Locomotive assignment problem: integrating the strategic, tactical and operational level aspects

Over the past couple of centuries, with the increase in the significance of the railways to the economy, the complexity of the railway network and consequently the decision making involved and the number of problems faced has only increased. Among the host of problems in railways management, one of...

Full description

Saved in:
Bibliographic Details
Published inAnnals of operations research Vol. 315; no. 2; pp. 867 - 898
Main Authors Premkumar, Prashant, Ram Kumar, P. N.
Format Journal Article
LanguageEnglish
Published New York Springer US 01.08.2022
Springer
Springer Nature B.V
Subjects
Online AccessGet full text

Cover

Loading…
Abstract Over the past couple of centuries, with the increase in the significance of the railways to the economy, the complexity of the railway network and consequently the decision making involved and the number of problems faced has only increased. Among the host of problems in railways management, one of the most important is the locomotive assignment problem (LAP). The LAP is as old as the railways itself. The objective of the LAP is to assign a fleet of locomotives at minimum cost to pre-scheduled trains subject to a host of constraints. Most of the models in literature either work on improving the efficiency of solving the LAP or attempt to solve the three levels of LAP separately. Our attempt in this paper is to arrive at a linear mathematical model that integrates the strategic, tactical and operational level aspects of the LAP. We also demonstrate that by the addition of a valid inequality, the lower bounds can be improved substantially resulting in a substantial reduction in solution times for the problem instances. Further, we develop a Dijkstra’s algorithm-based heuristic to test the problem instances and compare the solution times and quality of solutions. Finally, we develop a case based on Southern Zone of the Indian Railways and test the heuristic to solve the LAP for this zone.
AbstractList Over the past couple of centuries, with the increase in the significance of the railways to the economy, the complexity of the railway network and consequently the decision making involved and the number of problems faced has only increased. Among the host of problems in railways management, one of the most important is the locomotive assignment problem (LAP). The LAP is as old as the railways itself. The objective of the LAP is to assign a fleet of locomotives at minimum cost to pre-scheduled trains subject to a host of constraints. Most of the models in literature either work on improving the efficiency of solving the LAP or attempt to solve the three levels of LAP separately. Our attempt in this paper is to arrive at a linear mathematical model that integrates the strategic, tactical and operational level aspects of the LAP. We also demonstrate that by the addition of a valid inequality, the lower bounds can be improved substantially resulting in a substantial reduction in solution times for the problem instances. Further, we develop a Dijkstra’s algorithm-based heuristic to test the problem instances and compare the solution times and quality of solutions. Finally, we develop a case based on Southern Zone of the Indian Railways and test the heuristic to solve the LAP for this zone.
Audience Academic
Author Premkumar, Prashant
Ram Kumar, P. N.
Author_xml – sequence: 1
  givenname: Prashant
  orcidid: 0000-0002-9410-178X
  surname: Premkumar
  fullname: Premkumar, Prashant
  email: ppknair24@gmail.com
  organization: Quantitative Methods and Operations Management, IIM Kozhikode
– sequence: 2
  givenname: P. N.
  surname: Ram Kumar
  fullname: Ram Kumar, P. N.
  organization: Quantitative Methods and Operations Management, IIM Kozhikode
BookMark eNp9kU9r3DAQxUVJoZu0X6AnQ69xMpIsy-othP4JLPTSnlVZHjsKtrT1aAP99tFmS9uUEnQQM7yfNPPeKTuJKSJjbzlccAB9SRwabWoQUINsha7lC7bhSovaSNmdsA0I1dRKSnjFTonuAIDzTm3Y923yaUk53GPliMIUF4y52q2pn3F5X4WYcVpdDnGq8i1WlEuBU_DnVXY-B-_mysWhSjs8qFIs9Yz3WLq0Q5_pNXs5upnwza_7jH37-OHr9ed6--XTzfXVtvaNkLlWrkFAOZhOacMbLlA5M7RCGBgb0UrsNJQG75UxrR48b6Xue1DDCHxE2coz9u74bhn9xx4p27u0X8s4ZIUGLoUQZf3fqsnNaEMcU9nHL4G8vdJcatPo5qC6-I-qnAGX4IvzYyj9J8D5X0C_pxCxmBmLn7eZJrcneioXR7lfE9GKo92tYXHrT8vBHvK0xzxtydM-5mkPUPcP5EN-tLwMF-bnUXlEqfwTJ1z_ePMM9QCchbVC
CitedBy_id crossref_primary_10_1016_j_jrtpm_2024_100466
Cites_doi 10.1287/opre.49.4.531.11226
10.1057/palgrave.jors.2601210
10.3923/itj.2013.2153.2159
10.1016/j.trb.2005.05.005
10.1016/S0191-2615(00)00022-9
10.1016/S0377-2217(96)00198-1
10.2307/2583842
10.1007/s10479-017-2740-8
10.1287/trsc.1050.0115
10.1287/trsc.1080.0248
10.1007/s10479-018-2933-9
10.1016/0191-2615(80)90036-3
10.1016/j.jrtpm.2018.02.001
10.1023/A:1018988203220
10.1287/trsc.37.2.183.15251
10.1016/j.tre.2015.07.003
10.1057/jors.1995.13
10.1111/itor.12062
10.1287/mnsc.45.8.1156
10.1155/2015/583909
10.1057/palgrave.jors.2600802
10.1057/jors.1980.170
10.1590/S0101-74382010000200013
10.1186/2251-712X-8-9
10.1057/jors.1989.23
10.1287/trsc.1080.0244
10.1016/j.asoc.2009.06.004
ContentType Journal Article
Copyright Springer Science+Business Media, LLC, part of Springer Nature 2020
COPYRIGHT 2022 Springer
Springer Science+Business Media, LLC, part of Springer Nature 2020.
