Constraint programming models for integrated container terminal operations
•First Formulation of the Integrated Port Container Terminal Problem (IPCTP) under realistic constraints.•The IPCTP integrates the joint assignment and scheduling of quay cranes, yard cranes, and yard trucks.•Constraint Programming models are proposed to solve the IPCTP optimally or near optimally.•...
Saved in:
Published in | European journal of operational research Vol. 286; no. 3; pp. 945 - 962 |
---|---|
Main Authors | , , |
Format | Journal Article |
Language | English |
Published |
Elsevier B.V
01.11.2020
|
Subjects | |
Online Access | Get full text |
ISSN | 0377-2217 1872-6860 |
DOI | 10.1016/j.ejor.2020.04.025 |
Cover
Abstract | •First Formulation of the Integrated Port Container Terminal Problem (IPCTP) under realistic constraints.•The IPCTP integrates the joint assignment and scheduling of quay cranes, yard cranes, and yard trucks.•Constraint Programming models are proposed to solve the IPCTP optimally or near optimally.•A two-stage optimization approach is developed to increase solution quality for large IPCTP instances.•Performances of mixed-integer and constraint programming models are compared.
Although operations in container terminals are highly interdependent, they are traditionally optimized by decomposing the overall problem into a sequence of smaller sub-problems, each focusing on a single operation. Recent studies, however, have demonstrated the need and potential of optimizing these interdependent operations jointly. This paper proposes the Integrated Port Container Terminal Problem (IPCTP) that considers the joint optimization of quay crane assignment and scheduling, yard crane assignment and scheduling, yard location assignments, and yard truck assignment and scheduling. The IPCTP aims at minimizing the turnover times of the vessels and maximize terminal throughput. It also considers inbound and outbound containers simultaneously and models the safety distance and the interference constraints for the quay cranes. To solve the IPCTP, the paper proposes several constraint programming (CP) models. Computational results show that CP provides exact solutions in acceptable time to IPCTP instances derived from an actual (small) container terminal in Turkey. For hard IPCTP instances, the CP model can be generalized in a two-stage optimization approach to produce high-quality solutions in reasonable times. |
---|---|
AbstractList | •First Formulation of the Integrated Port Container Terminal Problem (IPCTP) under realistic constraints.•The IPCTP integrates the joint assignment and scheduling of quay cranes, yard cranes, and yard trucks.•Constraint Programming models are proposed to solve the IPCTP optimally or near optimally.•A two-stage optimization approach is developed to increase solution quality for large IPCTP instances.•Performances of mixed-integer and constraint programming models are compared.
Although operations in container terminals are highly interdependent, they are traditionally optimized by decomposing the overall problem into a sequence of smaller sub-problems, each focusing on a single operation. Recent studies, however, have demonstrated the need and potential of optimizing these interdependent operations jointly. This paper proposes the Integrated Port Container Terminal Problem (IPCTP) that considers the joint optimization of quay crane assignment and scheduling, yard crane assignment and scheduling, yard location assignments, and yard truck assignment and scheduling. The IPCTP aims at minimizing the turnover times of the vessels and maximize terminal throughput. It also considers inbound and outbound containers simultaneously and models the safety distance and the interference constraints for the quay cranes. To solve the IPCTP, the paper proposes several constraint programming (CP) models. Computational results show that CP provides exact solutions in acceptable time to IPCTP instances derived from an actual (small) container terminal in Turkey. For hard IPCTP instances, the CP model can be generalized in a two-stage optimization approach to produce high-quality solutions in reasonable times. |
