Relocation Scheduling in a Two-Machine Flow Shop with Resource Recycling Operations

This paper considers a variant of the relocation problem, which is formulated from an urban renewal project. There is a set of jobs to be processed in a two-machine flow shop subject to a given initial resource level. Each job consumes some units of the resource to start its processing on machine 1...

Full description

Saved in:
Bibliographic Details
Published inMathematics (Basel) Vol. 9; no. 13; p. 1527
Main Authors Lo, Ting-Chun, Lin, Bertrand M. T.
Format Journal Article
LanguageEnglish
Published Basel MDPI AG 01.07.2021
Subjects
Online AccessGet full text
ISSN2227-7390
2227-7390
DOI10.3390/math9131527

Cover

Loading…
Abstract This paper considers a variant of the relocation problem, which is formulated from an urban renewal project. There is a set of jobs to be processed in a two-machine flow shop subject to a given initial resource level. Each job consumes some units of the resource to start its processing on machine 1 and will return some amount of the resource when it is completed on machine 2. The amount of resource released by a job is not necessarily equal to the amount of resource acquired by the job for starting the process. Subject to the resource constraint, the problem is to find a feasible schedule whose makespan is minimum. In this paper, we first prove the NP-hardness of two special cases. Two heuristic algorithms with different processing characteristics, permutation and non-permutation, are designed to construct feasible schedules. Ant colony optimization (ACO) algorithms are also proposed to produce approximate solutions. We design and conduct computational experiments to appraise the performances of the proposed algorithms.
AbstractList This paper considers a variant of the relocation problem, which is formulated from an urban renewal project. There is a set of jobs to be processed in a two-machine flow shop subject to a given initial resource level. Each job consumes some units of the resource to start its processing on machine 1 and will return some amount of the resource when it is completed on machine 2. The amount of resource released by a job is not necessarily equal to the amount of resource acquired by the job for starting the process. Subject to the resource constraint, the problem is to find a feasible schedule whose makespan is minimum. In this paper, we first prove the NP-hardness of two special cases. Two heuristic algorithms with different processing characteristics, permutation and non-permutation, are designed to construct feasible schedules. Ant colony optimization (ACO) algorithms are also proposed to produce approximate solutions. We design and conduct computational experiments to appraise the performances of the proposed algorithms.
Author Lin, Bertrand M. T.
Lo, Ting-Chun
Author_xml – sequence: 1
  givenname: Ting-Chun
  surname: Lo
  fullname: Lo, Ting-Chun
– sequence: 2
  givenname: Bertrand M. T.
  orcidid: 0000-0003-0456-296X
  surname: Lin
  fullname: Lin, Bertrand M. T.
BookMark eNptkVtLwzAUx4MoOOee_AIFH6WaWy95lOF0MBls8zmk6cma0TUz7Rj79sZOZIiBQw6H3_mf2w26bFwDCN0R_MiYwE9b1VWCMJLQ7AINKKVZnIX45Zl_jUZtu8HhBTDnYoCWC6idVp11TbTUFZT72jbryDaRilYHF78rXdkGokntDtGycrvoYLsqWkDr9l5DcPRR9ynzHfhep71FV0bVLYx-_iH6mLysxm_xbP46HT_PYs1S3sVGY2o4N7zIMdWFwEpgxoACSYtcCZGojLAwjsFEJQRwUtKywJrnYCAnOmVDND3plk5t5M7brfJH6ZSVfcD5tVS-s7oGKXipDYdQKxjgTAnALC0SnFCeEKqD1v1Ja-fd5x7aTm7CgE1oX9KEC56HRnigHk6U9q5tPZjfqgTL7yPIsyMEmvyhte36FXVe2frfnC9ulouZ
CitedBy_id crossref_primary_10_3390_app122211512
crossref_primary_10_1016_j_swevo_2025_101843
crossref_primary_10_3390_math11194060
Cites_doi 10.1080/00207169108803998
10.1063/1.4825749
10.1080/10611860500411100
10.1016/S0167-5060(08)70356-X
10.1287/inte.18.6.14
10.1016/j.ijpe.2008.04.009
10.1007/978-3-319-26580-3
10.1016/j.tcs.2011.04.034
10.1016/0377-2217(88)90030-6
10.1016/j.cor.2010.07.015
10.1016/j.ejor.2007.11.035
10.1080/00207168808803664
10.1016/S0167-6377(97)00007-2
10.1080/00207729208949397
10.1016/j.disopt.2006.06.003
10.1080/07408178608975351
10.1002/(SICI)1520-6750(199810)45:7<705::AID-NAV4>3.0.CO;2-F
10.1016/S0377-2217(98)00204-5
10.1002/nav.3800010110
10.1007/s10951-015-0455-8
10.12693/APhysPolA.130.1439
10.1016/S0305-0548(97)00055-5
10.1080/00207543.2017.1314040
10.1007/s10951-009-0151-7
10.1016/S0377-2217(98)00196-9
10.1177/239980838601300101
10.1016/j.cie.2015.08.014
ContentType Journal Article
Copyright 2021 by the authors. Licensee MDPI, Basel, Switzerland. This article is an open access article distributed under the terms and conditions of the Creative Commons Attribution (CC BY) license (https://creativecommons.org/licenses/by/4.0/). Notwithstanding the ProQuest Terms and Conditions, you may use this content in accordance with the terms of the License.