Copyright_xml – notice: Springer Science+Business Media, LLC, part of Springer Nature 2020
– notice: COPYRIGHT 2022 Springer
– notice: Springer Science+Business Media, LLC, part of Springer Nature 2020.
DBID AAYXX
CITATION
N95
3V.
7TA
7TB
7WY
7WZ
7XB
87Z
88I
8AL
8AO
8FD
8FE
8FG
8FK
8FL
ABJCF
ABUWG
AFKRA
ARAPS
AZQEC
BENPR
BEZIV
BGLVJ
CCPQU
DWQXO
FR3
FRNLG
F~G
GNUQQ
HCIFZ
JG9
JQ2
K60
K6~
K7-
KR7
L.-
L6V
M0C
M0N
M2P
M7S
P5Z
P62
PHGZM
PHGZT
PKEHL
PQBIZ
PQBZA
PQEST
PQGLB
PQQKQ
PQUKI
PTHSS
Q9U
DOI 10.1007/s10479-020-03627-3
DatabaseName CrossRef
Gale Business: Insights
ProQuest Central (Corporate)
Materials Business File
Mechanical & Transportation Engineering Abstracts
ABI/INFORM Collection
ABI/INFORM Global (PDF only)
ProQuest Central (purchase pre-March 2016)
ABI/INFORM Collection
Science Database (Alumni Edition)
Computing Database (Alumni Edition)
ProQuest Pharma Collection
Technology Research Database
ProQuest SciTech Collection
ProQuest Technology Collection
ProQuest Central (Alumni) (purchase pre-March 2016)
ABI/INFORM Collection (Alumni Edition)
Materials Science & Engineering Collection
ProQuest Central (Alumni)
ProQuest Central UK/Ireland
ProQuest Advanced Technologies & Aerospace Collection
ProQuest Central Essentials
ProQuest Central
Business Premium Collection
Technology Collection
ProQuest One
ProQuest Central Korea
Engineering Research Database
Business Premium Collection (Alumni)
ABI/INFORM Global (Corporate)
ProQuest Central Student
SciTech Premium Collection
Materials Research Database
ProQuest Computer Science Collection
ProQuest Business Collection (Alumni Edition)
ProQuest Business Collection
Computer Science Database
Civil Engineering Abstracts
ABI/INFORM Professional Advanced
ProQuest Engineering Collection
ABI/INFORM Global
Computing Database
Science Database (ProQuest)
Engineering Database (ProQuest)
Advanced Technologies & Aerospace Database
ProQuest Advanced Technologies & Aerospace Collection
ProQuest Central Premium
ProQuest One Academic
ProQuest One Academic Middle East (New)
ProQuest One Business (UW System Shared)
ProQuest One Business (Alumni)
ProQuest One Academic Eastern Edition (DO NOT USE)
ProQuest One Applied & Life Sciences
ProQuest One Academic
ProQuest One Academic UKI Edition
Engineering Collection
ProQuest Central Basic
DatabaseTitle CrossRef
Materials Research Database
ProQuest Business Collection (Alumni Edition)
Computer Science Database
ProQuest Central Student
ProQuest Advanced Technologies & Aerospace Collection
ProQuest Central Essentials
ProQuest Computer Science Collection
SciTech Premium Collection
ABI/INFORM Complete
Materials Business File
ProQuest One Applied & Life Sciences
ProQuest Central (New)
Engineering Collection
Advanced Technologies & Aerospace Collection
Business Premium Collection
ABI/INFORM Global
Engineering Database
ProQuest Science Journals (Alumni Edition)
ProQuest One Academic Eastern Edition
ProQuest Technology Collection
ProQuest Business Collection
ProQuest One Academic UKI Edition
Engineering Research Database
ProQuest One Academic
ProQuest One Academic (New)
ABI/INFORM Global (Corporate)
ProQuest One Business
Technology Collection
Technology Research Database
ProQuest One Academic Middle East (New)
Mechanical & Transportation Engineering Abstracts
ProQuest Central (Alumni Edition)
ProQuest One Community College
ProQuest Pharma Collection
ProQuest Central
ABI/INFORM Professional Advanced
ProQuest Engineering Collection
ProQuest Central Korea
ABI/INFORM Complete (Alumni Edition)
Civil Engineering Abstracts
ProQuest Computing
ABI/INFORM Global (Alumni Edition)
ProQuest Central Basic
ProQuest Science Journals
ProQuest Computing (Alumni Edition)
ProQuest SciTech Collection
Advanced Technologies & Aerospace Database
Materials Science & Engineering Collection
ProQuest One Business (Alumni)
ProQuest Central (Alumni)
Business Premium Collection (Alumni)
DatabaseTitleList Materials Research Database


Database_xml – sequence: 1
  dbid: 8FG
  name: ProQuest Technology Collection
  url: https://search.proquest.com/technologycollection1
  sourceTypes: Aggregation Database
DeliveryMethod fulltext_linktorsrc
Discipline Engineering
Computer Science
Business
EISSN 1572-9338
EndPage 898
ExternalDocumentID A713794743
10_1007_s10479_020_03627_3
GeographicLocations India
GeographicLocations_xml – name: India
GroupedDBID -4X
-57
-5G
-BR
-EM
-Y2
-~C
-~X
.4S
.86
.DC
.VR
06D
0R~
0VY
1N0
1SB
2.D
203
23M
28-
2J2
2JN
2JY
2KG
2KM
2LR
2P1
2VQ
2~H
30V
3V.
4.4
406
408
409
40D
40E
5GY
5QI
5VS
67Z
6NX
7WY
88I
8AO
8FE
8FG
8FL
8TC
8VB
95-
95.