Author | Hentenryck, Pascal Van Kizilay, Damla Eliiyi, Deniz T. |
Author_xml | – sequence: 1 givenname: Damla surname: Kizilay fullname: Kizilay, Damla email: damla.kizilay@idu.edu.tr organization: Department of Industrial Engineering, Izmir Democracy University, Izmir 35140, Turkey – sequence: 2 givenname: Pascal Van orcidid: 0000-0002-5024-6186 surname: Hentenryck fullname: Hentenryck, Pascal Van email: pascal.vanhentenryck@isye.gatech.edu organization: Milton Stewart School of Industrial and Systems Engineering, Georgia Institute of Technology, USA – sequence: 3 givenname: Deniz T. surname: Eliiyi fullname: Eliiyi, Deniz T. email: deniz.eliiyi@bakircay.edu.tr organization: Department of Industrial Engineering, Izmir Bakircay University, Izmir 35665, Turkey |
BookMark | eNp9kM9qwzAMh83oYG23F9gpL5BMdhI7hV1G2V8Ku2xn49hycUjiYpvB3n7uutMOPQmk3yekb0UWs5-RkFsKFQXK74YKBx8qBgwqaCpg7QVZ0k6wknccFmQJtRAlY1RckVWMAwDQlrZL8rb1c0xBuTkVh-D3QU2Tm_fF5A2OsbA-FHmEuZ_QFNrPKUcxFAlDzqmx8AfMM5e3XJNLq8aIN391TT6fHj-2L-Xu_fl1-7Ardc3bVDaaMyusFp2hfAMIG9SdEn2LvOdosUG0tldQ98JaA8Y0gnGzaY1VtO6Q12vSnfbq4GMMaKV26feE4x-jpCCPTuQgj07k0YmERmYnGWX_0ENwkwrf56H7E5SF4JfDIKN2OGs0LqBO0nh3Dv8Bfn-Aqw |
CitedBy_id | crossref_primary_10_1109_TASE_2024_3428392 crossref_primary_10_1177_03611981231168862 crossref_primary_10_3390_jmse12071190 crossref_primary_10_1016_j_aei_2025_103133 crossref_primary_10_1016_j_aei_2025_103210 crossref_primary_10_1016_j_trc_2023_104228 crossref_primary_10_1371_journal_pone_0251875 crossref_primary_10_1016_j_ocecoaman_2022_106417 crossref_primary_10_1016_j_ocecoaman_2023_106617 crossref_primary_10_3390_jmse10050675 crossref_primary_10_1016_j_cor_2021_105547 crossref_primary_10_3390_su15065536 crossref_primary_10_1016_j_cor_2023_106419 crossref_primary_10_3390_logistics8020059 crossref_primary_10_1016_j_ejor_2022_11_054 crossref_primary_10_1016_j_tre_2023_103034 crossref_primary_10_1080_00207543_2021_1902014 crossref_primary_10_1016_j_cor_2020_105069 crossref_primary_10_1016_j_trc_2023_104447 crossref_primary_10_1016_j_tre_2024_103608 crossref_primary_10_1016_j_cor_2025_106992 crossref_primary_10_1016_j_cor_2023_106472 crossref_primary_10_1016_j_ejor_2023_11_038 crossref_primary_10_2139_ssrn_4167731 crossref_primary_10_1038_s41598_025_91140_7 crossref_primary_10_1080_03088839_2021_2021596 crossref_primary_10_1016_j_cie_2023_109435 crossref_primary_10_1016_j_ejor_2023_10_013 crossref_primary_10_2139_ssrn_3532297 crossref_primary_10_1016_j_rtbm_2024_101107 crossref_primary_10_1109_TITS_2021_3083598 crossref_primary_10_1142_S021759592250004X crossref_primary_10_3390_jmse11050892 crossref_primary_10_1016_j_cie_2024_110300 crossref_primary_10_1016_j_cie_2021_107832 crossref_primary_10_3390_app10248887 crossref_primary_10_3390_jmse13010119 crossref_primary_10_2139_ssrn_4162474 crossref_primary_10_1080_0305215X_2024_2333400 crossref_primary_10_1016_j_aei_2021_101252 crossref_primary_10_1016_j_ocecoaman_2024_107481 crossref_primary_10_1057_s41278_022_00219_9 crossref_primary_10_1016_j_ejor_2022_07_042 crossref_primary_10_1080_00207543_2021_1989077 crossref_primary_10_1016_j_trb_2022_05_012 crossref_primary_10_1155_2021_5529914 crossref_primary_10_3390_jmse11081492 |