Copyright_xml – notice: 2021 by the authors. Licensee MDPI, Basel, Switzerland. This article is an open access article distributed under the terms and conditions of the Creative Commons Attribution (CC BY) license (https://creativecommons.org/licenses/by/4.0/). Notwithstanding the ProQuest Terms and Conditions, you may use this content in accordance with the terms of the License.
DBID AAYXX
CITATION
3V.
7SC
7TB
7XB
8AL
8FD
8FE
8FG
8FK
ABJCF
ABUWG
AFKRA
ARAPS
AZQEC
BENPR
BGLVJ
CCPQU
DWQXO
FR3
GNUQQ
HCIFZ
JQ2
K7-
KR7
L6V
L7M
L~C
L~D
M0N
M7S
P62
PHGZM
PHGZT
PIMPY
PKEHL
PQEST
PQGLB
PQQKQ
PQUKI
PTHSS
Q9U
DOA
DOI 10.3390/math9131527
DatabaseName CrossRef
ProQuest Central (Corporate)
Computer and Information Systems Abstracts
Mechanical & Transportation Engineering Abstracts
ProQuest Central (purchase pre-March 2016)
Computing Database (Alumni Edition)
Technology Research Database
ProQuest SciTech Collection
ProQuest Technology Collection
ProQuest Central (Alumni) (purchase pre-March 2016)
Materials Science & Engineering Collection
ProQuest Central (Alumni)
ProQuest Central UK/Ireland
Advanced Technologies & Aerospace Collection
ProQuest Central Essentials
AUTh Library subscriptions: ProQuest Central
Technology collection
ProQuest One Community College
ProQuest Central Korea
Engineering Research Database
ProQuest Central Student
SciTech Premium Collection
ProQuest Computer Science Collection
Computer Science Database
Civil Engineering Abstracts
ProQuest Engineering Collection
Advanced Technologies Database with Aerospace
Computer and Information Systems Abstracts – Academic
Computer and Information Systems Abstracts Professional
Computing Database
Engineering Database
ProQuest Advanced Technologies & Aerospace Collection
ProQuest Central Premium
ProQuest One Academic (New)
Publicly Available Content Database
ProQuest One Academic Middle East (New)
ProQuest One Academic Eastern Edition (DO NOT USE)
ProQuest One Applied & Life Sciences
ProQuest One Academic
ProQuest One Academic UKI Edition
Engineering Collection
ProQuest Central Basic
DOAJ Directory of Open Access Journals
DatabaseTitle CrossRef
Publicly Available Content Database
Computer Science Database
ProQuest Central Student
Technology Collection
Technology Research Database
Computer and Information Systems Abstracts – Academic
ProQuest One Academic Middle East (New)
Mechanical & Transportation Engineering Abstracts
ProQuest Advanced Technologies & Aerospace Collection
ProQuest Central Essentials
ProQuest Computer Science Collection
Computer and Information Systems Abstracts
ProQuest Central (Alumni Edition)
SciTech Premium Collection
ProQuest One Community College
ProQuest Central
ProQuest One Applied & Life Sciences
ProQuest Engineering Collection
ProQuest Central Korea
ProQuest Central (New)
Advanced Technologies Database with Aerospace
Engineering Collection
Advanced Technologies & Aerospace Collection
Civil Engineering Abstracts
ProQuest Computing
Engineering Database
ProQuest Central Basic
ProQuest Computing (Alumni Edition)
ProQuest One Academic Eastern Edition
