLVA HAMUX HMY HVGLF HZ~ H~9 IHE J1W KOM LY1 LY7 M3Y M41 MO0 MS~ N9A O-L O9- OAUVE OHT OZT P-8 P-9 P2P PC. PRBVW Q38 R2- RIG ROL RPZ SDF SDG SDP SDS SES SET SEW SPCBC SSB SSD SSO SSS SSZ T5K WUQ XPP ~G- AATTM AAXKI AAYWO AAYXX ABWVN ACRPL ADNMO AEIPS AFJKZ AFXIZ AGCQF AGQPQ AGRNS AIIUN ANKPU APXCP BNPGV CITATION SSH 7ST 8FD C1K EFKBS FR3 KR7 SOI |
ID | FETCH-LOGICAL-c429t-c03e5802857976b85656c857a4eaba1e11adf02ff209524d549837232826fb453 |
IEDL.DBID | .~1 |
ISSN | 0191-2615 |
IngestDate | Wed Aug 13 11:15:07 EDT 2025 Tue Jul 01 03:50:13 EDT 2025 Thu Apr 24 23:09:56 EDT 2025 Fri Feb 23 02:33:21 EST 2024 |
IsPeerReviewed | true |
IsScholarly | true |
Keywords | Flexible stopping Disruption management Timetable rescheduling Railways Flexible short-turning |
Language | English |
LinkModel | DirectLink |
MergedId | FETCHMERGED-LOGICAL-c429t-c03e5802857976b85656c857a4eaba1e11adf02ff209524d549837232826fb453 |
Notes | ObjectType-Article-1 SourceType-Scholarly Journals-1 ObjectType-Feature-2 content type line 14 |
ORCID | 0000-0001-8840-4488 |
PQID | 2226441007 |
PQPubID | 2047452 |
PageCount | 33 |
ParticipantIDs | proquest_journals_2226441007 crossref_citationtrail_10_1016_j_trb_2019_02_015 crossref_primary_10_1016_j_trb_2019_02_015 elsevier_sciencedirect_doi_10_1016_j_trb_2019_02_015 |
ProviderPackageCode | CITATION AAYXX |
PublicationCentury | 2000 |
PublicationDate | 2019-05-01 |
PublicationDateYYYYMMDD | 2019-05-01 |
PublicationDate_xml | – month: 05 year: 2019 text: 2019-05-01 day: 01 |
PublicationDecade | 2010 |
PublicationPlace | Oxford |
PublicationPlace_xml | – name: Oxford |
PublicationTitle | Transportation research. Part B: methodological |
PublicationYear | 2019 |
Publisher | Elsevier Ltd Elsevier Science Ltd |
Publisher_xml | – name: Elsevier Ltd – name: Elsevier Science Ltd |
References | Zhan, Kroon, Zhao, Peng (bib0028) 2016; 95 Pellegrini, Marlière, Rodriguez (bib0018) 2014; 59 Corman, D’Ariano, Pacciarelli, Pranzo (bib0005) 2010; 44 Narayanaswami, Rangaraj (bib0017) 2013; 64 Zilko, Kurowicka, Goverde (bib0030) 2016; 68 Binder, Maknoon, Bierlaire (bib0002) 2017; 78 Zhu, Goverde (bib0029) 2018 Ghaemi, Cats, Goverde (bib0009) 2017; 9 Sato, Tamura, Tomii (bib0021) 2013; 3 Van Aken, Bešinović, Goverde (bib0022) 2017; 98 Cacchiani, Huisman, Kidd, Kroon, Toth, Veelenturf, Wagenaar (bib0003) 2014; 63 Altazin, Dauzère-Pérès, Ramond, Tréfond (bib0001) 2017; 79 D’Ariano, Corman, Pacciarelli, Pranzo (bib0006) 2008; 42 Ghaemi, Cats, Goverde (bib0008) 2017; 105 Veelenturf, Kroon, Maróti (bib0025) 2017; 80 Meng, Zhou (bib0016) 2014; 67 Zhan, Kroon, Veelenturf, Wagenaar (bib0027) 2015; 78 Jespersen-Groth, Potthoff, Clausen, Huisman, Kroon, Maróti, Nielsen (bib0012) 2009 Lamorgese, Mannino (bib0013) 2015; 63 Veelenturf, Kidd, Cacchiani, Kroon, Toth (bib0024) 2015; 50 Ghaemi, Zilko, Yan, Cats, Kurowicka, Goverde (bib0011) 2018; 8 Puong, Wilson (bib0020) 2008 Gao, Kroon, Schmidt, Yang (bib0007) 2016; 93 Van Aken, Bešinović, Goverde (bib0023) 2017; 7 Louwerse, Huisman (bib0014) 2014; 235 Cadarso, Marín, Maróti (bib0004) 2013; 53 Meng, Zhou (bib0015) 2011; 45 Ghaemi, Cats, Goverde (bib0010) 2018; 89 