APA (7th ed.) Citation

Cheng, Q., Liu, C., Chu, H., Liu, Z., Zhang, W., & Pan, J. (2020). A New Multi-Objective Hybrid Flow Shop Scheduling Method to Fully Utilize the Residual Forging Heat. IEEE access, 8, 1. https://doi.org/10.1109/ACCESS.2020.3017239

Chicago Style (17th ed.) Citation

Cheng, Qiang, Chenfei Liu, Hongyan Chu, Zhifeng Liu, Wei Zhang, and Junjie Pan. "A New Multi-Objective Hybrid Flow Shop Scheduling Method to Fully Utilize the Residual Forging Heat." IEEE Access 8 (2020): 1. https://doi.org/10.1109/ACCESS.2020.3017239.

MLA (9th ed.) Citation

Cheng, Qiang, et al. "A New Multi-Objective Hybrid Flow Shop Scheduling Method to Fully Utilize the Residual Forging Heat." IEEE Access, vol. 8, 2020, p. 1, https://doi.org/10.1109/ACCESS.2020.3017239.

Warning: These citations may not always be 100% accurate.