On-line scheduling in a surface treatment system
A real-time scheduling algorithm which guarantees an optimal completion time to each job which arrives at a line of chemical tanks for a surface treatment purpose is proposed. We first consider the case when the treatment periods are much greater than the transportation times, which allows us to neg...
Saved in:
Published in | European journal of operational research Vol. 120; no. 2; pp. 382 - 392 |
---|---|
Main Authors | , , , |
Format | Journal Article |
Language | English |
Published |
Amsterdam
Elsevier B.V
16.01.2000
Elsevier Elsevier Sequoia S.A |
Series | European Journal of Operational Research |
Subjects | |
Online Access | Get full text |
Cover
Loading…
Abstract | A real-time scheduling algorithm which guarantees an optimal completion time to each job which arrives at a line of chemical tanks for a surface treatment purpose is proposed. We first consider the case when the treatment periods are much greater than the transportation times, which allows us to neglect these times. We then extend our approach to the case when transportation times cannot be neglected. Some numerical examples are provided to illustrate this approach. |
---|---|
AbstractList | A real-time scheduling algorithm which guarantees an optimal completion time to each job which arrives at a line of chemical tanks for a surface treatment purpose is proposed. We first consider the case when the treatment periods are much greater than the transportation times, which allows us to neglect these times. We then extend our approach to the case when transportation times cannot be neglected. Some numerical examples are provided to illustrate this approach. A real-time scheduling algorithm which guarantees an optimal completion time to each job which arrives at a line of chemical tanks for a surface treatment purpose is proposed. The case when the treatment periods are much greater than the transportation times, which allows these times to be neglected, is considered. The approach is then extended to the case when transportation times cannot be neglected. Some numerical examples are provided to illustrate the approach. |
Author | Levner, Eugene Chauvet, Fabrice Proth, Jean-Marie Meyzin, Leonid K. |
Author_xml | – sequence: 1 givenname: Fabrice surname: Chauvet fullname: Chauvet, Fabrice organization: INRIA-Lorraine, Technopôle Metz 2000, 4 rue Marconi, 57070 Metz, France – sequence: 2 givenname: Eugene surname: Levner fullname: Levner, Eugene organization: Center for Technological Education Holon, 52 Golomb St., 58102 Holon, Israel – sequence: 3 givenname: Leonid K. surname: Meyzin fullname: Meyzin, Leonid K. organization: Center for Technological Education Holon, 52 Golomb St., 58102 Holon, Israel – sequence: 4 givenname: Jean-Marie surname: Proth fullname: Proth, Jean-Marie organization: INRIA-Lorraine, Technopôle Metz 2000, 4 rue Marconi, 57070 Metz, France |
BackLink | http://econpapers.repec.org/article/eeeejores/v_3a120_3ay_3a2000_3ai_3a2_3ap_3a382-392.htm$$DView record in RePEc |