Pellegrini, Pesenti, Rodriguez (bib0019) 2019; 120 Wilson, Macchi, Fellows, Deckoff (bib0026) 1992 Meng (10.1016/j.trb.2019.02.015_bib0016) 2014; 67 Pellegrini (10.1016/j.trb.2019.02.015_bib0019) 2019; 120 Corman (10.1016/j.trb.2019.02.015_bib0005) 2010; 44 Ghaemi (10.1016/j.trb.2019.02.015_bib0008) 2017; 105 Gao (10.1016/j.trb.2019.02.015_bib0007) 2016; 93 Altazin (10.1016/j.trb.2019.02.015_bib0001) 2017; 79 Louwerse (10.1016/j.trb.2019.02.015_bib0014) 2014; 235 Van Aken (10.1016/j.trb.2019.02.015_bib0022) 2017; 98 Puong (10.1016/j.trb.2019.02.015_bib0020) 2008 Cacchiani (10.1016/j.trb.2019.02.015_bib0003) 2014; 63 Ghaemi (10.1016/j.trb.2019.02.015_bib0009) 2017; 9 Zhan (10.1016/j.trb.2019.02.015_bib0028) 2016; 95 Veelenturf (10.1016/j.trb.2019.02.015_bib0024) 2015; 50 Cadarso (10.1016/j.trb.2019.02.015_bib0004) 2013; 53 Sato (10.1016/j.trb.2019.02.015_bib0021) 2013; 3 Ghaemi (10.1016/j.trb.2019.02.015_bib0011) 2018; 8 Jespersen-Groth (10.1016/j.trb.2019.02.015_bib0012) 2009 Binder (10.1016/j.trb.2019.02.015_bib0002) 2017; 78 Zhan (10.1016/j.trb.2019.02.015_bib0027) 2015; 78 Zhu (10.1016/j.trb.2019.02.015_sbref0029) 2018 Ghaemi (10.1016/j.trb.2019.02.015_bib0010) 2018; 89 D’Ariano (10.1016/j.trb.2019.02.015_bib0006) 2008; 42 Narayanaswami (10.1016/j.trb.2019.02.015_bib0017) 2013; 64 Pellegrini (10.1016/j.trb.2019.02.015_bib0018) 2014; 59 Van Aken (10.1016/j.trb.2019.02.015_bib0023) 2017; 7 Zilko (10.1016/j.trb.2019.02.015_bib0030) 2016; 68 Veelenturf (10.1016/j.trb.2019.02.015_bib0025) 2017; 80 Lamorgese (10.1016/j.trb.2019.02.015_bib0013) 2015; 63 Meng (10.1016/j.trb.2019.02.015_bib0015) 2011; 45 Wilson (10.1016/j.trb.2019.02.015_bib0026) 1992 |
References_xml | – volume: 59 start-page: 58 year: 2014 end-page: 80 ident: bib0018 article-title: Optimal train routing and scheduling for managing traffic perturbations in complex junctions publication-title: Transp. Res. Part B Methodol. – volume: 44 start-page: 175 year: 2010 end-page: 192 ident: bib0005 article-title: A tabu search algorithm for rerouting trains during rail operations publication-title: Transp. Res. Part B Methodol. – volume: 63 start-page: 15 year: 2014 end-page: 37 ident: bib0003 article-title: An overview of recovery models and algorithms for real-time railway rescheduling publication-title: Transp. Res. Part B Methodol. – volume: 68 start-page: 350 year: 2016 end-page: 368 ident: bib0030 article-title: Modeling railway disruption lengths with copula Bayesian networks publication-title: Transp. Res. Part C Emerg. Technol. – volume: 89 start-page: 113 year: 2018 end-page: 132 ident: bib0010 article-title: Macroscopic multiple-station short-turning model in case of complete railway blockages publication-title: Transp. Res. Part C Emerg. Technol. – volume: 9 start-page: 343 year: 2017 end-page: 364 ident: bib0009 article-title: Railway disruption management challenges and possible solution directions publication-title: Public Transp. – volume: 45 start-page: 1080 year: 2011 end-page: 1102 ident: bib0015 article-title: Robust single-track train dispatching model under a dynamic and stochastic environment: a scenario-based rolling