ProQuest Technology Collection
ProQuest SciTech Collection
Computer and Information Systems Abstracts Professional
ProQuest One Academic UKI Edition
Materials Science & Engineering Collection
Engineering Research Database
ProQuest One Academic
ProQuest One Academic (New)
ProQuest Central (Alumni)
DatabaseTitleList CrossRef
Publicly Available Content Database

Database_xml – sequence: 1
  dbid: DOA
  name: Directory of Open Access Journals (DOAJ)
  url: https://www.doaj.org/
  sourceTypes: Open Website
– sequence: 2
  dbid: 8FG
  name: ProQuest Technology Collection
  url: https://search.proquest.com/technologycollection1
  sourceTypes: Aggregation Database
DeliveryMethod fulltext_linktorsrc
Discipline Mathematics
EISSN 2227-7390
ExternalDocumentID oai_doaj_org_article_94dcf4ef4bef4e07a9e036b50524512c
10_3390_math9131527
GroupedDBID -~X
5VS
85S
8FE
8FG
AADQD
AAFWJ
AAYXX
ABDBF
ABJCF
ABPPZ
ABUWG
ACIPV
ACIWK
ADBBV
AFKRA
AFZYC
ALMA_UNASSIGNED_HOLDINGS
AMVHM
ARAPS
AZQEC
BCNDV
BENPR
BGLVJ
BPHCQ
CCPQU
CITATION
DWQXO
GNUQQ
GROUPED_DOAJ
HCIFZ
IAO
K6V
K7-
KQ8
L6V
M7S
MODMG
M~E
OK1
PHGZM
PHGZT
PIMPY
PQQKQ
PROAC
PTHSS
RNS
3V.
7SC
7TB
7XB
8AL
8FD
8FK
FR3
JQ2
KR7
L7M
L~C
L~D
M0N
P62
PKEHL
PQEST
PQGLB
PQUKI
Q9U
PUEGO
ID FETCH-LOGICAL-c364t-fc02f44f4b802cb90a9033e2e16b8a995a713315f01a51e05d2db0c48efe81c63
IEDL.DBID DOA
ISSN 2227-7390
IngestDate Wed Aug 27 01:20:21 EDT 2025
Fri Jul 25 12:08:48 EDT 2025
Tue Jul 01 02:58:02 EDT 2025
Thu Apr 24 22:57:29 EDT 2025
IsDoiOpenAccess true
IsOpenAccess true
IsPeerReviewed true
IsScholarly true
Issue 13
Language English
License https://creativecommons.org/licenses/by/4.0
LinkModel DirectLink
MergedId FETCHMERGED-LOGICAL-c364t-fc02f44f4b802cb90a9033e2e16b8a995a713315f01a51e05d2db0c48efe81c63
Notes ObjectType-Article-1
SourceType-Scholarly Journals-1
ObjectType-Feature-2
content type line 14
ORCID 0000-0003-0456-296X
OpenAccessLink https://doaj.org/article/94dcf4ef4bef4e07a9e036b50524512c
PQID 2549483154
PQPubID 2032364
ParticipantIDs doaj_primary_oai_doaj_org_article_94dcf4ef4bef4e07a9e036b50524512c
proquest_journals_2549483154
crossref_primary_10_3390_math9131527
crossref_citationtrail_10_3390_math9131527
ProviderPackageCode CITATION
AAYXX
PublicationCentury 2000
PublicationDate 2021-07-01
PublicationDateYYYYMMDD 2021-07-01
PublicationDate_xml – month: 07
  year: 2021
  text: 2021-07-01
  day: 01
PublicationDecade 2020
PublicationPlace Basel
PublicationPlace_xml – name: Basel
PublicationTitle Mathematics (Basel)
PublicationYear 2021
Publisher MDPI AG
Publisher_xml – name: MDPI AG
References Kaplan (ref_15) 1988; 18
Lin (ref_29) 2015; 90
Brucker (ref_2) 1999; 112
Herroelen (ref_4) 1998; 25
Ibadov (ref_6) 2013; 1558
(ref_7) 2016; 130
Lin (ref_26) 2008; 115
Johnson (ref_11) 1954; 1
Hall (ref_25) 1986; 18
Cheng (ref_20) 2017; 55
Lin (ref_24) 1999; 116
Kononov (ref_28) 2010; 13
Cheng (ref_19) 2009; 192
Shafransky (ref_30) 1998; 45
Lin (ref_12) 2006; 37
Xie (ref_16) 1997; 21
Amir (ref_17) 1988; 25
Issa (ref_5) 2020; 5
Graham (ref_14) 1979; 5
ref_23
Habibi (ref_3) 2018; 3
ref_1
Kaplan (ref_8) 1986; 13
Kaplan (ref_10) 1988; 35