BookMark | eNqFUF1LwzAUDaLgNv0JQvFJH6o3Sdu0TyLDLxzsQX0OaXrjMtYPk3awf2-2yl4NnNwTOOfemzMlp03bICFXFO4o0Oz-A7gQMWNU3BT5LYRXFrMTMqG5YHGWZ3BKJkfJOZl6vwYAmtJ0QmDZxBvbYOT1Cqsh0O_INpGK_OCM0hj1DlVfY9NHfud7rC_ImVEbj5d_dUa-np8-56_xYvnyNn9cxDoB1scKTQKa8zzLjWCFYEqVyKqySgRwLExJKVZcADNZ2JBimhapoSCULhNR6YTPyPXYt3Ptz4C-l-t2cE0YKRkkNCl4DkGUjiLtWu8dGtk5Wyu3kxTkPht5yEbuPy6LXB6ykSz43kefww710YThrFuHXm4lV5RBuHcBLMQVit3TgC6A54EVTK76OnR7GLthyGNr0UmvLTYaK-tQ97Jq7T_7_AI__4Ut |
CODEN | EJORDT |
CitedBy_id | crossref_primary_10_1016_j_ejor_2024_01_041 crossref_primary_10_1016_j_ejor_2007_09_048 crossref_primary_10_1016_j_cor_2018_05_009 crossref_primary_10_1016_j_ejor_2014_06_047 crossref_primary_10_1109_TASE_2017_2749429 crossref_primary_10_1016_j_cor_2014_04_002 crossref_primary_10_1016_j_cie_2015_06_004 crossref_primary_10_3182_20140824_6_ZA_1003_01026 crossref_primary_10_1080_00207543_2010_519733 crossref_primary_10_1080_00207543_2023_2245919 crossref_primary_10_3182_20060517_3_FR_2903_00027 crossref_primary_10_1016_j_ejor_2005_06_078 crossref_primary_10_1016_j_cie_2023_109360 crossref_primary_10_2139_ssrn_4105670 crossref_primary_10_1016_j_arcontrol_2015_03_001 crossref_primary_10_1016_j_arcontrol_2007_03_005 crossref_primary_10_1088_1757_899X_612_4_042065 crossref_primary_10_1177_0959651818789754 |
Cites_doi | 10.1080/09537289408919468 10.1109/70.660860 10.1016/0272-6963(84)90030-5 10.1016/0305-0548(93)90102-O 10.1142/9789814354363_0011 10.1080/07408179308964280 10.1287/opre.25.1.45 10.1287/mnsc.37.5.587 10.1080/09537289308919454 10.1080/03155986.1997.11732338 10.1057/jors.1990.86 10.1023/A:1007930010707 10.1109/ETFA.1995.496800 10.1080/00207549408956949 10.1016/0360-8352(94)90234-8 10.1080/07408179408966593 |
ContentType | Journal Article |
Copyright | 2000 Elsevier Science B.V. Copyright Elsevier Sequoia S.A. Jan 16, 2000 |
Copyright_xml | – notice: 2000 Elsevier Science B.V. – notice: Copyright Elsevier Sequoia S.A. Jan 16, 2000 |
DBID | DKI X2L AAYXX CITATION 7SC 7TB 8FD FR3 JQ2 L7M L~C L~D |
DOI | 10.1016/S0377-2217(98)00376-2 |
DatabaseName | RePEc IDEAS RePEc CrossRef Computer and Information Systems Abstracts Mechanical & Transportation Engineering Abstracts Technology Research Database Engineering Research Database ProQuest Computer Science Collection Advanced Technologies Database with Aerospace Computer and Information Systems Abstracts Academic Computer and Information Systems Abstracts Professional |
DatabaseTitle | CrossRef Technology Research Database Computer and Information Systems Abstracts – Academic Mechanical & Transportation Engineering Abstracts ProQuest Computer Science Collection Computer and Information Systems Abstracts Engineering Research Database Advanced Technologies Database with Aerospace Computer and Information Systems Abstracts Professional |
DatabaseTitleList | Technology Research Database |
Database_xml | – sequence: 1 dbid: DKI name: RePEc IDEAS url: http://ideas.repec.org/ sourceTypes: Index Database |
