Estimation of project completion time using wiener random process and Bayesian structure based on expert's point of view

One of the important issues in project control is the estimation of project completion time. High accuracy in estimation can have a significant effect on project evaluation cost. Therefore, presenting a suitable method for estimation is essential. By definition, a project is a temporary work that is...

Full description

Saved in:
Bibliographic Details
Published inThe Journal of the Operational Research Society Vol. 70; no. 3; pp. 395 - 402
Main Authors Hajialinajar, M. T., Rahimi, H., Mosavi, M. R., Afandak, B.
Format Journal Article
LanguageEnglish
Published Taylor & Francis 04.03.2019
Taylor & Francis, Ltd
Subjects
Online AccessGet full text
ISSN0160-5682
1476-9360
DOI10.1080/01605682.2018.1441635

Cover

Abstract One of the important issues in project control is the estimation of project completion time. High accuracy in estimation can have a significant effect on project evaluation cost. Therefore, presenting a suitable method for estimation is essential. By definition, a project is a temporary work that is done just once in order to create a specific product or service. Therefore, the structure of a project (especially long term projects) has many uncertainties. Using the Wiener random process, with regard to the updating structure of its distribution based on expert's point of view and new observation data, is a studied subject in this paper. Finally, by applying the data of a real case study, the benefits of estimation method has been shown and its results have been studied.
AbstractList One of the important issues in project control is the estimation of project completion time. High accuracy in estimation can have a significant effect on project evaluation cost. Therefore, presenting a suitable method for estimation is essential. By definition, a project is a temporary work that is done just once in order to create a specific product or service. Therefore, the structure of a project (especially long term projects) has many uncertainties. Using the Wiener random process, with regard to the updating structure of its distribution based on expert's point of view and new observation data, is a studied subject in this paper. Finally, by applying the data of a real case study, the benefits of estimation method has been shown and its results have been studied.
Author Mosavi, M. R.
Hajialinajar, M. T.
Afandak, B.
Rahimi, H.
Author_xml – sequence: 1
  givenname: M. T.
  surname: Hajialinajar
  fullname: Hajialinajar, M. T.
  organization: Department of Industrial Engineering, Iran University of Science and Technology
– sequence: 2
  givenname: H.
  surname: Rahimi
  fullname: Rahimi, H.
  organization: Department of Industrial Engineering, Khaje Nasir Toosi University
– sequence: 3
  givenname: M. R.
  surname: Mosavi
  fullname: Mosavi, M. R.
  email: M_Mosavi@iust.ac.ir
  organization: Department of Electrical Engineering, Iran University of Science and Technology
– sequence: 4
  givenname: B.
  surname: Afandak
  fullname: Afandak, B.
  organization: Department of Industrial Engineering, Iran University of Science and Technology
BookMark eNqFkMtOwzAQRS0EEm3hE5C8Y5Vix0nsiA0PlYdUiQ2sI9cZI1epHdkubf8epwUWLGA1mrn3zmjOGB1bZwGhC0qmlAhyRWhFykrk05xQMaVFQStWHqERLXiV1awix2g0eLLBdIrGISwJITWh9QhtZyGalYzGWew07r1bgopYuVXfwX6aZMDrYOw73hiw4LGXtnWrwasgBJw6fCd3EIy0OES_VnHtAS9kgBanBbDtwcfLgHtnbByufBjYnKETLbsA5191gt4eZq_3T9n85fH5_naeKSbqmCnIgWkuSso1y5VuZd4CYSx9qBXUXEOxkKRQpeAEZNEWHCQDnidHLRRVbIKuD3uVdyF40I0ycf9v9NJ0DSXNALH5htgMEJsviCld_kr3PuHyu39zF4fcMkTnf0KF4JyJvEr6zUE3Vju_khvnu7aJctc5rxNfZULD_j7xCcr6l3o
CitedBy_id crossref_primary_10_1002_cjce_23666
Cites_doi 10.1016/j.ijproman.2013.12.005
10.1061/(ASCE)CO.1943-7862.0000192
10.1061/(ASCE)0733-9364(2004)130:1(25)
10.1007/978-3-662-06400-9
10.1016/j.sbspro.2013.03.027
10.1057/jors.2011.11