95~
96X
AAAVM
AABHQ
AACDK
AAHNG
AAIAL
AAJBT
AAJKR
AANZL
AARHV
AARTL
AASML
AATNV
AATVU
AAUYE
AAWCG
AAYIU
AAYQN
AAYTO
AAYZH
ABAKF
ABBBX
ABBXA
ABDZT
ABECU
ABFTV
ABHLI
ABHQN
ABJCF
ABJNI
ABJOX
ABKCH
ABKTR
ABMNI
ABMQK
ABNWP
ABQBU
ABQSL
ABSXP
ABTEG
ABTHY
ABTKH
ABTMW
ABULA
ABUWG
ABWNU
ABXPI
ACAOD
ACBXY
ACDTI
ACGFS
ACGOD
ACHSB
ACHXU
ACIWK
ACKNC
ACMDZ
ACMLO
ACOKC
ACOMO
ACPIV
ACZOJ
ADHHG
ADHIR
ADIMF
ADINQ
ADKNI
ADKPE
ADRFC
ADTPH
ADURQ
ADYFF
ADZKW
AEBTG
AEFIE
AEFQL
AEGAL
AEGNC
AEJHL
AEJRE
AEKMD
AEMSY
AENEX
AEOHA
AEPYU
AESKC
AETLH
AEVLU
AEXYK
AFBBN
AFEXP
AFGCZ
AFKRA
AFLOW
AFQWF
AFWTZ
AFZKB
AGAYW
AGDGC
AGGDS
AGJBK
AGMZJ
AGQEE
AGQMX
AGRTI
AGWIL
AGWZB
AGYKE
AHAVH
AHBYD
AHKAY
AHQJS
AHSBF
AHYZX
AIAKS
AIGIU
AIIXL
AILAN
AITGF
AJBLW
AJRNO
AJZVZ
AKVCP
ALMA_UNASSIGNED_HOLDINGS
ALWAN
AMKLP
AMXSW
AMYLF
AMYQR
AOCGG
ARAPS
ARCSS
ARMRJ
ASPBG
AVWKF
AXYYD
AYQZM
AZFZN
AZQEC
B-.
BA0
BAPOH
BBWZM
BDATZ
BENPR
BEZIV
BGLVJ
BGNMA
BPHCQ
BSONS
CAG
CCPQU
COF
CS3
CSCUP
DDRTE
DL5
DNIVK
DPUIP
DWQXO
EBLON
EBO
EBS
EBU
EDO
EIOEI
EJD
ESBYG
FEDTE
FERAY
FFXSO
FIGPU
FINBP
FNLPD
FRNLG
FRRFC
FSGXE
FWDCC
GGCAI
GGRSB
GJIRD
GNUQQ
GNWQR
GQ6
GQ7
GQ8
GROUPED_ABI_INFORM_COMPLETE
GROUPED_ABI_INFORM_RESEARCH
GXS
H13
HCIFZ
HF~
HG5
HG6
HMJXF
HQYDN
HRMNR
HVGLF
HZ~
I-F
I09
IAO
IEA
IHE
IJ-
IKXTQ
ITC
ITM
IWAJR
IXC
IZIGR
IZQ
I~X
I~Z
J-C
J0Z
JBSCW
JCJTX
JZLTJ
K1G
K60
K6V
K6~
K7-
KDC
KOV
KOW
L6V
LAK
LLZTM
M0C
M0N
M2P
M4Y
M7S
MA-
N2Q
N95
N9A
NB0
NDZJH
NPVJJ
NQJWS
NU0
O9-
O93
O9G
O9I
O9J
OAM
OVD
P19
P2P
P62
P9M
PF0
PQBIZ
PQBZA
PQQKQ
PROAC
PT4
PT5
PTHSS
Q2X
QOK
QOS
QWB
R4E
R89
R9I
RHV
RNI
RNS
ROL
RPX
RSV
RZC
RZD
RZK
S16
S1Z
S26
S27
S28
S3B
SAP
SBE
SCF
SCLPG
SDH
SDM
SHX
SISQX
SJYHP
SNE
SNPRN
SNX
SOHCF
SOJ
SPISZ
SRMVM
SSLCW
STPWE
SZN
T13
T16
TEORI
TH9
TSG
TSK
TSV
TUC
TUS
U2A
UG4
UOJIU
UTJUX
UZXMN
VC2
VFIZW
W23
W48
WK8
YLTOR
Z45
Z5O
Z7R
Z7S
Z7U
Z7V
Z7W
Z7X
Z7Y
Z7Z
Z81
Z83
Z88
Z8N
Z8U
Z92
ZL0
ZMTXR
ZYFGU
~8M
~A9
~EX
AAPKM
AAYXX
ABBRH
ABDBE
ABFSG
ACSTC
ADHKG
ADKFA
AEZWR
AFDZB
AFHIU
AFOHR
AGQPQ
AHPBZ
AHWEU
AIXLP
AMVHM
ATHPR
AYFIA
CITATION
ICD
PHGZM
PHGZT
AEIIB
PMFND
7TA
7TB
7XB
8AL
8FD
8FK
ABRTQ
FR3
JG9
JQ2
KR7
L.-
PKEHL
PQEST
PQGLB
PQUKI
Q9U
ID FETCH-LOGICAL-c423t-5a4e0e3d985791412e5a9d62290f4263e870a9d1b59967dc1637bb05df01fe363
IEDL.DBID U2A
ISSN 0254-5330
IngestDate Fri Jul 25 19:45:17 EDT 2025
Tue Jun 17 22:10:02 EDT 2025
Tue Jun 10 21:04:16 EDT 2025
Fri Jun 27 03:28:51 EDT 2025
Tue Jul 01 01:20:08 EDT 2025
Thu Apr 24 23:00:16 EDT 2025
Fri Feb 21 02:45:53 EST 2025
IsPeerReviewed true
IsScholarly true
Issue 2
Keywords Lower bounds
Routing
Mixed integer programming
Scheduling
Locomotive assignment problem
Dijkstra’s algorithm
Language English
LinkModel DirectLink
MergedId FETCHMERGED-LOGICAL-c423t-5a4e0e3d985791412e5a9d62290f4263e870a9d1b59967dc1637bb05df01fe363
Notes ObjectType-Article-1
SourceType-Scholarly Journals-1
ObjectType-Feature-2
content type line 14
ORCID 0000-0002-9410-178X
PQID 2701322253
PQPubID 25585
PageCount 32
ParticipantIDs proquest_journals_2701322253
gale_infotracmisc_A713794743
gale_infotracacademiconefile_A713794743
gale_businessinsightsgauss_A713794743
crossref_primary_10_1007_s10479_020_03627_3
crossref_citationtrail_10_1007_s10479_020_03627_3
springer_journals_10_1007_s10479_020_03627_3
ProviderPackageCode CITATION
AAYXX
PublicationCentury 2000
PublicationDate 20220800
2022-08-00
20220801
PublicationDateYYYYMMDD 2022-08-01
PublicationDate_xml – month: 8
  year: 2022
  text: 20220800
PublicationDecade 2020
PublicationPlace New York
PublicationPlace_xml – name: New York
PublicationTitle Annals of operations research
PublicationTitleAbbrev Ann Oper Res
PublicationYear 2022
Publisher Springer US
Springer
Springer Nature B.V
Publisher_xml – name: Springer US
– name: Springer
– name: Springer Nature B.V
References Assad (CR4) 1980; 14
Al-Amin, Forbes, Noble (CR3) 1999; 50
Yakıcı, Dell, Hartman, McLemore (CR37) 2018; 264
Noori, Ghannadpour (CR27) 2012; 8
Vaidyanathan, Ahuja, Orlin (CR35) 2008; 42
CR19
Rouillon, Desaulniers, Soumis (CR32) 2006; 40
CR18
Booler (CR7) 1995; 46
Cordeau, Desaulniers, Lingaya, Soumis, Desrosiers (CR9) 2001; 35