Cites_doi | 10.1002/nav.20121 10.1016/j.ejor.2006.06.033 10.1016/j.trb.2016.05.012 10.1016/j.retrec.2012.11.010 10.1016/j.trc.2015.09.002 10.1016/j.cam.2013.11.021 10.3328/TL.2012.04.03.143-152 10.1016/j.ejor.2012.09.019 10.1007/s10951-007-0029-5 10.1155/2013/746781 10.1016/j.cie.2014.06.018 10.1016/j.ijpe.2014.09.028 10.1016/j.ijpe.2007.05.015 10.1016/j.trc.2014.03.014 10.1016/S1007-0214(10)70089-4 10.1016/j.trb.2016.12.014 10.1016/j.cie.2016.01.010 10.1016/j.ejor.2013.08.050 10.1016/j.ejor.2014.12.030 10.1007/s11518-013-5210-0 10.1007/s10951-009-0105-0 10.1016/j.neucom.2014.12.125 |
ContentType | Journal Article |
Copyright | 2020 Elsevier B.V. |
Copyright_xml | – notice: 2020 Elsevier B.V. |
DBID | AAYXX CITATION |
DOI | 10.1016/j.ejor.2020.04.025 |
DatabaseName | CrossRef |
DatabaseTitle | CrossRef |
DatabaseTitleList | |
DeliveryMethod | fulltext_linktorsrc |
Discipline | Engineering Computer Science Business |
EISSN | 1872-6860 |
EndPage | 962 |
ExternalDocumentID | 10_1016_j_ejor_2020_04_025 S0377221720303593 |
GroupedDBID | --K --M -~X .DC .~1 0R~ 1B1 1RT 1~. 1~5 4.4 457 4G. 5GY 5VS 6OB 7-5 71M 8P~ 9JN 9JO AAAKF AABNK AACTN AAEDT AAEDW AAIAV AAIKJ AAKOC AALRI AAOAW AAQFI AARIN AAXUO AAYFN ABAOU ABBOA ABFNM ABFRF ABJNI ABMAC ABUCO ABYKQ ACAZW ACDAQ ACGFO ACGFS ACIWK ACNCT ACRLP ACZNC ADBBV ADEZE ADGUI AEBSH AEFWE AEKER AENEX AFKWA AFTJW AGHFR AGUBO AGYEJ AHHHB AHZHX AIALX AIEXJ AIGVJ AIKHN AITUG AJOXV ALMA_UNASSIGNED_HOLDINGS AMFUW AMRAJ AOUOD APLSM ARUGR AXJTR BKOJK BKOMP BLXMC CS3 DU5 EBS EFJIC EFLBG EO8 EO9 EP2 EP3 F5P FDB FIRID FNPLU FYGXN G-Q GBLVA GBOLZ HAMUX IHE J1W KOM LY1 M41 MHUIS MO0 MS~ N9A O-L O9- OAUVE OZT P-8 P-9 P2P PC. PQQKQ Q38 ROL RPZ RXW SCC SDF SDG SDP SDS SES SPC SPCBC SSB SSD SSV SSW SSZ T5K TAE TN5 U5U XPP ZMT ~02 ~G- 1OL 29G 41~ AAAKG AAQXK AATTM AAXKI AAYOK AAYWO AAYXX ABWVN ABXDB ACNNM ACRPL ACVFH ADCNI ADIYS ADJOM ADMUD ADNMO ADXHL AEIPS AEUPX AFFNX AFJKZ AFPUW AFXIZ AGCQF AGQPQ AGRNS AI. AIGII AIIUN AKBMS AKRWK AKYEP ANKPU APXCP ASPBG AVWKF AZFZN BNPGV CITATION EJD FEDTE FGOYB HVGLF HZ~ R2- RIG SEW SSH VH1 WUQ |
ID | FETCH-LOGICAL-c365t-4c62f7fc78d1690e09ec8a7b5e6b6efe4eeffba03b7ffd0dd4726d95dfa138e63 |
IEDL.DBID | AIKHN |
ISSN | 0377-2217 |
IngestDate | Thu Apr 24 23:02:35 EDT 2025 Tue Jul 01 03:28:04 EDT 2025 Fri Feb 23 02:47:22 EST 2024 |
IsPeerReviewed | true |
IsScholarly | true |
Issue | 3 |
Keywords | Container terminal operations Scheduling OR in maritime industry Constraint programming |
Language | English |
LinkModel | DirectLink |
MergedId | FETCHMERGED-LOGICAL-c365t-4c62f7fc78d1690e09ec8a7b5e6b6efe4eeffba03b7ffd0dd4726d95dfa138e63 |
ORCID | 0000-0002-5024-6186 |
PageCount | 18 |
ParticipantIDs | crossref_citationtrail_10_1016_j_ejor_2020_04_025 crossref_primary_10_1016_j_ejor_2020_04_025 elsevier_sciencedirect_doi_10_1016_j_ejor_2020_04_025 |
ProviderPackageCode | CITATION AAYXX |
PublicationCentury | 2000 |
PublicationDate | 2020-11-01 |
PublicationDateYYYYMMDD | 2020-11-01 |
PublicationDate_xml | – month: 11 year: 2020 text: 2020-11-01 day: 01 |
PublicationDecade | 2020 |
PublicationTitle | European journal of operational research |
PublicationYear | 2020 |
Publisher | Elsevier B.V |
Publisher_xml | – name: Elsevier B.V |
References | Jiang, Jin (bib0010) 2017; 98 Chen, Bostel, Dejax, Cai, Xi (bib0005) 2007; 181 Wu, Luo, Zhang, Dong (bib0024) 2013; 42 Homayouni, Tang (bib0007) 2013 Bierwirth, Meisel (bib0001) 2009; 12 Xin, Negenborn, Corman, Lodewijks (bib0025) 2015; 60 Niu, Xie, Tan, Bi, Wang (bib0020) 2016; 188 Luo, Wu, Mendes (bib0018) 2016; 94 Xin, Negenborn, Lodewijks (bib0026) 2014; 44 Homayouni, R Vasili, M Kazemi, H Tang (bib0008) 2012; 2 Kaveshgar, Huynh (bib0011) 2015; 159 Chang, Zhu, Yan, Wang (bib0004) 2017; 0 Sammarra, Cordeau, Laporte, Monaco (bib0021) 2007; 10 Lau, Zhao (bib0014) 2008; 112 Moccia, Cordeau, Gaudioso, Laporte (bib0019) 2006; 53 Zheng, Lu, Sun (bib0028) 2010 Kaysi, Maddah, Nehme, Mneimneh (bib0012) 2012; 4 