Fathollahzadeh, K., Mardaneh, E., Cigla, M., & Asad, M. W. A. (2021). A mathematical model for open pit mine production scheduling with Grade Engineering® and stockpiling. International journal of mining science and technology, 31(4), 717-728. https://doi.org/10.1016/j.ijmst.2021.03.011
Chicago Style (17th ed.) CitationFathollahzadeh, Karo, Elham Mardaneh, Mehmet Cigla, and Mohammad Waqar Ali Asad. "A Mathematical Model for Open Pit Mine Production Scheduling with Grade Engineering® and Stockpiling." International Journal of Mining Science and Technology 31, no. 4 (2021): 717-728. https://doi.org/10.1016/j.ijmst.2021.03.011.
MLA (9th ed.) CitationFathollahzadeh, Karo, et al. "A Mathematical Model for Open Pit Mine Production Scheduling with Grade Engineering® and Stockpiling." International Journal of Mining Science and Technology, vol. 31, no. 4, 2021, pp. 717-728, https://doi.org/10.1016/j.ijmst.2021.03.011.