CR11
Lidén, Kalinowski, Waterer (CR21) 2018; 8
CR31
CR30
Ghoseiri, Ghannadpour (CR15) 2010; 10
Cordeau, Soumis, Desrosiers (CR10) 2001; 49
Ziarati, Chizari, Nezhad (CR38) 2005; 29
Noble, Al-Amin, Mills (CR26) 2001; 52
Wright (CR36) 1989; 40
CR2
Booler (CR6) 1980; 31
CR5
Ziarati, Soumis, Desrosiers, Gélinas, Saintonge (CR39) 1997; 97
Florian, Bushell, Ferland, Guerin, Nastansky (CR12) 1976; 14
Booler (CR8) 1995; 46
Ziarati, Soumis, Desrosiers, Solomon (CR40) 1999; 45
Lübbecke, Zimmermann (CR24) 2003; 37
Ahuja, Liu, Orlin, Sharma, Shughart (CR1) 2005; 39
CR23
Teichmann, Dorda, Golc, Binová (CR34) 2015; 2015
CR22
CR20
Maywald, Reiman, Overstreet, Johnson (CR25) 2019; 274
Fugenschuh, Homfeld, Huck, Martin, Yuan (CR13) 2008; 42
Ghannadpour, Zarrabi (CR14) 2017; 5
Piu, Kumar, Bierlaire, Speranza (CR28) 2015; 82
Sabino, Leal, Stützle, Birattari (CR33) 2010; 30
Gopalan, Talluri (CR16) 1998; 76
Iie Zhang, Ge, Wang (CR17) 2013; 12
Piu, Speranza (CR29) 2014; 21
K Ghoseiri (3627_CR15) 2010; 10
3627_CR19
A Fugenschuh (3627_CR13) 2008; 42
3627_CR18
ME Lübbecke (3627_CR24) 2003; 37
3627_CR11
JA Sabino (3627_CR33) 2010; 30
3627_CR31
D Teichmann (3627_CR34) 2015; 2015
S Noori (3627_CR27) 2012; 8
3627_CR30
JMP Booler (3627_CR6) 1980; 31
K Ziarati (3627_CR40) 1999; 45
B Vaidyanathan (3627_CR35) 2008; 42
M Al-Amin (3627_CR3) 1999; 50
JMP Booler (3627_CR7) 1995; 46
F Piu (3627_CR29) 2014; 21
J-F Cordeau (3627_CR9) 2001; 35
DH Noble (3627_CR26) 2001; 52
SN Iie Zhang (3627_CR17) 2013; 12
JD Maywald (3627_CR25) 2019; 274
J-F Cordeau (3627_CR10) 2001; 49
SF Ghannadpour (3627_CR14) 2017; 5
3627_CR22
K Ziarati (3627_CR39) 1997; 97
3627_CR23
3627_CR20
T Lidén (3627_CR21) 2018; 8
F Piu (3627_CR28) 2015; 82
M Florian (3627_CR12) 1976; 14
MB Wright (3627_CR36) 1989; 40
K Ziarati (3627_CR38) 2005; 29
JMP Booler (3627_CR8) 1995; 46
S Rouillon (3627_CR32) 2006; 40
E Yakıcı (3627_CR37) 2018; 264
AA Assad (3627_CR4) 1980; 14
RK Ahuja (3627_CR1) 2005; 39
R Gopalan (3627_CR16) 1998; 76
3627_CR5
3627_CR2
References_xml – ident: CR22
– volume: 49
  start-page: 531
  issue: 4
  year: 2001
  end-page: 548
  ident: CR10
  article-title: Simultaneous assignment of locomotives and cars to passenger trains
  publication-title: Operations Research
  doi: 10.1287/opre.49.4.531.11226
– ident: CR18
– volume: 52
  start-page: 1191
  issue: 11
  year: 2001
  end-page: 1200
  ident: CR26
  article-title: Production of locomotive rosters for a multi-class multi-locomotive problem
  publication-title: Journal of the Operational Research Society
  doi: 10.1057/palgrave.jors.2601210
– ident: CR2
– volume: 12
  start-page: 2153
  issue: 11
  year: 2013
  end-page: 2159
  ident: CR17
  article-title: A two-stage heuristic algorithm for locomotive scheduling
  publication-title: Information Technology Journal
  doi: 10.3923/itj.2013.2153.2159
– volume: 40
  start-page: 404
  issue: 5
  year: 2006
  end-page: 423
  ident: CR32
  article-title: An extended branch-and-bound method for locomotive assignment
  publication-title: Transportation Research Part B: Methodological
  doi: 10.1016/j.trb.2005.05.005
– ident: CR30
– volume: 35
  start-page: 767
  issue: 8
  year: 2001
  end-page: 787
  ident: CR9
  article-title: Simultaneous locomotive and car assignment at VIA Rail Canada
  publication-title: Transportation Research Part B: Methodological
  doi: 10.1016/S0191-2615(00)00022-9
– volume: 97
  start-page: 281
  issue: 2
  year: 1997
  end-page: 292
  ident: CR39
  article-title: Locomotive assignment with heterogeneous consists at CN North America
  publication-title: European Journal of Operational Research
  doi: 10.1016/S0377-2217(96)00198-1
– volume: 29
  start-page: 93
  issue: B1
  year: 2005
  end-page: 105
  ident: CR38
  article-title: Locomotive optimization using artificial intelligence approach
  publication-title: Iranian Journal of Science & Technology, Transaction B, Engineering
– volume: 46
  start-page: 123
  issue: 1
  year: 1995
  end-page: 127
  ident: CR8