Lin (ref_22) 1992; 23
Sevastyanov (ref_27) 2011; 412
Lin (ref_31) 2016; 19
ref_9
Cheng (ref_13) 2012; 39
Kononov (ref_18) 2006; 3
Lin (ref_21) 1991; 40
References_xml – volume: 40
  start-page: 1
  year: 1991
  ident: ref_21
  article-title: Some results of the relocation problems with processing times and deadlines
  publication-title: Int. J. Comput. Math.
  doi: 10.1080/00207169108803998
– ident: ref_9
– volume: 3
  start-page: 55
  year: 2018
  ident: ref_3
  article-title: Resource-constrained project scheduling problem: Review of past and recent developments
  publication-title: J. Proj. Manag.
– volume: 1558
  start-page: 1298
  year: 2013
  ident: ref_6
  article-title: Fuzzy ordering of the factors affecting the implementation of construction projects in Poland
  publication-title: AIP Conf. Proc.
  doi: 10.1063/1.4825749
– volume: 37
  start-page: 27
  year: 2006
  ident: ref_12
  article-title: On the relocation problem with a second working crew for resource recycling
  publication-title: Int. J. Syst. Sci.
  doi: 10.1080/10611860500411100
– volume: 5
  start-page: 287
  year: 1979
  ident: ref_14
  article-title: Optimization and approximation in deterministic sequencing and scheduling: A survey
  publication-title: Ann. Discret. Math.
  doi: 10.1016/S0167-5060(08)70356-X
– volume: 18
  start-page: 14
  year: 1988
  ident: ref_15
  article-title: OR hits the heights: Relocation planning at the orient heights housing project
  publication-title: Interfaces
  doi: 10.1287/inte.18.6.14
– volume: 115
  start-page: 55
  year: 2008
  ident: ref_26
  article-title: Maximizing the reward in relocation problems with generalized due dates
  publication-title: Int. J. Prod. Econ.
  doi: 10.1016/j.ijpe.2008.04.009
– ident: ref_1
  doi: 10.1007/978-3-319-26580-3
– volume: 412
  start-page: 4536
  year: 2011
  ident: ref_27
  article-title: Tight complexity analysis of the relocation problem with arbitrary release dates
  publication-title: Theor. Comput. Sci.
  doi: 10.1016/j.tcs.2011.04.034
– volume: 35
  start-page: 201
  year: 1988
  ident: ref_10
  article-title: A fast feasibility test for relocation problems
  publication-title: Eur. J. Oper. Res.
  doi: 10.1016/0377-2217(88)90030-6
– volume: 39
  start-page: 1206
  year: 2012
  ident: ref_13
  article-title: Resource-constrained flowshop scheduling with separate resource recycling operations
  publication-title: Comput. Oper. Res.
  doi: 10.1016/j.cor.2010.07.015
– volume: 192
  start-page: 1008
  year: 2009
  ident: ref_19
  article-title: Johnson’s rule, composite jobs and the relocation problem
  publication-title: Eur. J. Oper. Res.
  doi: 10.1016/j.ejor.2007.11.035
– volume: 25
  start-page: 101
  year: 1988
  ident: ref_17
  article-title: Relocation problems are hard
  publication-title: Int. J. Comput. Math.
  doi: 10.1080/00207168808803664
– ident: ref_23
– volume: 21
  start-page: 39
  year: 1997
  ident: ref_16
  article-title: Polynomial algorithms for single machine scheduling problems with financial constraints
  publication-title: Oper. Res. Lett.