DeliveryMethod | fulltext_linktorsrc |
Discipline | Engineering Computer Science Business |
EISSN | 1872-6860 |
EndPage | 392 |
ExternalDocumentID | 50962357 10_1016_S0377_2217_98_00376_2 eeeejores_v_3a120_3ay_3a2000_3ai_3a2_3ap_3a382_392_htm S0377221798003762 |
Genre | Feature |
GroupedDBID | --K --M -~X .DC .~1 0R~ 1B1 1OL 1RT 1~. 1~5 29G 4.4 41~ 457 4G. 5GY 5VS 6OB 7-5 71M 8P~ 9JN 9JO AAAKF AAAKG AABNK AACTN AAEDT AAEDW AAIAV AAIKJ AAKOC AALRI AAOAW AAQFI AAQXK AARIN AAXUO AAYFN AAYOK ABAOU ABBOA ABFNM ABFRF ABJNI ABMAC ABUCO ABXDB ABYKQ ACAZW ACDAQ ACGFO ACGFS ACIWK ACNCT ACNNM ACRLP ACZNC ADBBV ADEZE ADGUI ADIYS ADJOM ADMUD AEBSH AEFWE AEKER AENEX AFFNX AFKWA AFTJW AGHFR AGUBO AGYEJ AHHHB AHZHX AI. AIALX AIEXJ AIGVJ AIKHN AITUG AJBFU AJOXV ALMA_UNASSIGNED_HOLDINGS AMFUW AMRAJ AOUOD APLSM ARUGR ASPBG AVWKF AXJTR AZFZN BKOJK BKOMP BLXMC CS3 DU5 EBS EFJIC EFLBG EJD EO8 EO9 EP2 EP3 F5P FDB FEDTE FGOYB FIRID FNPLU FYGXN G-Q GBLVA GBOLZ HAMUX HVGLF HZ~ IHE J1W KOM LY1 M41 MHUIS MO0 MS~ N9A O-L O9- OAUVE OZT P-8 P-9 P2P PC. PQQKQ Q38 R2- RIG ROL RPZ RXW SCC SDF SDG SDP SDS SES SEW SPC SPCBC SSB SSD SSV SSW SSZ T5K TAE TN5 U5U VH1 WUQ XPP ZMT ~02 ~G- 02 08R 0R 1 41 6XO 8P AAPBV ABFLS ADALY DKI G- HZ IPNFZ K M MS PQEST STF X X2L AAXKI AAYXX AFJKZ AKRWK CITATION 7SC 7TB 8FD FR3 JQ2 L7M L~C L~D |
ID | FETCH-LOGICAL-c402t-aef40c33868f72972aabe2dbd4703e9fb11ed3702f66861e5595f107acb47dc43 |
IEDL.DBID | .~1 |
ISSN | 0377-2217 |
IngestDate | Thu Oct 10 19:26:10 EDT 2024 Thu Sep 26 15:45:23 EDT 2024 Wed Aug 18 03:50:57 EDT 2021 Fri Feb 23 02:27:11 EST 2024 |
IsPeerReviewed | true |
IsScholarly | true |
Issue | 2 |
Keywords | Completion time optimization Surface treatment line Real-time scheduling algorithm |
Language | English |
LinkModel | DirectLink |
MergedId | FETCHMERGED-LOGICAL-c402t-aef40c33868f72972aabe2dbd4703e9fb11ed3702f66861e5595f107acb47dc43 |
PQID | 204149380 |
PQPubID | 45678 |
PageCount | 11 |
ParticipantIDs | proquest_journals_204149380 crossref_primary_10_1016_S0377_2217_98_00376_2 repec_primary_eeeejores_v_3a120_3ay_3a2000_3ai_3a2_3ap_3a382_392_htm elsevier_sciencedirect_doi_10_1016_S0377_2217_98_00376_2 |
PublicationCentury | 2000 |
PublicationDate | 2000-01-16 |
PublicationDateYYYYMMDD | 2000-01-16 |
PublicationDate_xml | – month: 01 year: 2000 text: 2000-01-16 day: 16 |
PublicationDecade | 2000 |
PublicationPlace | Amsterdam |
PublicationPlace_xml | – name: Amsterdam |
PublicationSeriesTitle | European Journal of Operational Research |
PublicationTitle | European journal of operational research |
PublicationYear | 2000 |
Publisher | Elsevier B.V Elsevier Elsevier Sequoia S.A |
Publisher_xml | – name: Elsevier B.V – name: Elsevier – name: Elsevier Sequoia S.A |