  article-title: A Note on the Use of Lagrangean Relaxation in Railway Scheduling
  publication-title: The Journal of the Operational Research Society
  doi: 10.2307/2583842
– volume: 264
  start-page: 477
  issue: 1–2
  year: 2018
  end-page: 498
  ident: CR37
  article-title: Daily aircraft routing for amphibious ready groups
  publication-title: Annals of Operations Research
  doi: 10.1007/s10479-017-2740-8
– volume: 39
  start-page: 503
  issue: 4
  year: 2005
  end-page: 517
  ident: CR1
  article-title: Solving real-life locomotive-scheduling problems
  publication-title: Transportation Science
  doi: 10.1287/trsc.1050.0115
– volume: 42
  start-page: 478
  issue: 4
  year: 2008
  end-page: 491
  ident: CR13
  article-title: Scheduling locomotives and car transfers in freight transport
  publication-title: Transportation Science
  doi: 10.1287/trsc.1080.0248
– volume: 274
  start-page: 425
  issue: 1–2
  year: 2019
  end-page: 445
  ident: CR25
  article-title: Aircraft selection modeling: A multi-step heuristic to enumerate airlift alternatives
  publication-title: Annals of Operations Research
  doi: 10.1007/s10479-018-2933-9
– volume: 14
  start-page: 101
  issue: 1
  year: 1980
  end-page: 114
  ident: CR4
  article-title: Modelling of rail networks: Toward a routing/makeup model
  publication-title: Transportation Research Part B: Methodological
  doi: 10.1016/0191-2615(80)90036-3
– ident: CR23
– volume: 14
  start-page: 121
  issue: 2
  year: 1976
  end-page: 138
  ident: CR12
  article-title: The engine scheduling problem in a railway network
  publication-title: INFOR: Information Systems and Operational Research
– volume: 5
  start-page: 119
  issue: 2
  year: 2017
  end-page: 136
  ident: CR14
  article-title: The special application of vehicle routing problem with uncertainty travel times: Locomotive routing problem
  publication-title: International Journal of Transportation Engineereing
– ident: CR19
– volume: 8
  start-page: 1
  issue: 1
  year: 2018
  end-page: 15
  ident: CR21
  article-title: Resource considerations for integrated planning of railway traffic and maintenance windows
  publication-title: Journal of Rail Transport Planning and Management
  doi: 10.1016/j.jrtpm.2018.02.001
– volume: 76
  start-page: 155
  year: 1998
  end-page: 185
  ident: CR16
  article-title: Mathematical models in airline schedule planning: A survey
  publication-title: Annals of Operations Research
  doi: 10.1023/A:1018988203220
– volume: 37
  start-page: 183
  issue: 2
  year: 2003
  end-page: 197
  ident: CR24
  article-title: Engine routing and scheduling at industrial in-plant railroads
  publication-title: Transportation Science
  doi: 10.1287/trsc.37.2.183.15251
– volume: 82
  start-page: 217
  year: 2015
  end-page: 237
  ident: CR28
  article-title: Introducing a preliminary consists selection in the locomotive assignment problem
  publication-title: Transportation Research Part E: Logistics and Transportation Review
  doi: 10.1016/j.tre.2015.07.003
– ident: CR31
– ident: CR11
– volume: 46
  start-page: 123
  issue: 1
  year: 1995
  end-page: 127
  ident: CR7
  article-title: A note on the use of Lagrangean relaxation in railway scheduling
  publication-title: Journal of the Operational Research Society
  doi: 10.1057/jors.1995.13
– volume: 21
  start-page: 327
  issue: 3
  year: 2014
  end-page: 352
  ident: CR29
  article-title: The locomotive assignment problem: A survey on optimization models
  publication-title: International Transactions in Operational Research
  doi: 10.1111/itor.12062
– volume: 45
  start-page: 1156
  issue: 8
  year: 1999
  end-page: 1168
  ident: CR40
  article-title: A branch-first, cut-second approach for locomotive assignment
  publication-title: Management Science
  doi: 10.1287/mnsc.45.8.1156
– ident: CR5
– volume: 2015
  start-page: 7
  year: 2015
  ident: CR34
  article-title: Locomotive assignment problem with heterogeneous vehicle fleet and hiring external locomotives
  publication-title: Mathematical Problems in Engineering