Kizilay, Eliiyi, Hentenryck (bib0013) 2018; 10848 Xue, Zhang, Miao, Lin (bib0027) 2013; 22 Lu, Le (bib0017) 2014; 75 Liu, Lee, Zhang, Chu (bib0016) 2016; 93 Cao, Shi, Lee (bib0003) 2010; 15 Homayouni, Tang, Motlagh (bib0009) 2014; 270 Van Hentenryck (bib0023) 1999 Tang, Zhao, Liu (bib0022) 2014; 236 Bierwirth, Meisel (bib0002) 2015; 244 Liang, Lu, Zhou (bib0015) 2009 Chen, Langevin, Lu (bib0006) 2013; 225 Xue (10.1016/j.ejor.2020.04.025_bib0027) 2013; 22 Lu (10.1016/j.ejor.2020.04.025_bib0017) 2014; 75 Homayouni (10.1016/j.ejor.2020.04.025_bib0008) 2012; 2 Liang (10.1016/j.ejor.2020.04.025_bib0015) 2009 Van Hentenryck (10.1016/j.ejor.2020.04.025_bib0023) 1999 Niu (10.1016/j.ejor.2020.04.025_bib0020) 2016; 188 Homayouni (10.1016/j.ejor.2020.04.025_bib0007) 2013 Kizilay (10.1016/j.ejor.2020.04.025_bib0013) 2018; 10848 Moccia (10.1016/j.ejor.2020.04.025_bib0019) 2006; 53 Bierwirth (10.1016/j.ejor.2020.04.025_bib0002) 2015; 244 Xin (10.1016/j.ejor.2020.04.025_bib0026) 2014; 44 Zheng (10.1016/j.ejor.2020.04.025_bib0028) 2010 Cao (10.1016/j.ejor.2020.04.025_bib0003) 2010; 15 Lau (10.1016/j.ejor.2020.04.025_bib0014) 2008; 112 Chen (10.1016/j.ejor.2020.04.025_bib0006) 2013; 225 Jiang (10.1016/j.ejor.2020.04.025_bib0010) 2017; 98 Homayouni (10.1016/j.ejor.2020.04.025_bib0009) 2014; 270 Kaysi (10.1016/j.ejor.2020.04.025_bib0012) 2012; 4 Xin (10.1016/j.ejor.2020.04.025_bib0025) 2015; 60 Luo (10.1016/j.ejor.2020.04.025_bib0018) 2016; 94 Kaveshgar (10.1016/j.ejor.2020.04.025_bib0011) 2015; 159 Wu (10.1016/j.ejor.2020.04.025_bib0024) 2013; 42 Chen (10.1016/j.ejor.2020.04.025_bib0005) 2007; 181 Sammarra (10.1016/j.ejor.2020.04.025_bib0021) 2007; 10 Tang (10.1016/j.ejor.2020.04.025_bib0022) 2014; 236 Bierwirth (10.1016/j.ejor.2020.04.025_bib0001) 2009; 12 Chang (10.1016/j.ejor.2020.04.025_bib0004) 2017; 0 Liu (10.1016/j.ejor.2020.04.025_sbref0016) 2016; 93 |
References_xml | – volume: 270 start-page: 545 year: 2014 end-page: 556 ident: bib0009 article-title: A genetic algorithm for optimization of integrated scheduling of cranes, vehicles, and storage platforms at automated container terminals publication-title: Journal of Computational and Applied Mathematics – year: 2013 ident: bib0007 article-title: Multi objective optimization of coordinated scheduling of cranes and vehicles at container terminals publication-title: Mathematical Problems in Engineering – volume: 12 start-page: 345 year: 2009 end-page: 360 ident: bib0001 article-title: A fast heuristic for quay crane scheduling with interference constraints publication-title: Journal of Scheduling – volume: 4 start-page: 143 year: 2012 end-page: 152 ident: bib0012 article-title: An integrated model for resource allocation and scheduling in a transshipment container terminal publication-title: Transportation Letters – year: 1999 ident: bib0023 publication-title: The OPL optimization programming language – volume: 0 start-page: 1 year: 2017 end-page: 11 ident: bib0004 article-title: Integrated scheduling of handling operations in railway container terminals publication-title: Transportation Letters – volume: 15 start-page: 467 year: 2010 end-page: 474 ident: bib0003 article-title: Integrated quay crane and yard truck schedule problem in container terminals publication-title: Tsinghua Science & Technology – volume: 2 year: 2012 ident: bib0008 article-title: Integrated scheduling of sp-as/rs and handling equipment in automated container terminals publication-title: Proceedings of international conference on computers and industrial engineering, cie – volume: 98 start-page: 62 year: 2017 end-page: 75 ident: bib0010 article-title: A branch-and-price method for integrated yard crane deployment and container allocation in transshipment yards publication-title: Transportation