horizon solution approach publication-title: Transp. Res. Part B Methodol. – volume: 64 start-page: 469 year: 2013 end-page: 481 ident: bib0017 article-title: Modelling disruptions and resolving conflicts optimally in a railway schedule publication-title: Comput. Ind. Eng. – volume: 95 start-page: 32 year: 2016 end-page: 61 ident: bib0028 article-title: A rolling horizon approach to the high speed train rescheduling problem in case of a partial segment blockage publication-title: Transp. Res. Part E Logist. Transp. Rev. – volume: 120 start-page: 33 year: 2019 end-page: 48 ident: bib0019 article-title: Efficient train re-routing and rescheduling: valid inequalities and reformulation of RECIFE-MILP publication-title: Transp. Res. Part B Methodol. – volume: 105 start-page: 423 year: 2017 end-page: 437 ident: bib0008 article-title: A microscopic model for optimal train short-turnings during complete blockages publication-title: Transp. Res. Part B Methodol. – volume: 93 start-page: 425 year: 2016 end-page: 449 ident: bib0007 article-title: Rescheduling a metro line in an over-crowded situation after disruptions publication-title: Transportation Research Part B: Methodological – volume: 79 start-page: 73 year: 2017 end-page: 84 ident: bib0001 article-title: Rescheduling through stop-skipping in dense railway systems publication-title: Transp. Res. Part C Emerg. Technol. – volume: 78 start-page: 78 year: 2017 end-page: 94 ident: bib0002 article-title: The multi-objective railway timetable rescheduling problem publication-title: Transp. Res. Part C Emerg. Technol. – volume: 98 start-page: 224 year: 2017 end-page: 238 ident: bib0022 article-title: Designing alternative railway timetables under infrastructure maintenance possessions publication-title: Transp. Res. Part B Methodol. – volume: 7 start-page: 141 year: 2017 end-page: 156 ident: bib0023 article-title: Solving large-scale train timetable adjustment problems under infrastructure maintenance possessions publication-title: J. Rail Transp. Plan. Manag. – start-page: 296 year: 1992 end-page: 304 ident: bib0026 article-title: Improving service on the MBTA green line through better operations control publication-title: Transp. Res. Rec. – volume: 78 start-page: 182 year: 2015 end-page: 201 ident: bib0027 article-title: Real-time high-speed train rescheduling in case of a complete blockage publication-title: Transp. Res. Part B Methodol. – volume: 50 start-page: 841 year: 2015 end-page: 862 ident: bib0024 article-title: A railway timetable rescheduling approach for handling large-scale disruptions publication-title: Transp. Sci. – start-page: 319 year: 2008 end-page: 337 ident: bib0020 article-title: A train holding model for urban rail transit systems publication-title: Computer-Aided Systems in Public Transport – volume: 53 start-page: 15 year: 2013 end-page: 33 ident: bib0004 article-title: Recovery of disruptions in rapid transit networks publication-title: Transp. Res. Part E Logist. Transp. Rev. – volume: 3 start-page: 38 year: 2013 end-page: 53 ident: bib0021 article-title: A MIP-based timetable rescheduling formulation and algorithm