  doi: 10.1155/2015/583909
– volume: 50
  start-page: 1004
  issue: 10
  year: 1999
  end-page: 1010
  ident: CR3
  article-title: Production of locomotive rosters for a multi-class single-locomotive problem
  publication-title: Journal of the Operational Research Society
  doi: 10.1057/palgrave.jors.2600802
– volume: 31
  start-page: 943
  issue: 10
  year: 1980
  end-page: 948
  ident: CR6
  article-title: The solution of a railway locomotive scheduling problem
  publication-title: Journal of the Operational Research Society
  doi: 10.1057/jors.1980.170
– volume: 30
  start-page: 486
  issue: 2
  year: 2010
  end-page: 514
  ident: CR33
  article-title: A multi-objective ant colony optimization method applied to switch engine scheduling in railroad yards
  publication-title: Pesquisa Operacional
  doi: 10.1590/S0101-74382010000200013
– volume: 8
  start-page: 1
  issue: 1
  year: 2012
  end-page: 13
  ident: CR27
  article-title: Locomotive assignment problem with train precedence using genetic algorithm
  publication-title: Journal of Industrial Engineering International
  doi: 10.1186/2251-712X-8-9
– volume: 40
  start-page: 187
  issue: 2
  year: 1989
  end-page: 192
  ident: CR36
  article-title: Applying stochastic algorithms to a locomotive scheduling problem
  publication-title: Journal of the Operational Research Society
  doi: 10.1057/jors.1989.23
– ident: CR20
– volume: 42
  start-page: 492
  issue: 4
  year: 2008
  end-page: 507
  ident: CR35
  article-title: The locomotive routing problem
  publication-title: Transportation Science
  doi: 10.1287/trsc.1080.0244
– volume: 10
  start-page: 53
  issue: 1
  year: 2010
  end-page: 65
  ident: CR15
  article-title: A hybrid genetic algorithm for multi-depot homogenous locomotive assignment with time windows
  publication-title: Applied Soft Computing
  doi: 10.1016/j.asoc.2009.06.004
– volume: 42
  start-page: 492
  issue: 4
  year: 2008
  ident: 3627_CR35
  publication-title: Transportation Science
  doi: 10.1287/trsc.1080.0244
– ident: 3627_CR30
– volume: 30
  start-page: 486
  issue: 2
  year: 2010
  ident: 3627_CR33
  publication-title: Pesquisa Operacional
  doi: 10.1590/S0101-74382010000200013
– ident: 3627_CR22
– ident: 3627_CR5
– volume: 12
  start-page: 2153
  issue: 11
  year: 2013
  ident: 3627_CR17
  publication-title: Information Technology Journal
  doi: 10.3923/itj.2013.2153.2159
– volume: 10
  start-page: 53
  issue: 1
  year: 2010
  ident: 3627_CR15
  publication-title: Applied Soft Computing
  doi: 10.1016/j.asoc.2009.06.004
– volume: 46
  start-page: 123
  issue: 1
  year: 1995
  ident: 3627_CR8
  publication-title: The Journal of the Operational Research Society
  doi: 10.2307/2583842
– volume: 29
  start-page: 93
  issue: B1
  year: 2005
  ident: 3627_CR38
  publication-title: Iranian Journal of Science & Technology, Transaction B, Engineering
– volume: 39
  start-page: 503
  issue: 4
  year: 2005
  ident: 3627_CR1
  publication-title: Transportation Science
  doi: 10.1287/trsc.1050.0115
– ident: 3627_CR2
– ident: 3627_CR11
– volume: 14
  start-page: 101
  issue: 1
  year: 1980
  ident: 3627_CR4
  publication-title: Transportation Research Part B: Methodological
  doi: 10.1016/0191-2615(80)90036-3
– volume: 5
  start-page: 119
  issue: 2
  year: 2017
  ident: 3627_CR14
  publication-title: International Journal of Transportation Engineereing
– ident: 3627_CR19
– ident: 3627_CR20
– volume: 31
  start-page: 943
  issue: 10
  year: 1980
  ident: 3627_CR6
  publication-title: Journal of the Operational Research Society
  doi: 10.1057/jors.1980.170
– volume: 14
  start-page: 121
  issue: 2
  year: 1976
  ident: 3627_CR12
  publication-title: INFOR: Information Systems and Operational Research
– volume: 8
  start-page: 1
  issue: 1
  year: 2018
  ident: 3627_CR21
  publication-title: Journal of Rail Transport Planning and Management
  doi: 10.1016/j.jrtpm.2018.02.001
– volume: 40
  start-page: 187
  issue: 2
  year: 1989
  ident: 3627_CR36
  publication-title: Journal of the Operational Research Society