  doi: 10.1016/S0167-6377(97)00007-2
– volume: 23
  start-page: 1433
  year: 1992
  ident: ref_22
  article-title: Relocation problems of maximizing new capacities under a common due date
  publication-title: Int. J. Syst. Sci.
  doi: 10.1080/00207729208949397
– volume: 3
  start-page: 366
  year: 2006
  ident: ref_18
  article-title: On relocation problems with multiple identical working crews
  publication-title: Discret. Optim.
  doi: 10.1016/j.disopt.2006.06.003
– volume: 18
  start-page: 220
  year: 1986
  ident: ref_25
  article-title: Scheduling problems with generalized due dates
  publication-title: IIE Trans.
  doi: 10.1080/07408178608975351
– volume: 45
  start-page: 705
  year: 1998
  ident: ref_30
  article-title: The open shop scheduling problem with a given sequence of jobs on one machine
  publication-title: Nav. Res. Logist.
  doi: 10.1002/(SICI)1520-6750(199810)45:7<705::AID-NAV4>3.0.CO;2-F
– volume: 112
  start-page: 3
  year: 1999
  ident: ref_2
  article-title: Resource-constrained project scheduling: Notation, classification, models, and methods
  publication-title: Eur. J. Oper. Res.
  doi: 10.1016/S0377-2217(98)00204-5
– volume: 1
  start-page: 61
  year: 1954
  ident: ref_11
  article-title: Optimal two- and three-stage production schedules with setup times included
  publication-title: Nav. Res. Logist. Q.
  doi: 10.1002/nav.3800010110
– volume: 19
  start-page: 153
  year: 2016
  ident: ref_31
  article-title: Relocation scheduling subject to fixed processing sequences
  publication-title: J. Sched.
  doi: 10.1007/s10951-015-0455-8
– volume: 130
  start-page: 1439
  year: 2016
  ident: ref_7
  article-title: KASS v. 2.2. scheduling software for construction with optimization criteria description
  publication-title: Acta Phys. Pol. A
  doi: 10.12693/APhysPolA.130.1439
– volume: 25
  start-page: 279
  year: 1998
  ident: ref_4
  article-title: Resource-constrained project scheduling: A survey of recent developments
  publication-title: Comput. Oper. Res.
  doi: 10.1016/S0305-0548(97)00055-5
– volume: 55
  start-page: 3326
  year: 2017
  ident: ref_20
  article-title: Demonstrating Johnson’s algorithm via resource-constrained scheduling
  publication-title: Int. J. Prod. Res.
  doi: 10.1080/00207543.2017.1314040
– volume: 13
  start-page: 123
  year: 2010
  ident: ref_28
  article-title: Minimizing the total weighted completion time in the relocation problem
  publication-title: J. Sched.
  doi: 10.1007/s10951-009-0151-7
– volume: 5
  start-page: 117
  year: 2020
  ident: ref_5
  article-title: A survey in the resource-constrained project and multi-project scheduling problems
  publication-title: J. Proj. Manag.
– volume: 116
  start-page: 183
  year: 1999
  ident: ref_24
  article-title: Minimizing the weighted number of tardy jobs and maximum tardiness in relocation problem
  publication-title: Eur. J. Oper. Res.
  doi: 10.1016/S0377-2217(98)00196-9
– volume: 13
  start-page: 5
  year: 1986
  ident: ref_8
  article-title: Relocation models for public housing redevelopment programs
  publication-title: Environ. Plan. B Plan. Des.
  doi: 10.1177/239980838601300101
– volume: 90
  start-page: 39
  year: 2015
  ident: ref_29
  article-title: Resource-constrained scheduling with optional recycling operations
  publication-title: Comput. Ind. Eng.
  doi: 10.1016/j.cie.2015.08.014
SSID ssj0000913849
Score 2.1723168
Snippet This paper considers a variant of the relocation problem, which is formulated from an urban renewal project. There is a set of jobs to be processed in a...
