HIRFL-CSR complex

The construction and commissioning of HIRFL-CSR were finished in 2007. From 2000 to 2005 the subsystem and key devices of CSR were successfully fabricated, such as magnet, power supply, UHV system, e-cooler, electric-static deflector with the septum of 0.1 mm, and the fast-pulse kicker with the rise...

Full description

Saved in:
Bibliographic Details
Published inChinese physics C Vol. 33; no. 9; pp. 804 - 810
Main Author 夏佳文 詹文龙 魏宝文 原有进 袁平 乔为民 高大庆 杨晓天 满开第 肖国青 赵红卫 杨晓东 蔡晓红 宋明涛 徐瑚珊 马力祯 刘勇 何源 周忠祖 张玮 许哲 毛瑞士 张军辉 敬岚 杨雅清 杨建成 冒立军 陈又新
Format Journal Article
LanguageEnglish
Published IOP Publishing 01.09.2009
Institute of Modern Physics, Chinese Academy of Sciences, P.O. Box 31, Lanzhou 730000, China
Subjects
Online AccessGet full text
ISSN1674-1137
0254-3052
2058-6132
DOI10.1088/1674-1137/33/9/019

Cover

More Information
Summary:The construction and commissioning of HIRFL-CSR were finished in 2007. From 2000 to 2005 the subsystem and key devices of CSR were successfully fabricated, such as magnet, power supply, UHV system, e-cooler, electric-static deflector with the septum of 0.1 mm, and the fast-pulse kicker with the rise time of 150 ns. After that the CSR commissioning activities were performed in 2006 and 2007, including the accumulation of those heavy ions of C, Ar, Kr and Xe by the combination of stripping injection (STI) or multiple multi-turn injection (MMI) and e-cooling with a hollow e-beam, wide energy-range synchrotron ramping by changing the RF harmonic-number at mid-energy, the beam stacking in the experimental ring CSRe, the RIBs mass-measurement with the isochronous-mode in CSRe by using the time-of-flight method, and the ion beam slow-extraction from CSRm.
Bibliography:11-5641/O4
CSR, commissioning, heavy ion, e-cooling, accumulation
F270
TL56
ISSN:1674-1137
0254-3052
2058-6132
DOI:10.1088/1674-1137/33/9/019