Research Part B: Methodological – volume: 93 start-page: 720 year: 2016 end-page: 749 ident: bib0016 article-title: Bi-objective optimization for the container terminal integrated planning publication-title: Transportation Research Part B: Methodological – start-page: 406 year: 2010 end-page: 410 ident: bib0028 article-title: An effective heuristic for the integrated scheduling problem of automated container handling system using twin 40’ cranes publication-title: Proceedings of the 2010 second international conference on computer modeling and simulation – volume: 22 start-page: 21 year: 2013 end-page: 37 ident: bib0027 article-title: An ant colony algorithm for yard truck scheduling and yard location assignment problems with precedence constraints publication-title: Journal of Systems Science and Systems Engineering – volume: 236 start-page: 978 year: 2014 end-page: 990 ident: bib0022 article-title: Modeling and solution of the joint quay crane and truck scheduling problem publication-title: European Journal of Operational Research – volume: 10848 start-page: 344 year: 2018 end-page: 360 ident: bib0013 article-title: Constraint and mathematical programming models for integrated port container terminal operations publication-title: proceedings of the integration of constraint programming, artificial intelligence, and operations research – Fifteenth international conference, CPAIOR 2018, Delft, the Netherlands, June 26–29, 2018 – volume: 112 start-page: 665 year: 2008 end-page: 682 ident: bib0014 article-title: Integrated scheduling of handling equipment at automated container terminals publication-title: International Journal of Production Economics – volume: 188 start-page: 284 year: 2016 end-page: 293 ident: bib0020 article-title: Swarm intelligence algorithms for yard truck scheduling and storage allocation problems publication-title: Neurocomputing – volume: 181 start-page: 40 year: 2007 end-page: 58 ident: bib0005 article-title: A tabu search algorithm for the integrated scheduling problem of container handling systems in a maritime terminal publication-title: European Journal of Operational Research – volume: 75 start-page: 209 year: 2014 end-page: 216 ident: bib0017 article-title: The integrated optimization of container terminal scheduling with uncertain factors publication-title: Computers & Industrial Engineering – volume: 42 start-page: 13 year: 2013 end-page: 27 ident: bib0024 article-title: An integrated programming model for storage management and vehicle scheduling at container terminals publication-title: Research in Transportation Economics – volume: 159 start-page: 168 year: 2015 end-page: 177 ident: bib0011 article-title: Integrated quay crane and yard truck scheduling for unloading inbound containers publication-title: International Journal of Production Economics – volume: 10 start-page: 327 year: 2007 end-page: 336 ident: bib0021 article-title: A tabu search heuristic for the quay crane scheduling problem publication-title: Journal of Scheduling – volume: 44 start-page: 214 year: 2014 end-page: 230 ident: bib0026 article-title: Energy-aware control for automated container terminals using integrated flow shop scheduling and optimal control publication-title: Transportation Research Part C: Emerging Technologies – volume: 94 start-page: 32 year: 2016 end-page: 44 ident: bib0018 article-title: Modelling of integrated vehicle scheduling and container storage problems in unloading process at an automated container terminal publication-title: Computers & Industrial Engineering – volume: 60 start-page: 377 year: 2015 end-page: 396 ident: bib0025 article-title: Control of interacting machines in automated container terminals using a sequential planning approach for collision avoidance publication-title: Transportation Research Part C: Emerging Technologies – volume: 53 start-page: 45 year: 2006 end-page: 59 ident: bib0019 article-title: A branch-and-cut algorithm for the quay crane scheduling problem in a container terminal publication-title: Naval Research Logistics (NRL) – volume: 244 start-page: 675 year: 2015 end-page: 689 ident: bib0002 article-title: A follow-up survey of berth allocation and quay crane scheduling problems in container terminals publication-title: European Journal of Operational Research – start-page: 40 year: 2009 end-page: 45 ident: bib0015 article-title: A heuristic algorithm for integrated scheduling problem of container handling system publication-title: Proceedings of the 2009 international conference on computers industrial engineering – volume: 225 start-page: 142 year: 2013 end-page: 152 ident: bib0006 article-title: Integrated scheduling of crane handling and truck transportation in a maritime container terminal publication-title: European Journal of Operational Research – volume: 53 start-page: 45 issue: 1 year: 2006 ident: 10.1016/j.ejor.2020.04.025_bib0019 article-title: A branch-and-cut algorithm for the quay crane scheduling problem in a container terminal publication-title: Naval Research Logistics (NRL) doi: 10.1002/nav.20121 – volume: 181 start-page: 40 year: 2007 ident: 10.1016/j.ejor.2020.04.025_bib0005 article-title: A tabu search algorithm for the integrated scheduling problem of container handling systems in a maritime terminal publication-title: European Journal of Operational Research doi: 10.1016/j.ejor.2006.06.033 – volume: 93 start-page: 720 year: 2016 ident: 10.1016/j.ejor.2020.04.025_sbref0016 article-title: Bi-objective optimization for the container terminal integrated planning publication-title: Transportation Research Part B: Methodological doi: 10.1016/j.trb.2016.05.012 – volume: 2 year: 2012 ident: 10.1016/j.ejor.2020.04.025_bib0008 article-title: Integrated scheduling of sp-as/rs and handling equipment in automated container terminals – volume: 42 start-page: 13 issue: 1 year: 2013 ident: 10.1016/j.ejor.2020.04.025_bib0024 article-title: An integrated programming model for storage management and vehicle scheduling at container terminals publication-title: Research in Transportation Economics doi: 10.1016/j.retrec.2012.11.010 – volume: 60 start-page: 377 issue: Supplement C year: 2015 ident: 10.1016/j.ejor.2020.04.025_bib0025 article-title: Control of interacting machines in automated container terminals using a sequential planning approach for collision avoidance publication-title: Transportation Research Part C: Emerging Technologies doi: 10.1016/j.trc.2015.09.002 – volume: 270 start-page: 545 issue: Supplement C year: 2014 ident: 10.1016/j.ejor.2020.04.025_bib0009 article-title: A genetic algorithm for optimization of integrated scheduling of cranes, vehicles, and storage platforms at automated container terminals publication-title: Journal of Computational and Applied Mathematics doi: 10.1016/j.cam.2013.11.021 – volume: 4 start-page: 143 issue: 3 year: 2012 ident: 10.1016/j.ejor.2020.04.025_bib0012 article-title: An integrated model for resource allocation and scheduling in a transshipment container terminal publication-title: Transportation Letters doi: 10.3328/TL.2012.04.03.143-152 – volume: 225 start-page: 142 issue: 1 year: 2013 ident: 10.1016/j.ejor.2020.04.025_bib0006 article-title: Integrated scheduling of crane handling and truck transportation in a maritime container terminal publication-title: European Journal of Operational Research doi: 10.1016/j.ejor.2012.09.019 – volume: 10 start-page: 327 issue: 4 year: 2007 ident: 10.1016/j.ejor.2020.04.025_bib0021 article-title: A tabu search heuristic for the quay crane scheduling problem