10.1016/j.ijproman.2012.10.006
10.1007/978-1-4419-1014-1
10.1016/j.ijproman.2005.10.004
10.1016/j.omega.2010.09.006
10.1057/palgrave.jors.2602296
10.1002/pmj.v44.1
10.1016/j.ejor.2012.10.030
ContentType Journal Article
Copyright Operational Research Society 2018 2018
Operational Research Society 2018
Copyright_xml – notice: Operational Research Society 2018 2018
– notice: Operational Research Society 2018
DBID AAYXX
CITATION
DOI 10.1080/01605682.2018.1441635
DatabaseName CrossRef
DatabaseTitle CrossRef
DatabaseTitleList

DeliveryMethod fulltext_linktorsrc
Discipline Engineering
Sciences (General)
Computer Science
Business
EISSN 1476-9360
EndPage 402
ExternalDocumentID 10_1080_01605682_2018_1441635
48773826
1441635
Genre Article
GroupedDBID -~X
.DC
0BK
0R~
29L
30N
3R3
4.4
5GY
7WY
8R4
8R5
AAJMT
AALDU
AAMIU
AAPUL
AAQRR
ABJNI
ABKVW
ABLIJ
ABLJU
ABMNI
ABPAQ
ABPPZ
ABXUL
ABXYU
ABYYQ
ACGFO
ACHQT
ACIWK
ACNCT
ACREN
ACTIO
ADEPB
ADFRT
ADGTB
ADMHG
ADNFJ
AEISY
AENEX
AEUPB
AEXYK
AEYOC
AFAIT
AFTQD
AGAYW
AGDLA
AHAJD
AHDZW
AJPNJ
AJRNO
AKBVH
AKOOK
ALIPV
ALMA_UNASSIGNED_HOLDINGS
ALQZU
AMTXH
AQRUH
AQSKT
ASPBG
AVWKF
AWYRJ
BLEHA
CBXGM
CCCUG
CCKSF
CS3
CSNOR
CYVLN
DGEBU
DU5
EBS
EJD
F5P
JAV
JST
KYCEM
LJTGL
M4Z
MS~
O9-
P2P
Q2X
RNANH
ROSJB
RPC
RSV
RTWRZ
SNX
SOJ
TBQAZ
TDBHL
TEN
TFL
TFT
TFW
TN5
TTHFI
TUROJ
U5U
VQA
WH7
XSW
ZGOLN
~02
AAGDL
AAHIA
ABBHK
ACXJH
ADGDI
ADYSH
AFRVT
AIYEW
AMPGV
IPSME
JBC
JENOY
JPL
JPPEU
SA0
AAYXX
CITATION
ID FETCH-LOGICAL-c389t-ce2e3f78517f32cfda2de033635fce97fe4ba04c5870ea4d47ea3e7233698c1c3
ISSN 0160-5682
IngestDate Tue Jul 01 04:24:29 EDT 2025
Thu Apr 24 22:55:18 EDT 2025
Thu May 29 08:48:35 EDT 2025
Wed Dec 25 09:08:05 EST 2024
IsPeerReviewed true
IsScholarly true
Issue 3
Language English
LinkModel OpenURL
MergedId FETCHMERGED-LOGICAL-c389t-ce2e3f78517f32cfda2de033635fce97fe4ba04c5870ea4d47ea3e7233698c1c3
PageCount 8
ParticipantIDs jstor_primary_48773826
informaworld_taylorfrancis_310_1080_01605682_2018_1441635
crossref_citationtrail_10_1080_01605682_2018_1441635
crossref_primary_10_1080_01605682_2018_1441635
ProviderPackageCode CITATION
AAYXX
PublicationCentury 2000
PublicationDate 2019-03-04
PublicationDateYYYYMMDD 2019-03-04
PublicationDate_xml – month: 03
  year: 2019
  text: 2019-03-04
  day: 04
PublicationDecade 2010
PublicationTitle The Journal of the Operational Research Society
PublicationYear 2019
Publisher Taylor & Francis
Taylor & Francis, Ltd
Publisher_xml – name: Taylor & Francis
– name: Taylor & Francis, Ltd
References Lipke W. (CIT0011) 2004; 1
CIT0010
CIT0001
Alshibani A. (CIT0002) 2012
CIT0003
CIT0014
CIT0013
CIT0005
CIT0016
CIT0004
CIT0015
CIT0018
CIT0006
CIT0017
Gaoini E. (CIT0008) 2009
CIT0009
CIT0019
References_xml – ident: CIT0013
  doi: 10.1016/j.ijproman.2013.12.005
– ident: CIT0010
  doi: 10.1061/(ASCE)CO.1943-7862.0000192
– ident: CIT0003
  doi: 10.1061/(ASCE)0733-9364(2004)130:1(25)
– ident: CIT0014
  doi: 10.1007/978-3-662-06400-9
– ident: CIT0001
  doi: 10.1016/j.sbspro.2013.03.027
– ident: CIT0009
  doi: 10.1057/jors.2011.11
– start-page: 545
  year: 2012
  ident: CIT0002
  publication-title: Construction Research Congress
– ident: CIT0006
  doi: 10.1016/j.ijproman.2012.10.006
– volume-title: Bayesian modeling of flash floods using generalized extreme value distribution with prior elicitation
  year: 2009
  ident: CIT0008
– ident: CIT0017
  doi: 10.1007/978-1-4419-1014-1
– ident: CIT0016
  doi: 10.1016/j.ijproman.2005.10.004
– ident: CIT0018
  doi: 10.1016/j.omega.2010.09.006
– ident: CIT0005
– ident: CIT0019
  doi: 10.1057/palgrave.jors.2602296
– ident: CIT0004
  doi: 10.1002/pmj.v44.1
– volume: 1
  start-page: 6
  year: 2004
  ident: CIT0011
  publication-title: The Measurable News
– ident: CIT0015
  doi: 10.1016/j.ejor.2012.10.030
SSID ssj0009019
Score 2.232581
Snippet One of the important issues in project control is the estimation of project completion time. High accuracy in estimation can have a significant effect on...