References | King, Hodgson, Chafee (BIB17) 1993; 25 Rachamadugu, Stecke (BIB14) 1994; 5 J.W. Herrman, C.-Y. Lee, J.L. Snowdon, “A classification of static scheduling problems”, in: Complexity in Numerical Optimization, P.M. Pardalos (Ed.), World Scientific Publishing Co., Singapore. 1993, pp. 203–253 Panwalkar, Iskander (BIB13) 1977; 25 Chen, Chu, Proth (BIB7) 1998; 14 Varnier, Bachelu, Baptiste (BIB8) 1987; 35 T.E. Morton, D.W. Pentico, Heuristic Scheduling Systems in Applications to Production Systems and Project Management, Wiley, New York, 1993 Park (BIB10) 1994; 27 Lei, Wang (BIB5) 1994; 26 Song, Zabinsky, Storch (BIB2) 1993; 4 W. Song, R.L. Storch, Z.B. Zabinsky, An example for scheduling a chemical processing tank line, Proceedings of the 1995 INRIA/IEEE Symposium on Emerging Technologies and Factory Automation, Paris, IEEE Computer Society Press, Los Alamitos. 1995, 1, pp. 475–482 Lei (BIB4) 1993; 20 Stern, Vitner (BIB12) 1990; 41 Chen, Chu, Proth (BIB6) 1997; 9 Yih (BIB9) 1994; 32 Aronson (BIB11) 1984; 4 Baker, K., Introduction of Sequencing and Scheduling, Wiley, New York, 1974 M. Matsuo, J.S. Shang, R.S. Sullivan, A crane scheduling problem in a computer integrated manufacturing environment, Management Science (5) (1991) pp. 587–606 Varnier (10.1016/S0377-2217(98)00376-2_BIB8) 1987; 35 Rachamadugu (10.1016/S0377-2217(98)00376-2_BIB14) 1994; 5 Park (10.1016/S0377-2217(98)00376-2_BIB10) 1994; 27 King (10.1016/S0377-2217(98)00376-2_BIB17) 1993; 25 10.1016/S0377-2217(98)00376-2_BIB1 Stern (10.1016/S0377-2217(98)00376-2_BIB12) 1990; 41 10.1016/S0377-2217(98)00376-2_BIB3 Yih (10.1016/S0377-2217(98)00376-2_BIB9) 1994; 32 Song (10.1016/S0377-2217(98)00376-2_BIB2) 1993; 4 Lei (10.1016/S0377-2217(98)00376-2_BIB5) 1994; 26 10.1016/S0377-2217(98)00376-2_BIB18 10.1016/S0377-2217(98)00376-2_BIB15 10.1016/S0377-2217(98)00376-2_BIB16 Panwalkar (10.1016/S0377-2217(98)00376-2_BIB13) 1977; 25 Lei (10.1016/S0377-2217(98)00376-2_BIB4) 1993; 20 Chen (10.1016/S0377-2217(98)00376-2_BIB6) 1997; 9 Chen (10.1016/S0377-2217(98)00376-2_BIB7) 1998; 14 Aronson (10.1016/S0377-2217(98)00376-2_BIB11) 1984; 4 |
References_xml | – volume: 27 start-page: 47 year: 1994 end-page: 50 ident: BIB10 article-title: Optimizing robot's service movement in a robot centered F.M.S publication-title: Computer and Industrial Engineering contributor: fullname: Park – volume: 4 start-page: 159 year: 1984 end-page: 173 ident: BIB11 article-title: Two heuristics for the deterministic single-operator multiple-machine multiple-run cyclic scheduling problem publication-title: Journal of Operations Management contributor: fullname: Aronson – volume: 14 start-page: 144 year: 1998 end-page: 152 ident: BIB7 article-title: Cyclic scheduling of a hoist with time windows constraints publication-title: IEEE Transactions on Robotics and Automation contributor: fullname: Proth – volume: 26 start-page: 25 year: 1994 end-page: 33 ident: BIB5 article-title: Determining optimal cyclic hoist schedules in a single-hoist electroplating line publication-title: IIE Transactions contributor: fullname: Wang – volume: 9 start-page: 81 year: 1997 end-page: 103 ident: BIB6 article-title: Sequencing of parts in robotic cells publication-title: International Journal of Flexible Manufacturing Systems contributor: fullname: Proth – volume: 20 start-page: 807 year: 1993 end-page: 816 ident: BIB4 article-title: Determining the optimal starting times in a cyclic schedule with a given route publication-title: Computers and Operational Research contributor: fullname: Lei – volume: 25 start-page: 80 year: 1993 end-page: 87 ident: BIB17 article-title: Robot task scheduling in a flexible manufacturing cell publication-title: IIE Transactions contributor: fullname: Chafee – volume: 35 start-page: 309 year: 1987 end-page: 324 ident: BIB8 article-title: Resolution of the cyclic multi-hoist scheduling problem with overlapping partitions publication-title: INFOR: Information Systems and Operational Research contributor: fullname: Baptiste – volume: 32 start-page: 501 year: 1994 end-page: 516 ident: BIB9 article-title: An algorithm for hoist scheduling problems publication-title: International Journal of Production Research contributor: fullname: Yih – volume: 4 start-page: 323 year: 1993 end-page: 332 ident: BIB2 article-title: An algorithm for scheduling a chemical processing tank line publication-title: Production Planning and Control contributor: fullname: Storch – volume: 41 start-page: 625 year: 1990 end-page: 632 ident: BIB12 article-title: Scheduling parts in a combined production-transportation work cell publication-title: Journal of the Operational Research Society contributor: fullname: Vitner – volume: 25 start-page: 45 year: 1977 end-page: 61 ident: BIB13 article-title: A survey of scheduling rules publication-title: Operations Research contributor: fullname: Iskander – volume: 5 start-page: 2 year: 1994 end-page: 20 ident: BIB14 article-title: Classification and review of FMS scheduling procedures publication-title: Production Planning and Control contributor: fullname: Stecke – ident: 10.1016/S0377-2217(98)00376-2_BIB1 – volume: 5 start-page: 2 issue: 1 year: 1994 ident: 10.1016/S0377-2217(98)00376-2_BIB14 article-title: Classification and review of FMS scheduling procedures publication-title: Production Planning and Control doi: 10.1080/09537289408919468 contributor: fullname: Rachamadugu – volume: 14 start-page: 144 issue: 1 year: 1998 ident: 10.1016/S0377-2217(98)00376-2_BIB7 article-title: Cyclic scheduling of a hoist with time windows constraints publication-title: IEEE Transactions on Robotics and Automation doi: 10.1109/70.660860 contributor: fullname: Chen – volume: 4 start-page: 159 issue: 2 year: 1984 ident: 10.1016/S0377-2217(98)00376-2_BIB11 article-title: Two heuristics for the deterministic single-operator multiple-machine multiple-run cyclic scheduling problem publication-title: Journal of Operations Management doi: 10.1016/0272-6963(84)90030-5 contributor: fullname: Aronson – volume: 20 start-page: 807 issue: 8 year: 1993 ident: 10.1016/S0377-2217(98)00376-2_BIB4 article-title: Determining the optimal starting times in a cyclic schedule with a given route publication-title: Computers and Operational Research doi: 10.1016/0305-0548(93)90102-O contributor: fullname: Lei – ident: 