  doi: 10.1057/jors.1989.23
– volume: 82
  start-page: 217
  year: 2015
  ident: 3627_CR28
  publication-title: Transportation Research Part E: Logistics and Transportation Review
  doi: 10.1016/j.tre.2015.07.003
– ident: 3627_CR23
– ident: 3627_CR31
– volume: 40
  start-page: 404
  issue: 5
  year: 2006
  ident: 3627_CR32
  publication-title: Transportation Research Part B: Methodological
  doi: 10.1016/j.trb.2005.05.005
– volume: 52
  start-page: 1191
  issue: 11
  year: 2001
  ident: 3627_CR26
  publication-title: Journal of the Operational Research Society
  doi: 10.1057/palgrave.jors.2601210
– volume: 37
  start-page: 183
  issue: 2
  year: 2003
  ident: 3627_CR24
  publication-title: Transportation Science
  doi: 10.1287/trsc.37.2.183.15251
– volume: 35
  start-page: 767
  issue: 8
  year: 2001
  ident: 3627_CR9
  publication-title: Transportation Research Part B: Methodological
  doi: 10.1016/S0191-2615(00)00022-9
– volume: 49
  start-page: 531
  issue: 4
  year: 2001
  ident: 3627_CR10
  publication-title: Operations Research
  doi: 10.1287/opre.49.4.531.11226
– volume: 2015
  start-page: 7
  year: 2015
  ident: 3627_CR34
  publication-title: Mathematical Problems in Engineering
  doi: 10.1155/2015/583909
– volume: 97
  start-page: 281
  issue: 2
  year: 1997
  ident: 3627_CR39
  publication-title: European Journal of Operational Research
  doi: 10.1016/S0377-2217(96)00198-1
– volume: 274
  start-page: 425
  issue: 1–2
  year: 2019
  ident: 3627_CR25
  publication-title: Annals of Operations Research
  doi: 10.1007/s10479-018-2933-9
– volume: 264
  start-page: 477
  issue: 1–2
  year: 2018
  ident: 3627_CR37
  publication-title: Annals of Operations Research
  doi: 10.1007/s10479-017-2740-8
– ident: 3627_CR18
– volume: 8
  start-page: 1
  issue: 1
  year: 2012
  ident: 3627_CR27
  publication-title: Journal of Industrial Engineering International
  doi: 10.1186/2251-712X-8-9
– volume: 50
  start-page: 1004
  issue: 10
  year: 1999
  ident: 3627_CR3
  publication-title: Journal of the Operational Research Society
  doi: 10.1057/palgrave.jors.2600802
– volume: 42
  start-page: 478
  issue: 4
  year: 2008
  ident: 3627_CR13
  publication-title: Transportation Science
  doi: 10.1287/trsc.1080.0248
– volume: 76
  start-page: 155
  year: 1998
  ident: 3627_CR16
  publication-title: Annals of Operations Research
  doi: 10.1023/A:1018988203220
– volume: 21
  start-page: 327
  issue: 3
  year: 2014
  ident: 3627_CR29
  publication-title: International Transactions in Operational Research
  doi: 10.1111/itor.12062
– volume: 46
  start-page: 123
  issue: 1
  year: 1995
  ident: 3627_CR7
  publication-title: Journal of the Operational Research Society
  doi: 10.1057/jors.1995.13
– volume: 45
  start-page: 1156
  issue: 8
  year: 1999
  ident: 3627_CR40
  publication-title: Management Science
  doi: 10.1287/mnsc.45.8.1156
SSID ssj0001185
Score 2.3708425
Snippet Over the past couple of centuries, with the increase in the significance of the railways to the economy, the complexity of the railway network and consequently...
SourceID proquest
gale
crossref
springer
SourceType Aggregation Database
Enrichment Source
Index Database
Publisher
StartPage 867
SubjectTerms Algorithms
Analysis
Assignment problem
Business and Management
Combinatorics
Constraint modelling
Decision making
Heuristic
Locomotives
Lower bounds
Management
Methods
Minimum cost
Operations research
Operations Research/Decision Theory
Production management
Rail transportation
Railroads
Railway networks
Railways
S.I. : Business Analytics and Operations Research
Theory of Computation
Trains
SummonAdditionalLinks – databaseName: ProQuest Central
  dbid: BENPR