SourceID crossref
jstor
informaworld
SourceType Enrichment Source
Index Database
Publisher
StartPage 395
SubjectTerms Estimation of completion time
expert's point of view
ORIGINAL ARTICLES
uncertainty
Wiener random process
Title Estimation of project completion time using wiener random process and Bayesian structure based on expert's point of view
URI https://www.tandfonline.com/doi/abs/10.1080/01605682.2018.1441635
https://www.jstor.org/stable/48773826
Volume 70
hasFullText 1
inHoldings 1
isFullTextHit
isPrint
link http://utb.summon.serialssolutions.com/2.0.0/link/0/eLvHCXMwnV3NbtNAEF6FVkJwABqoKH_aAwdQZMvxrr32MYWiCCkgoVRUXCx7vSsSkTiq3Ur0xGvwVLwDT8Lsn-1ARSkXK1mtd23P553x7Mx8CD0vZTrmMiy8gErpUR5KrxCMeoIGZSQZl1K7smfv4ukxfXsSnQwGP3pRS2dN4fOLS_NK_keq0AZyVVmy15BsOyg0wG-QLxxBwnD8Jxkfwfu5am0-61QxUeJCtyrm-NFZbRyuqsD0CFRTWa1GG5MfoLcODvOvQqdSmlqyakdB6bZS7SNoAoDGRUSk9WhTLUzwQLulsOzw1rNulT37fiNOna_RRfi5MNFu5VvCc1qs86WJ9J75o7nfbT59XqwMrXbbNqvq_Hxhu35omydSuUT00n7o910ZKnuKeIZ82Hk348CLYsNG5AuzIlMWeykxpANuyTZcIxaapLf-EsPYaVU51cncf2oJG1YJs6nJVHxfoja5wTSNOrXoQgF-05ZtDOPYFVe1w2RqmMwOcwPthoypuIHdyfT1p49dHehAc820d-qSylS598uuZ8tc2iqmux1Aq82h-T10x0oaTwwo99BArIfopkujGKK7ji4EW-0xRLd7tS-HaM-21_iFLX3-8j666BCNK4ktonGHaKwQjTWisUE0NojGFtEY_mGHaNwiGmtEYxjAIPrnt-811lhW8ygsP0DHb47mr6aeZQfxOBjZjcdFKIhk8MXAJAm5LPOwFAEh8NAkFymTghZ5QHkEGknktKRM5ESwEHqkCR9zso921tVaPESYkYQWPJIyTwoK_RMqiijKgyCPQV2l_ABRJ4SM29L5isHlS_ZXEBwgvz1tY2rHXHVC2pdw1minnTQMOxm54tx9DYd2JpowuK8wfnTdq3iMbnUv5xO0A5IST8HybopnFs2_AH7W0as
linkProvider Library Specific Holdings
linkToHtml http://utb.summon.serialssolutions.com/2.0.0/link/0/eLvHCXMwpV1RT9wwDLYYSBs8jHEbGmwwP0za9tBbr0mu7SNMoGODewKJt6pN4wltuztB0dh-PXaasrtJiAcem8ZJUyeO49ifAd7XlA8sJVUUa6JI24SiyqU6cjquDaWWyJuyT8bD0Zn-em7O52JhxK1SztDUAkV4WS2LW4zRnUvcZ0FFM8NM4qgGmVxPslJhnsCKYd1dZrmKx_-Ad2Of3ENIIqHponjua2Zhf1pAL130WPT7z-E62O7LW7eTH_3rpurbv_-BOj5uaC_geVBPca-dTxuw5CY9eNp5x_dgvcsCgUEo9GBtDtKwBxuh_Ao_BkTrTy_h5oAFSRsjiVPCYP1B787ufKmkuEfp5Tv-vhA65D20nv7CWRvIgPyE--UfJzGf2ILeXl86lE24Rm7AZypoPlzhbHoxaaQXufN4BWeHB6dfRlFI-RBZ1pyayLrEKUpZDUxJJZbqMqldrBT_BLIuT8npqoy1NSxmXKlrnbpSuTThGnlmB1ZtwvJkOnGvAVOV6coaojKrNNfPtKuMKeO4HLIMyu0W6I7RhQ146JKW42cx6GBTAy8K4UUReLEF_TuyWQsI8hBBPj-LisZbYqhNm1KoB2g3_ZS764mPlzyuZLj9iEbfwbPR6clxcXw0_vYGVvlV7p3q9FtYZva5HdaymmrXL6Nb9egZUg
