Hajialinajar, M. T., Rahimi, H., Mosavi, M. R., & Afandak, B. (2019). Estimation of project completion time using wiener random process and Bayesian structure based on expert's point of view. The Journal of the Operational Research Society, 70(3), 395-402. https://doi.org/10.1080/01605682.2018.1441635
Chicago Style (17th ed.) CitationHajialinajar, M. T., H. Rahimi, M. R. Mosavi, and B. Afandak. "Estimation of Project Completion Time Using Wiener Random Process and Bayesian Structure Based on Expert's Point of View." The Journal of the Operational Research Society 70, no. 3 (2019): 395-402. https://doi.org/10.1080/01605682.2018.1441635.
MLA (9th ed.) CitationHajialinajar, M. T., et al. "Estimation of Project Completion Time Using Wiener Random Process and Bayesian Structure Based on Expert's Point of View." The Journal of the Operational Research Society, vol. 70, no. 3, 2019, pp. 395-402, https://doi.org/10.1080/01605682.2018.1441635.