  link: http://utb.summon.serialssolutions.com/2.0.0/link/0/eLvHCXMwfV1Lb9QwEB7BVkJwKLBQsaUgH0AcqEUeTmJzQS1qVSGoEKJSbyaxxxVStbs02_7-znidbhdELzkkE-cxD4_HM98AvEGtTRYKLVsTCqlUyGSLqGVdeO07WkIH5Djkt-P66ER9Oa1OU8CtT2mVg02MhtrPHMfIPxTNclegKj_N_0juGsW7q6mFxn3YIBOs9Qg29g-Ov_-4scXkPsckRloGSc6jTGUzqXhONUby8omtOKna2tT0t4H-Z6c0TkCHT2AzeY5ib8nqp3APp2N4MCSuj-Hx0KBBJH0dw6NbaIPP4NfXmYu5d1coyGX-fRYTAURqKfNRDMgRRCzILRR9Aq51u2IRS6no6e3Ui9kcL1IIUZxzzhGNxvWa_XM4OTz4-flIpgYL0pEXtZBVqzDD0htdNSZXeYFVa3zNEPCBgdyRlJlO5B1juDTeke_WdF1W-ZDlAcu63ILRdDbFFyB0aAKGovXKVUo1aGrlXInGuCwneSgnkA__1rqEPs5NMM7tCjeZ-WGJHzbyw9I972_umS-xN-6kfssss6l5Jx16Dm_0Z-1l39s9WoyT6SF_aQLvIh0rML2Ba1MdAn0HQ2GtUe6sUZLiufXLg3DYpPi9XYnpBHYHgVld_v_rb9892kt4WHDhRUw93IHR4uISX5E7tOheJ5m_BgUSBNw
  priority: 102
  providerName: ProQuest
Title Locomotive assignment problem: integrating the strategic, tactical and operational level aspects
URI https://link.springer.com/article/10.1007/s10479-020-03627-3
https://www.proquest.com/docview/2701322253
Volume 315
hasFullText 1
inHoldings 1
isFullTextHit
isPrint
link http://utb.summon.serialssolutions.com/2.0.0/link/0/eLvHCXMwlV1LTxsxEB7xkKpyaCEtKi2NfGjVQ7G0D-_DvSVVAoISVVUj0ZO76x2jSihBbOD3d8bxAukDictaWo_3NZ7ZGXvmG4B3WJY6ckkpK-0SqZSLZIVYyjxpyqYmF9ohr0OeTvKjqTo-y85CUljbRbt3W5JeU99LdlOFluzusNYl0ViHzYx8dw7kmiaDW_1LJrMPXCTXR3LsZEiV-fc1Vn5Hfyrlv3ZH_U9nvA3PgrUoBkv27sAaznrwpAtW78HzriiDCDLag617CIMv4OeXufXxdjcoyEz-de43_0UoI_NJdGgRRCzIFBRtAKu1B2Lh06fo7tWsEfNLvArLhuKC44zoapyj2b6E6Xj0_fORDEUVpCXLaSGzSmGEaaPLrNCxihPMKt3kDPvuGLwdSYDpRFwzbkvRWLLXirqOssZFscM0T3dhYzaf4SsQpSscuqRqlM2UKlDnytoUtbZRTHMg3YO4-7bGBsRxLnxxYe6wkpkfhvhhPD8Mjfl4O-ZyibfxIPV7ZpkJBTvp0PKSRnteXbetGZADTuqGbKQ9-ODpWGjpCWwVcg_oPRj-aoVyf4WShM2udneTwwRhb01SLDesMuo-6CbMXff_H__148jfwNOEky98-OE-bCyurvEtmUSLug_r5fiwD5uD8XA44fbwx8mI2uFo8vVb38vHb-jFBg0
linkProvider Springer Nature
linkToHtml http://utb.summon.serialssolutions.com/2.0.0/link/0/eLvHCXMwtV1Lb9QwEB6VIvE4FFhALC3gAxUHapE4zsNICFXAsqXbnlqpNzfxo0KqdpdmC-JP9Td2xut0WRC99ZJDMnEeM56HPfMNwGtXVSrxouK18oJL6RNeO1fxQtjKNhhCe0frkHv7xfBQfjvKj1bgoquFobTKTicGRW0nhtbI34lyviuQZx-nPzh1jaLd1a6Fxlwsdt3vXxiytR92PiN_N4UYfDn4NOSxqwA36DrMeF5Ll7jMqiovVSpT4fJa2YJwzz2hlzuUYDyRNgRcUlqDDkvZNElufZJ6lxUZjnsLbssMLTlVpg--Xml-dNZDyiQGXZyyNmORTizVk6XiFKyRzcCJvWQI_zYH_-zLBnM3eAhr0U9l23PBegQrbtyDO12afA8edO0gWNQOPbj_B7bhYzgeTUzI9PvpGDro309C2gGLDWzesw6nAokZOqGsjTC5ZovNQuEWPr0eWzaZurO4YMlOKcMJR6Pq0PYJHN7Ij38Kq-PJ2D0DVvnSOy9qK00uZelUIY3JnFImSVH6sj6k3b_VJmKdU8uNU71AaSZ-aOSHDvzQeM_bq3umc6SPa6k3iWU6tgrFQ0uLKe1Jfd62ehtDf1R06J314U2gI3WBb2DqWPWA30HAW0uUG0uUOM3N8uVOOHRUM61eTIo-bHUCs7j8_9d_fv1or-Du8GBvpEc7-7vrcE9QyUdIetyA1dnZuXuBjtiseRmkn8HxTU-3S1UNPrY
linkToPdf http://utb.summon.serialssolutions.com/2.0.0/link/0/eLvHCXMwtV3dT9swED-xIqHtYR_d0LqxzQ9DexgWiePE8SSE2KCCwSo0DYk3kzg2QkJtIWXT_jX-Ou5Sh66bxhsvfWgubpr7tu9-B_De5bmOvMh5ob3gUvqIF87lPBNVXpWYQntH-5DfBtnukfx6nB4vwHXbC0Nlla1NbAx1NbK0R74u1PRUIE3WfSiLONzub44vOE2QopPWdpzGVET23e9fmL7VG3vbyOtVIfo7P77s8jBhgFsMIyY8LaSLXFLpPFU6lrFwaaGrjDDQPSGZO5Rm_CIuCcREVRaDF1WWUVr5KPYuyRJc9wEsKsqKOrD4eWdw-P3WD2Do3hRQYgrGqYYztOyExj2pNKfUjTwIqvmcW_zbOfxzSts4v_5TeByiVrY1FbNnsOCGXVhqi-a78KQdDsGCrejCoz-QDp_DycHINnV_Px3DcP3stClCYGGczSfWolYgMcOQlNUBNNeusUnTxoW_XgwrNhq7y7B9yc6p3glXo17R-gUc3curX4bOcDR0L4HlXnnnRVFJm0qpnM6ktYnT2kYxymLSg7h9t8YG5HMawHFuZpjNxA-D_DANPwze8_H2nvEU9-NO6lVimQmDQ_Gjpq2V-rS4qmuzpeIEzR7Gaj340NCR8cAnsEXogcD_QTBcc5Qrc5So9Hb-ciscJhid2sxUpAdrrcDMLv__8V_dvdo7WEJVMwd7g_3X8FBQ_0dTAbkCncnllXuDUdmkfBvEn8HJfWvcDd4iREg
openUrl ctx_ver=Z39.88-2004&ctx_enc=info%3Aofi%2Fenc%3AUTF-8&rfr_id=info%3Asid%2Fsummon.serialssolutions.com&rft_val_fmt=info%3Aofi%2Ffmt%3Akev%3Amtx%3Ajournal&rft.genre=article&rft.atitle=Locomotive+assignment+problem%3A+integrating+the+strategic%2C+tactical+and+operational+level+aspects&rft.jtitle=Annals+of+operations+research&rft.au=Premkumar%2C+Prashant&rft.au=Ram%C2%A0Kumar%2C+P.+N.&rft.date=2022-08-01&rft.issn=0254-5330&rft.eissn=1572-9338&rft.volume=315&rft.issue=2&rft.spage=867&rft.epage=898&rft_id=info:doi/10.1007%2Fs10479-020-03627-3&rft.externalDBID=n%2Fa&rft.externalDocID=10_1007_s10479_020_03627_3
thumbnail_l http://covers-cdn.summon.serialssolutions.com/index.aspx?isbn=/lc.gif&issn=0254-5330&client=summon
thumbnail_m http://covers-cdn.summon.serialssolutions.com/index.aspx?isbn=/mc.gif&issn=0254-5330&client=summon
thumbnail_s http://covers-cdn.summon.serialssolutions.com/index.aspx?isbn=/sc.gif&issn=0254-5330&client=summon