minimizing further inconvenience to passengers publication-title: J. Rail Transp. Plan. Manag. – volume: 80 start-page: 133 year: 2017 end-page: 147 ident: bib0025 article-title: Passenger oriented railway disruption management by adapting timetables and rolling stock schedules publication-title: Transp. Res. Part C Emerg. Technol. – year: 2018 ident: bib0029 article-title: Dynamic passenger assignment model for major railway disruptions considering information interventions publication-title: Netw. Spat. Econ – start-page: 399 year: 2009 end-page: 421 ident: bib0012 article-title: Disruption management in passenger railway transportation publication-title: Robust and Online Large-scale Optimization – volume: 63 start-page: 48 year: 2015 end-page: 64 ident: bib0013 article-title: An exact decomposition approach for the real-time train dispatching problem publication-title: Oper. Res. – volume: 42 start-page: 405 year: 2008 end-page: 419 ident: bib0006 article-title: Reordering and local rerouting strategies to manage train traffic in real time publication-title: Transp. Sci. – volume: 8 start-page: 103 year: 2018 end-page: 122 ident: bib0011 article-title: Impact of railway disruption predictions and rescheduling on passenger delays publication-title: J. Rail Transp. Plan. Manag. – volume: 235 start-page: 583 year: 2014 end-page: 593 ident: bib0014 article-title: Adjusting a railway timetable in case of partial or complete blockades publication-title: Eur. J. Oper. Res. – volume: 67 start-page: 208 year: 2014 end-page: 234 ident: bib0016 article-title: Simultaneous train rerouting and rescheduling on an n-track network: a model reformulation with network-based cumulative flow variables publication-title: Transp. Res. Part B Methodol. – volume: 64 start-page: 469 issue: 1 year: 2013 ident: 10.1016/j.trb.2019.02.015_bib0017 article-title: Modelling disruptions and resolving conflicts optimally in a railway schedule publication-title: Comput. Ind. Eng. doi: 10.1016/j.cie.2012.08.004 – volume: 78 start-page: 182 year: 2015 ident: 10.1016/j.trb.2019.02.015_bib0027 article-title: Real-time high-speed train rescheduling in case of a complete blockage publication-title: Transp. Res. Part B Methodol. doi: 10.1016/j.trb.2015.04.001 – volume: 63 start-page: 48 issue: 1 year: 2015 ident: 10.1016/j.trb.2019.02.015_bib0013 article-title: An exact decomposition approach for the real-time train dispatching problem publication-title: Oper. Res. doi: 10.1287/opre.2014.1327 – start-page: 319 year: 2008 ident: 10.1016/j.trb.2019.02.015_bib0020 article-title: A train holding model for urban rail transit systems – volume: 95 start-page: 32 year: 2016 ident: 10.1016/j.trb.2019.02.015_bib0028 article-title: A rolling horizon approach to the high speed train rescheduling problem in case of a partial segment blockage publication-title: Transp. Res. Part E Logist. Transp. Rev. doi: 10.1016/j.tre.2016.07.015 – volume: 80 start-page: 133 year: 2017 ident: 10.1016/j.trb.2019.02.015_bib0025 article-title: Passenger oriented railway disruption management by adapting timetables and rolling stock schedules publication-title: Transp. Res. Part C Emerg. Technol. doi: 10.1016/j.trc.2017.04.012 – volume: 89 start-page: 113 year: 2018 ident: 10.1016/j.trb.2019.02.015_bib0010 article-title: Macroscopic multiple-station short-turning model in case of complete railway blockages publication-title: Transp. Res. Part C Emerg. Technol. doi: 10.1016/j.trc.2018.02.006 – volume: 45 start-page: 1080 issue: 7 year: 2011 ident: 10.1016/j.trb.2019.02.015_bib0015 article-title: Robust single-track train dispatching model under a dynamic and stochastic environment: a scenario-based rolling horizon solution approach publication-title: Transp. Res. Part B Methodol. doi: 10.1016/j.trb.2011.05.001 – volume: 93 start-page: 425 year: 2016 ident: 10.1016/j.trb.2019.02.015_bib0007 article-title: Rescheduling a metro line in an over-crowded situation after disruptions publication-title: Transportation Research Part B: Methodological doi: 10.1016/j.trb.2016.08.011 – volume: 235 start-page: 583 issue: 3 year: 2014 ident: 10.1016/j.trb.2019.02.015_bib0014 article-title: Adjusting a railway timetable in case of partial or complete blockades publication-title: Eur. J. Oper. Res. doi: 10.1016/j.ejor.2013.12.020 – start-page: 296 issue: 1361 year: 1992 ident: 10.1016/j.trb.2019.02.015_bib0026 article-title: Improving service on the MBTA green line through better operations control publication-title: Transp. Res. Rec. – volume: 53 start-page: 15 year: 2013 ident: 10.1016/j.trb.2019.02.015_bib0004 article-title: Recovery of disruptions in rapid transit networks publication-title: Transp. Res. Part E Logist. Transp. Rev. doi: 10.1016/j.tre.2013.01.013 – volume: 44 start-page: 175 issue: 1 year: 2010 ident: 10.1016/j.trb.2019.02.015_bib0005 article-title: A tabu search algorithm for rerouting trains during rail operations publication-title: Transp. Res. Part B Methodol. doi: 10.1016/j.trb.2009.05.004 – volume: 9 start-page: 343 issue: 1–2 year: 2017 ident: 10.1016/j.trb.2019.02.015_bib0009 article-title: Railway disruption management challenges and possible solution directions publication-title: Public Transp. doi: 10.1007/s12469-017-0157-z – volume: 3 start-page: 38 issue: 3 year: 2013 ident: 10.1016/j.trb.2019.02.015_bib0021 article-title: A MIP-based timetable rescheduling formulation and algorithm minimizing further inconvenience to passengers publication-title: J. Rail Transp. Plan. Manag. – volume: 79 start-page: 73 year: 2017 ident: 10.1016/j.trb.2019.02.015_bib0001 article-title: Rescheduling through stop-skipping in dense railway systems publication-title: Transp. Res. Part C Emerg. Technol. doi: 10.1016/j.trc.2017.03.012 – volume: 105 start-page: 423 year: 2017 ident: 10.1016/j.trb.2019.02.015_bib0008 article-title: A microscopic model for optimal train short-turnings during complete blockages publication-title: Transp. Res. Part B Methodol. doi: 10.1016/j.trb.2017.10.002 – volume: 7 start-page: 141 issue: 3 year: 2017 ident: 10.1016/j.trb.2019.02.015_bib0023 article-title: Solving large-scale train timetable adjustment problems under infrastructure maintenance possessions publication-title: J. Rail Transp. Plan. Manag. – volume: 59 start-page: 