linkToPdf http://utb.summon.serialssolutions.com/2.0.0/link/0/eLvHCXMwpV3dT9RAEJ8oJkQeQE6JIOo8mKgPPXvd7dcjIBf8uvggiW9NdztjCHh34UpA_3pnt1vkTAwPPLbd2W0725nZ7W9-A_Cq4XJkOTFRrJkjbROODOU6Ih03KeeW2W9lf5lkR8f64_e0RxMuAqzSraG5I4rwttp93POGe0TcO0eKlmaFS6MaFe7vpMQU6X14kEl44lB9Kp785d2NfW0PJxI5mT6J53_dLLmnJfLSZcCidz_jDTD9jXeok9PhRWuG9vc_nI53erJHsB6CU9zrZtMm3KPpAFZ7bPwANvoaEBhMwgDWbhAaDmAznF_gm8Bn_fYxXB2KGekyJHHGGPZ-0IPZyZ91Be7RjfIDL0-cHIoHbWY_cd6lMaAc4X79i1zGJ3aUtxfnhM4FNygd-DoF7esFzmcn09aN4v54PIHj8eG3g6MoFHyIrMRNbWQpIcW5BIE5q8RyUycNxUrJS2BLZc6kTR1rm4qRoVo3OqdaUZ5Ii7KwI6u2YGU6m9JTwFwV2tiUuS6MlvaFJpOmdRzXmVig0m6D7vVc2cCG7opynFWjnjQ16KJyuqiCLrZheC027-hAbhMob06iqvX7MNwVTanULbJbfsZdjySLS3muJNu5Q6cvYfXr-3H1-cPk0zN4KFdKj6jTu7Ai2qPnEmK15oX_iP4AX-0X9g
openUrl ctx_ver=Z39.88-2004&ctx_enc=info%3Aofi%2Fenc%3AUTF-8&rfr_id=info%3Asid%2Fsummon.serialssolutions.com&rft_val_fmt=info%3Aofi%2Ffmt%3Akev%3Amtx%3Ajournal&rft.genre=article&rft.atitle=Estimation+of+project+completion+time+using+wiener+random+process+and+Bayesian+structure+based+on+expert%E2%80%99s+point+of+view&rft.jtitle=The+Journal+of+the+Operational+Research+Society&rft.au=Hajialinajar%2C+M.+T.&rft.au=Rahimi%2C+H.&rft.au=Mosavi%2C+M.+R.&rft.au=Afandak%2C+B.&rft.date=2019-03-04&rft.issn=0160-5682&rft.eissn=1476-9360&rft.volume=70&rft.issue=3&rft.spage=395&rft.epage=402&rft_id=info:doi/10.1080%2F01605682.2018.1441635&rft.externalDBID=n%2Fa&rft.externalDocID=10_1080_01605682_2018_1441635
thumbnail_l http://covers-cdn.summon.serialssolutions.com/index.aspx?isbn=/lc.gif&issn=0160-5682&client=summon
thumbnail_m http://covers-cdn.summon.serialssolutions.com/index.aspx?isbn=/mc.gif&issn=0160-5682&client=summon
thumbnail_s http://covers-cdn.summon.serialssolutions.com/index.aspx?isbn=/sc.gif&issn=0160-5682&client=summon