10.1016/S0377-2217(98)00376-2_BIB16 doi: 10.1142/9789814354363_0011 – volume: 25 start-page: 80 year: 1993 ident: 10.1016/S0377-2217(98)00376-2_BIB17 article-title: Robot task scheduling in a flexible manufacturing cell publication-title: IIE Transactions doi: 10.1080/07408179308964280 contributor: fullname: King – volume: 25 start-page: 45 year: 1977 ident: 10.1016/S0377-2217(98)00376-2_BIB13 article-title: A survey of scheduling rules publication-title: Operations Research doi: 10.1287/opre.25.1.45 contributor: fullname: Panwalkar – ident: 10.1016/S0377-2217(98)00376-2_BIB18 doi: 10.1287/mnsc.37.5.587 – volume: 4 start-page: 323 issue: 4 year: 1993 ident: 10.1016/S0377-2217(98)00376-2_BIB2 article-title: An algorithm for scheduling a chemical processing tank line publication-title: Production Planning and Control doi: 10.1080/09537289308919454 contributor: fullname: Song – volume: 35 start-page: 309 year: 1987 ident: 10.1016/S0377-2217(98)00376-2_BIB8 article-title: Resolution of the cyclic multi-hoist scheduling problem with overlapping partitions publication-title: INFOR: Information Systems and Operational Research doi: 10.1080/03155986.1997.11732338 contributor: fullname: Varnier – volume: 41 start-page: 625 year: 1990 ident: 10.1016/S0377-2217(98)00376-2_BIB12 article-title: Scheduling parts in a combined production-transportation work cell publication-title: Journal of the Operational Research Society doi: 10.1057/jors.1990.86 contributor: fullname: Stern – ident: 10.1016/S0377-2217(98)00376-2_BIB15 – volume: 9 start-page: 81 issue: 1 year: 1997 ident: 10.1016/S0377-2217(98)00376-2_BIB6 article-title: Sequencing of parts in robotic cells publication-title: International Journal of Flexible Manufacturing Systems doi: 10.1023/A:1007930010707 contributor: fullname: Chen – ident: 10.1016/S0377-2217(98)00376-2_BIB3 doi: 10.1109/ETFA.1995.496800 – volume: 32 start-page: 501 issue: 3 year: 1994 ident: 10.1016/S0377-2217(98)00376-2_BIB9 article-title: An algorithm for hoist scheduling problems publication-title: International Journal of Production Research doi: 10.1080/00207549408956949 contributor: fullname: Yih – volume: 27 start-page: 47 year: 1994 ident: 10.1016/S0377-2217(98)00376-2_BIB10 article-title: Optimizing robot's service movement in a robot centered F.M.S publication-title: Computer and Industrial Engineering doi: 10.1016/0360-8352(94)90234-8 contributor: fullname: Park – volume: 26 start-page: 25 issue: 2 year: 1994 ident: 10.1016/S0377-2217(98)00376-2_BIB5 article-title: Determining optimal cyclic hoist schedules in a single-hoist electroplating line publication-title: IIE Transactions doi: 10.1080/07408179408966593 contributor: fullname: Lei |
SSID | ssj0001515 |
Score | 1.8042556 |
Snippet | A real-time scheduling algorithm which guarantees an optimal completion time to each job which arrives at a line of chemical tanks for a surface treatment... |
SourceID | proquest crossref repec elsevier |
SourceType | Aggregation Database Index Database Publisher |