58 year: 2014 ident: 10.1016/j.trb.2019.02.015_bib0018 article-title: Optimal train routing and scheduling for managing traffic perturbations in complex junctions publication-title: Transp. Res. Part B Methodol. doi: 10.1016/j.trb.2013.10.013 – volume: 98 start-page: 224 year: 2017 ident: 10.1016/j.trb.2019.02.015_bib0022 article-title: Designing alternative railway timetables under infrastructure maintenance possessions publication-title: Transp. Res. Part B Methodol. doi: 10.1016/j.trb.2016.12.019 – volume: 78 start-page: 78 year: 2017 ident: 10.1016/j.trb.2019.02.015_bib0002 article-title: The multi-objective railway timetable rescheduling problem publication-title: Transp. Res. Part C Emerg. Technol. doi: 10.1016/j.trc.2017.02.001 – start-page: 399 year: 2009 ident: 10.1016/j.trb.2019.02.015_bib0012 article-title: Disruption management in passenger railway transportation – volume: 42 start-page: 405 issue: 4 year: 2008 ident: 10.1016/j.trb.2019.02.015_bib0006 article-title: Reordering and local rerouting strategies to manage train traffic in real time publication-title: Transp. Sci. doi: 10.1287/trsc.1080.0247 – volume: 120 start-page: 33 year: 2019 ident: 10.1016/j.trb.2019.02.015_bib0019 article-title: Efficient train re-routing and rescheduling: valid inequalities and reformulation of RECIFE-MILP publication-title: Transp. Res. Part B Methodol. doi: 10.1016/j.trb.2018.12.008 – year: 2018 ident: 10.1016/j.trb.2019.02.015_sbref0029 article-title: Dynamic passenger assignment model for major railway disruptions considering information interventions publication-title: Netw. Spat. Econ – volume: 8 start-page: 103 issue: 2 year: 2018 ident: 10.1016/j.trb.2019.02.015_bib0011 article-title: Impact of railway disruption predictions and rescheduling on passenger delays publication-title: J. Rail Transp. Plan. Manag. – volume: 63 start-page: 15 year: 2014 ident: 10.1016/j.trb.2019.02.015_bib0003 article-title: An overview of recovery models and algorithms for real-time railway rescheduling publication-title: Transp. Res. Part B Methodol. doi: 10.1016/j.trb.2014.01.009 – volume: 68 start-page: 350 year: 2016 ident: 10.1016/j.trb.2019.02.015_bib0030 article-title: Modeling railway disruption lengths with copula Bayesian networks publication-title: Transp. Res. Part C Emerg. Technol. doi: 10.1016/j.trc.2016.04.018 – volume: 50 start-page: 841 issue: 3 year: 2015 ident: 10.1016/j.trb.2019.02.015_bib0024 article-title: A railway timetable rescheduling approach for handling large-scale disruptions publication-title: Transp. Sci. doi: 10.1287/trsc.2015.0618 – volume: 67 start-page: 208 year: 2014 ident: 10.1016/j.trb.2019.02.015_bib0016 article-title: Simultaneous train rerouting and rescheduling on an n-track network: a model reformulation with network-based cumulative flow variables publication-title: Transp. Res. Part B Methodol. doi: 10.1016/j.trb.2014.05.005 |
SSID | ssj0003401 |
Score | 2.5628753 |
Snippet | •A new timetable rescheduling model is proposed, which includes flexible stopping and flexible short-turning as well as retiming, reordering, and cancelling... Railway operations are vulnerable to unexpected disruptions that should be handled in an efficient and passenger-friendly way. To this end, we propose a... |