SourceID doaj
proquest
crossref
SourceType Open Website
Aggregation Database
Enrichment Source
Index Database
StartPage 1527
SubjectTerms Algorithms
Ant colony optimization
flow shop
heuristic algorithms
Heuristic methods
Integer programming
Job shops
Literature reviews
Mathematics
Optimization
Permutations
Relocation
relocation problem
resource recycling
resource-constrained scheduling
Schedules
Scheduling
Temporary housing
SummonAdditionalLinks – databaseName: ProQuest Technology Collection
  dbid: 8FG
  link: http://utb.summon.serialssolutions.com/2.0.0/link/0/eLvHCXMwfV3dS8MwEA9-vOiD-InTKXnYk1CWtulHnkTFKcIUnMLeSnK9bIKs003E_95c1k1F8aFQ0is0d5fcR66_Y6wVicxkIdCprhWBzLUJDGRU01AmEGUJCg_H0L1Nrx_lTT_p1wm3SV1WOd8T_UZdVkA58jYFMjKPncU_Hb8E1DWKTlfrFhrLbDV0lob0PO9cLXIshHmZSzX7LS920X3beYFDN0i9XH8YIo_X_2s79jams8k2aueQn82kucWWcLTN1rsLZNXJDuvdI5kfYifvOYaXVEk-4E8jrvnDexV0fXEk8s5z9c57w2rMKdPK51l6dwMf4F-5G-NM-pNd9ti5fLi4DurGCAHEqZwGFkRkpbTS5CICo4RWIo4xwjA1uVYq0RR6hokVoU5CFEkZlUaAzNFiHkIa77GVUTXCfcYx1omRpVUALtRLU61FpkHbTBiDClWDncy5VECNGk7NK54LFz0QS4tvLG2w1oJ4PAPL-JvsnNi9ICGEaz9QvQ6KesEUSpZgJbo5ugvdRyl0xtZQ3z3pnBRosOZcWEW97CbFl5Ic_P_4kK1FVJzi626bbGX6-oZHzruYmmOvQp9FINBV
  priority: 102
  providerName: ProQuest
Title Relocation Scheduling in a Two-Machine Flow Shop with Resource Recycling Operations
URI https://www.proquest.com/docview/2549483154
https://doaj.org/article/94dcf4ef4bef4e07a9e036b50524512c
Volume 9
hasFullText 1
inHoldings 1
isFullTextHit
isPrint
link http://utb.summon.serialssolutions.com/2.0.0/link/0/eLvHCXMwrV3PS8MwFA46L3oQf-J0jhx2Eoppm_7I0cmqCJuyKXgrSfqiwuiGmwz_e_PSbkwUvHgolPBKyvfa9_Klr98jpBOwRCW-xq-6hnk8lcpTOsGahiLSQRIBc3IM_UF8-8TvnqPntVZfWBNWyQNXwF0KXmjDwXBlD2CJFGCDrsL-a9wmK43Rlwm2RqZcDBZ-mHJR_ZAXWl5_add_r3YQu7h-S0FOqf9HIHbZJdsju_WykF5Vt7NPNqA8IDv9labq7JCMhoCJB4GkIwt1gTXkL_StpJI-LiZe35VFAs3GkwUdvU6mFPdY6XJ_3p7oT-0uuZ9C5ffZEXnKeo_Xt17dEsHTYcznntEsMJxbNFIWaCWYFCwMIQA_VqkUIpJIOv3IMF9GPrCoCArFNE_BQOrrODwmjXJSwgmhEMpI8cIIrS3Ji2MpLbhamoQpBQJEk1wsUcp1rReObSvGueUNCGm-BmmTdFbG00om43ezLsK9MkFtazdgPZ7XHs__8niTtJbOyusXbpYjz-WpnYSf_sccZ2Q7wOIVV5fbIo35-wec29XHXLXJZprdtMlWtzd4GLbdY_cFi07bxQ
linkProvider Directory of Open Access Journals