StartPage | 382 |
SubjectTerms | Algorithms Completion time optimization Operations research Optimization Production scheduling Protective coatings Real time Real-time scheduling algorithm Studies Surface treatment line |
Title | On-line scheduling in a surface treatment system |
URI | https://dx.doi.org/10.1016/S0377-2217(98)00376-2 http://econpapers.repec.org/article/eeeejores/v_3a120_3ay_3a2000_3ai_3a2_3ap_3a382-392.htm https://www.proquest.com/docview/204149380 |
Volume | 120 |
hasFullText | 1 |
inHoldings | 1 |
isFullTextHit | |
isPrint | |
link | http://utb.summon.serialssolutions.com/2.0.0/link/0/eLvHCXMwnV3dSxwxEB9EodiHtp6WnraSBx_0IV6Sze1mH0Urp1J9UMG3kE-8Qtfj7iz0xb-9k_3wzgcRDMxuNuyGMElm5sfOTAD2lC9yyYOgnEcEKJZFanwxpKUdOs-tE1GleOdfl_noVp7fDe9W4LiLhUlula3sb2R6La3blkHLzcFkPB5cswwtQ5ESbqUkKrUclqj-cE0fPi3cPJLCrv8kFAVNby-ieJoe6sb9Uh3UnVDxmn5asj_XpmES3JIaOv0Cn1r7kRw1Q9yAlVD14EPnvt6Dz90xDaTdtT34uJRzcBPYVUWTaUkQ1qKaSdHoZFwRQ2aP02hcIM-u56TJ8rwFt6c_b45HtD02gToEg3NqQpTMIfTMVUTTuRDG2CC89RJ3dyij5Tz4rGAi5rnKeUBMMYyIAo2zsvBOZl9htXqowjcgUgqDLdxJLGiLK-WF9HmWWeZ9lKEPhx2z9KTJjqEXbmPIXZ24q0ula-5q0QfVsVS_mGaNEvytT3e6KdDtPptpwSRCvEyxPpzUs_I8jIDl98M0zPRfnRkuGF7_IaXQJLyNUxVpgpQprJVC38__bL9_fDuw3oTpp4O3v8PqfPoYfqDBMre79YrchbWjs4vRJT6dXJz9Bygp494 |
link.rule.ids | 315,783,787,4016,4509,24128,27936,27937,45597,45691 |
linkProvider | Elsevier |
linkToHtml | http://utb.summon.serialssolutions.com/2.0.0/link/0/eLvHCXMwnV1LbxMxEB5FjUTLgUcoIhSoDxzg4Mb2OrveIypUgT44kEq9WX6qQWIT5YHEhd_OeB9NOFRIrORdy9q1rM_2zDfamTHAW-WLXPIgKOcRDRTLIjW-GNPSjp3n1omoUrzz5VU-uZZfbsY3PTjtYmGSW2Ur-xuZXkvrtmXUojlazGajbyxDZihSwq2URCXJ4b5M_BgX9cnvrZ9H0tj1r4SioOn1bRhP00Xd-K5U7-teqLhPQe0Q0P4yLILb0UNnT-BRSyDJh2aMT6EXqgE86PzXB_C4O6eBtNt2AA93kg4-A_a1oolbErRrUc-kcHQyq4ghq80yGhfIne85adI8H8L12afp6YS25yZQh9bgmpoQJXNoe-YqIncuhDE2CG-9xO0dymg5Dz4rmIh5rnIeELRxRDPQOCsL72T2HPaqeRVeAJFSGGzhTuKFZFwpL6TPs8wy76MMQzjpwNKLJj2G3vqNIbo6oatLpWt0tRiC6iDVf82zRhH-r0-PuinQ7UZbacEk2niZYkP4WM_K3TACXt_ny7DSP3VmuGB4_4UlxSbhY5aqWBZYMoW1Uujb9Y-X_z--Y9ifTC8v9MXnq_MjOGhi9tMp3K9gb73chNfIXtb2Tb06_wA7Q-R- |
openUrl | ctx_ver=Z39.88-2004&ctx_enc=info%3Aofi%2Fenc%3AUTF-8&rfr_id=info%3Asid%2Fsummon.serialssolutions.com&rft_val_fmt=info%3Aofi%2Ffmt%3Akev%3Amtx%3Ajournal&rft.genre=article&rft.atitle=On-line+scheduling+in+a+surface+treatment+system&rft.jtitle=European+journal+of+operational+research&rft.au=Chauvet%2C+Fabrice&rft.au=Levner%2C+Eugene&rft.au=Meyzin%2C+Leonid+K.&rft.au=Proth%2C+Jean-Marie&rft.date=2000-01-16&rft.issn=0377-2217&rft.volume=120&rft.issue=2&rft.spage=382&rft.epage=392&rft_id=info:doi/10.1016%2FS0377-2217%2898%2900376-2&rft.externalDBID=n%2Fa&rft.externalDocID=10_1016_S0377_2217_98_00376_2 |
thumbnail_l | http://covers-cdn.summon.serialssolutions.com/index.aspx?isbn=/lc.gif&issn=0377-2217&client=summon |
thumbnail_m | http://covers-cdn.summon.serialssolutions.com/index.aspx?isbn=/mc.gif&issn=0377-2217&client=summon |
thumbnail_s | http://covers-cdn.summon.serialssolutions.com/index.aspx?isbn=/sc.gif&issn=0377-2217&client=summon |