publication-title: Journal of Scheduling doi: 10.1007/s10951-007-0029-5 – year: 2013 ident: 10.1016/j.ejor.2020.04.025_bib0007 article-title: Multi objective optimization of coordinated scheduling of cranes and vehicles at container terminals publication-title: Mathematical Problems in Engineering doi: 10.1155/2013/746781 – volume: 75 start-page: 209 issue: Supplement C year: 2014 ident: 10.1016/j.ejor.2020.04.025_bib0017 article-title: The integrated optimization of container terminal scheduling with uncertain factors publication-title: Computers & Industrial Engineering doi: 10.1016/j.cie.2014.06.018 – volume: 159 start-page: 168 issue: Supplement C year: 2015 ident: 10.1016/j.ejor.2020.04.025_bib0011 article-title: Integrated quay crane and yard truck scheduling for unloading inbound containers publication-title: International Journal of Production Economics doi: 10.1016/j.ijpe.2014.09.028 – start-page: 406 year: 2010 ident: 10.1016/j.ejor.2020.04.025_bib0028 article-title: An effective heuristic for the integrated scheduling problem of automated container handling system using twin 40’ cranes – start-page: 40 year: 2009 ident: 10.1016/j.ejor.2020.04.025_bib0015 article-title: A heuristic algorithm for integrated scheduling problem of container handling system – volume: 10848 start-page: 344 year: 2018 ident: 10.1016/j.ejor.2020.04.025_bib0013 article-title: Constraint and mathematical programming models for integrated port container terminal operations – volume: 112 start-page: 665 issue: 2 year: 2008 ident: 10.1016/j.ejor.2020.04.025_bib0014 article-title: Integrated scheduling of handling equipment at automated container terminals publication-title: International Journal of Production Economics doi: 10.1016/j.ijpe.2007.05.015 – volume: 44 start-page: 214 issue: Supplement C year: 2014 ident: 10.1016/j.ejor.2020.04.025_bib0026 article-title: Energy-aware control for automated container terminals using integrated flow shop scheduling and optimal control publication-title: Transportation Research Part C: Emerging Technologies doi: 10.1016/j.trc.2014.03.014 – volume: 15 start-page: 467 issue: 4 year: 2010 ident: 10.1016/j.ejor.2020.04.025_bib0003 article-title: Integrated quay crane and yard truck schedule problem in container terminals publication-title: Tsinghua Science & Technology doi: 10.1016/S1007-0214(10)70089-4 – volume: 0 start-page: 1 issue: 0 year: 2017 ident: 10.1016/j.ejor.2020.04.025_bib0004 article-title: Integrated scheduling of handling operations in railway container terminals publication-title: Transportation Letters – volume: 98 start-page: 62 year: 2017 ident: 10.1016/j.ejor.2020.04.025_bib0010 article-title: A branch-and-price method for integrated yard crane deployment and container allocation in transshipment yards publication-title: Transportation Research Part B: Methodological doi: 10.1016/j.trb.2016.12.014 – volume: 94 start-page: 32 year: 2016 ident: 10.1016/j.ejor.2020.04.025_bib0018 article-title: Modelling of integrated vehicle scheduling and container storage problems in unloading process at an automated container terminal publication-title: Computers & Industrial Engineering doi: 10.1016/j.cie.2016.01.010 – volume: 236 start-page: 978 issue: 3 year: 2014 ident: 10.1016/j.ejor.2020.04.025_bib0022 article-title: Modeling and solution of the joint quay crane and truck scheduling problem publication-title: European Journal of Operational Research doi: 10.1016/j.ejor.2013.08.050 – year: 1999 ident: 10.1016/j.ejor.2020.04.025_bib0023 – volume: 244 start-page: 675 year: 2015 ident: 10.1016/j.ejor.2020.04.025_bib0002 article-title: A follow-up survey of berth allocation and quay crane scheduling problems in container terminals publication-title: European Journal of Operational Research