SourceID | proquest crossref elsevier |
SourceType | Aggregation Database Enrichment Source Index Database Publisher |
StartPage | 149 |
SubjectTerms | Cycle time Disruption management Flexible short-turning Flexible stopping Integer programming Linear programming Mixed integer Passengers Railway stations Railways Rescheduling Time dependence Timetable rescheduling Timetables Travel demand |
Title | Railway timetable rescheduling with flexible stopping and flexible short-turning during disruptions |
URI | https://dx.doi.org/10.1016/j.trb.2019.02.015 https://www.proquest.com/docview/2226441007 |
Volume | 123 |
hasFullText | 1 |
inHoldings | 1 |
isFullTextHit | |
isPrint | |
link | http://utb.summon.serialssolutions.com/2.0.0/link/0/eLvHCXMwnV1BS8MwFA5jHtSD6FSczpGDJ6GuzVLTHsdwTMUd1MFuoWkTrYw6tg7x4m_3vTbVKbKDx6RJKC_pe99Lv_ceIWdGhUolXIBvoozDleJO5AexEwD0N4EQRnQx3vludDkc85uJP6mRfhULg7RKq_tLnV5oa9vTsdLszNK08wDgxGNokANQw0ERw8W5wFN-8fFN8-hy19Yk9BwcXf3ZLDhe-Vwhuyss0nZiZdy_bdMvLV2YnsEu2bGYkfbK19ojNZ01yGYVUrxokO2VrIL7JL6P0ulb9E6xbnyOoVEUfGrYnARZ508Ur16pwUSY-AgzC2DMFI2yZKX3GWC5A-YIr01oGctIk3QxX5YkmAMyHlw99oeOraXgxGBxcid2u9oPAEz4AgCIChDHxdCIuI5U5GnPixLjMmMYYC7GE3AbwXUFuAXuh1Hc7x6Sevaa6SNCMWkg0-hr8ZALESoBB0EDEHA1rMBUk7iVFGVsE41jvYuprBhlLxIEL1Hw0mUSBN8k519TZmWWjXWDebU18sdRkWAF1k1rVdso7Xe6kIwVgBCA0vH_Vj0hW9gqKZAtUs_nS30KMCVX7eIctslG7_p2OPoEWNLmwQ |
linkProvider | Elsevier |
linkToHtml | http://utb.summon.serialssolutions.com/2.0.0/link/0/eLvHCXMwnV1LT8MwDLam7TA4IJ7iMSAHTkjV2iyl3XGamDb2OMAm7RY1bQJDaExbJ8S_x27TaSDEgWOTJqqc1P6c2J8BboxqKpWIAH0TZRyhlHAiP4ydEKG_CYPABA3Kdx6O7roT8TD1pyVoF7kwFFZpdX-u0zNtbVvqVpr1xWxWf0Jw4nEyyCGq4ZByuCrETuWXodLq9bujjUJuCNeWJfQcGlBcbmZhXulSUYBXM2PupOK4v5unH4o6sz6dfdizsJG18i87gJKeH0K1yCpeHcLuFrHgEcSP0eztI_pkVDo-pewohm41rk9CgefPjE5fmSEuTOoicgFKm2LRPNlqfUFk7qBFopMTlqczsmS2Wq7zOJhjmHTux-2uY8spODEandSJ3Yb2Q8QTfoAYRIUE5WJ8iISOVORpz4sS43JjOMIuLhL0HNF7RcSFHohRwm-cQHn-PtenwIg3kGtyt0RTBEFTBbgXNGIBV-MMXJ2BW0hRxpZrnEpevMkiqOxVouAlCV66XKLgz-B2M2SRE2389bIolkZ-2y0SDcFfw2rFMkr7q64k5xkmRKx0_r9Zr6HaHQ8HctAb9S9gh3ryiMgalNPlWl8iaknVld2VX0mE6XI |
openUrl | ctx_ver=Z39.88-2004&ctx_enc=info%3Aofi%2Fenc%3AUTF-8&rfr_id=info%3Asid%2Fsummon.serialssolutions.com&rft_val_fmt=info%3Aofi%2Ffmt%3Akev%3Amtx%3Ajournal&rft.genre=article&rft.atitle=Railway+timetable+rescheduling+with+flexible+stopping+and+flexible+short-turning+during+disruptions&rft.jtitle=Transportation+research.+Part+B%3A+methodological&rft.au=Zhu%2C+Yongqiu&rft.au=Goverde%2C+Rob+M.P.&rft.date=2019-05-01&rft.pub=Elsevier+Ltd&rft.issn=0191-2615&rft.eissn=1879-2367&rft.volume=123&rft.spage=149&rft.epage=181&rft_id=info:doi/10.1016%2Fj.trb.2019.02.015&rft.externalDocID=S0191261518303801 |
thumbnail_l | http://covers-cdn.summon.serialssolutions.com/index.aspx?isbn=/lc.gif&issn=0191-2615&client=summon |
thumbnail_m | http://covers-cdn.summon.serialssolutions.com/index.aspx?isbn=/mc.gif&issn=0191-2615&client=summon |
thumbnail_s | http://covers-cdn.summon.serialssolutions.com/index.aspx?isbn=/sc.gif&issn=0191-2615&client=summon |