Sahu, S. N., Gajpal, Y., & Debbarma, S. (2018). Two-agent-based single-machine scheduling with switchover time to minimize total weighted completion time and makespan objectives. Annals of operations research, 269(1-2), 623-640. https://doi.org/10.1007/s10479-017-2515-2
Chicago Style (17th ed.) CitationSahu, Shesh Narayan, Yuvraj Gajpal, and Swapan Debbarma. "Two-agent-based Single-machine Scheduling with Switchover Time to Minimize Total Weighted Completion Time and Makespan Objectives." Annals of Operations Research 269, no. 1-2 (2018): 623-640. https://doi.org/10.1007/s10479-017-2515-2.
MLA (9th ed.) CitationSahu, Shesh Narayan, et al. "Two-agent-based Single-machine Scheduling with Switchover Time to Minimize Total Weighted Completion Time and Makespan Objectives." Annals of Operations Research, vol. 269, no. 1-2, 2018, pp. 623-640, https://doi.org/10.1007/s10479-017-2515-2.