doi: 10.1016/j.ejor.2014.12.030 – volume: 22 start-page: 21 issue: 1 year: 2013 ident: 10.1016/j.ejor.2020.04.025_bib0027 article-title: An ant colony algorithm for yard truck scheduling and yard location assignment problems with precedence constraints publication-title: Journal of Systems Science and Systems Engineering doi: 10.1007/s11518-013-5210-0 – volume: 12 start-page: 345 issue: 4 year: 2009 ident: 10.1016/j.ejor.2020.04.025_bib0001 article-title: A fast heuristic for quay crane scheduling with interference constraints publication-title: Journal of Scheduling doi: 10.1007/s10951-009-0105-0 – volume: 188 start-page: 284 issue: Supplement C year: 2016 ident: 10.1016/j.ejor.2020.04.025_bib0020 article-title: Swarm intelligence algorithms for yard truck scheduling and storage allocation problems publication-title: Neurocomputing doi: 10.1016/j.neucom.2014.12.125 |
SSID | ssj0001515 |
Score | 2.5312612 |
Snippet | •First Formulation of the Integrated Port Container Terminal Problem (IPCTP) under realistic constraints.•The IPCTP integrates the joint assignment and... |
SourceID | crossref elsevier |
SourceType | Enrichment Source Index Database Publisher |
StartPage | 945 |
SubjectTerms | Constraint programming Container terminal operations OR in maritime industry Scheduling |
Title | Constraint programming models for integrated container terminal operations |
URI | https://dx.doi.org/10.1016/j.ejor.2020.04.025 |
Volume | 286 |
hasFullText | 1 |
inHoldings | 1 |
isFullTextHit | |
isPrint | |
link | http://utb.summon.serialssolutions.com/2.0.0/link/0/eLvHCXMwnV1LSwMxEB76ANGDj6r4LDl4k7XpZpM0xyKWWrEXFbwtyWYCirZF16u_3c1utlSQHjxudgd2ZyczA_nm-wAuDCYKpeYR5bGJEqNVpFFmUaxsTDMhqSzFYO6nYvyUTJ75cwOu61kYD6sMub_K6WW2Diu94M3e4uWl90BZ0Rl6faUiThlXrAntmCnBW9Ae3t6Np8uE7Gt2eZggZeQNwuxMBfPC17mnBY1pyXjqFbP_qk8rNWe0C9uhWSTD6n32oIGzDmzUWPUO7NSaDCRs0Q5srRAM7sPE63GWKhA5CUis9-IGKfVvPknRsJIlX4QlHrau_TAgCRCZNzJfYBUinwfwNLp5vB5HQT0hypjgeZRkInbSZXJg_VEYUoXZQEvDURiBDhNE54ymzEjnLLU2kbGwilun-2yAgh1Cazaf4REQyrTVlmVFM6ISbZQRyqFkWruBldzRY-jXPkuzQC3uv-0trTFkr6n3c-r9nNIkLfx8DJdLm0VFrLH2aV7_ivRXeKRF5l9jd_JPu1PY9FfV0OEZtPKPLzwvuo_cdKF59d3vhhj7AVK728o |
linkProvider | Elsevier |
linkToHtml | http://utb.summon.serialssolutions.com/2.0.0/link/0/eLvHCXMwnV1LS8QwEB50BR8HH6vi2xy8Sd3YvDZHEWV9XlTwFpJmArvo7qLr1d9u06Y-QDx4bTLQTqYzA_nm-wAOHHKNyoqMitxl3FmdWVRFlmuf00IqqioxmJtb2Xvgl4_icQpOm1mYCKtMub_O6VW2Tk86yZudcb_fuaOs7AyjvlIZp0xoNg0zXDAVcX1H7184j1ixq6sEpbK4PU3O1CAvHIwiKWhOK77TqJf9W3X6VnHOl2ExtYrkpH6bFZjCYRtmG6R6G5YaRQaSftA2LHyjF1yFy6jGWWlATEjCYT2XC6RSv3klZbtKPtkiPImgdRtHAUkCyDyR0RjrAHldg4fzs_vTXpa0E7KCSTHJeCHzoEKhuj5ehCHVWHStcgKlkxiQI4bgLGVOheCp91zl0mvhgz1mXZRsHVrD0RA3gFBmvfWsKFsRza3TTuqAilkbul6JQDfhuPGZKRKxePy2J9MgyAYm-tlEPxvKTennTTj8tBnXtBp_7hbNUZgfwWHKvP-H3dY_7fZhrnd_c22uL26vtmE-rtTjhzvQmry84W7Zh0zcXhVnHy_43JU |
openUrl | ctx_ver=Z39.88-2004&ctx_enc=info%3Aofi%2Fenc%3AUTF-8&rfr_id=info%3Asid%2Fsummon.serialssolutions.com&rft_val_fmt=info%3Aofi%2Ffmt%3Akev%3Amtx%3Ajournal&rft.genre=article&rft.atitle=Constraint+programming+models+for+integrated+container+terminal+operations&rft.jtitle=European+journal+of+operational+research&rft.au=Kizilay%2C+Damla&rft.au=Hentenryck%2C+Pascal+Van&rft.au=Eliiyi%2C+Deniz+T.&rft.date=2020-11-01&rft.pub=Elsevier+B.V&rft.issn=0377-2217&rft.eissn=1872-6860&rft.volume=286&rft.issue=3&rft.spage=945&rft.epage=962&rft_id=info:doi/10.1016%2Fj.ejor.2020.04.025&rft.externalDocID=S0377221720303593 |
thumbnail_l | http://covers-cdn.summon.serialssolutions.com/index.aspx?isbn=/lc.gif&issn=0377-2217&client=summon |
thumbnail_m | http://covers-cdn.summon.serialssolutions.com/index.aspx?isbn=/mc.gif&issn=0377-2217&client=summon |
thumbnail_s | http://covers-cdn.summon.serialssolutions.com/index.aspx?isbn=/sc.gif&issn=0377-2217&client=summon |