linkToHtml http://utb.summon.serialssolutions.com/2.0.0/link/0/eLvHCXMwtV1LT9wwEB7R5dD2UJU-xFIKPsClUoTjOA8fKlRaVkthl4pdJG6p7YyhEtos7FYr_hS_sZ48llateuMQKXKcyJkZe2Y84_kAdgRPTRpaiuo6HshMm8DYlHIaitiKNEZelWMYDJP-ufx6EV-swH17FobSKts1sVqoi9LSHvkeOTIyi7zG35_eBIQaRdHVFkKjFotjvFt4l2328eiL5--uEL3D8ed-0KAKBDZK5DxwlgsnpZMm48IaxbXiUYQCw8RkWqlYk98Wxo6HOg6Rx4UoDLcyQ4dZaJPIf_cJrEo60dqB1YPD4bez5a4OVdnMpKoPAkaR4nve7rzyjYQe-4fqqxAC_lIAlVbrvYQXjTnKPtXyswYrOHkFzwfLWq6z1zA6Q1J4xEA28iwuKHf9kv2YMM3GizIYVOmYyHrX5YKNrsopo71d1sYF_I29s9Urp1Os5W32Bs4fhWhvoTMpJ7gODCMdG1k4Za13LpNEa55qq13KjUGFqgsfWirltqlTTnAZ17n3V4ik-W8k7cLOsvO0Ls_x724HRO5lF6qpXTWUt5d5M0VzJQvrJPp_9Bf6QSn06t0Q0p_0ZpHtwmbLrLyZ6LP8QSw3_v94G572x4OT_ORoePwOnglKjamyfjehM7_9ie-9bTM3W41AMfj-2DL8C97XDk0
linkToPdf http://utb.summon.serialssolutions.com/2.0.0/link/0/eLvHCXMwtV1Lb9QwEB6VIiE4IJ5ioYAP5YIUrWM7Dx8QAkpoKVsQ20q9BdsZt0jVZukuWvWv8evwOMkCAnHrIVKUOFEy89kzY4_nA9gWvLBF6mhV1_NElcYm1hWU09BkThQZ8liOYXKQ7x6p98fZ8Qb8GPbCUFrlMCbGgbppHc2RjymQUaUMFn_s-7SITzvVy_m3hBikaKV1oNPoILKPF6sQvi1e7O0EXT8Tonp7-GY36RkGEidztUy848Ir5ZUtuXBWc6O5lCgwzW1ptM4MxXBp5nlqshR51ojGcqdK9FimLpfhvVfgaiELTYFfWb1bz-9Qvc1S6W5LoJSaj4MHehouEo_sH0YwcgX8ZQqifatuwc3eMWWvOiTdhg2c3YEbk3VV18VdmH5GMn2kSjYNym4oi_2EfZ0xww5XbTKJiZnIqrN2xaan7ZzRLC8bVgjCibtw8ZGPc-yQt7gHR5cisvuwOWtn-AAYSpNZ1XjtXAgz89wYXhhnfMGtRY16BM8HKdWur1hOxBlndYhcSKT1byIdwfa68bwr1PHvZq9J3OsmVF07XmjPT-q-s9ZaNc4rDP8YDgwfpTEYekucfyo4SG4EW4Oy6r7LL-pfAH34_9tP4VpAbv1h72D_EVwXlCMT03-3YHN5_h0fBydnaZ9ENDH4ctnw_Ql3oBEd
openUrl ctx_ver=Z39.88-2004&ctx_enc=info%3Aofi%2Fenc%3AUTF-8&rfr_id=info%3Asid%2Fsummon.serialssolutions.com&rft_val_fmt=info%3Aofi%2Ffmt%3Akev%3Amtx%3Ajournal&rft.genre=article&rft.atitle=Relocation+Scheduling+in+a+Two-Machine+Flow+Shop+with+Resource+Recycling+Operations&rft.jtitle=Mathematics+%28Basel%29&rft.au=Ting-Chun+Lo&rft.au=Bertrand+M.+T.+Lin&rft.date=2021-07-01&rft.pub=MDPI+AG&rft.eissn=2227-7390&rft.volume=9&rft.issue=13&rft.spage=1527&rft_id=info:doi/10.3390%2Fmath9131527&rft.externalDBID=DOA&rft.externalDocID=oai_doaj_org_article_94dcf4ef4bef4e07a9e036b50524512c
thumbnail_l http://covers-cdn.summon.serialssolutions.com/index.aspx?isbn=/lc.gif&issn=2227-7390&client=summon
thumbnail_m http://covers-cdn.summon.serialssolutions.com/index.aspx?isbn=/mc.gif&issn=2227-7390&client=summon
thumbnail_s http://covers-cdn.summon.serialssolutions.com/index.aspx?isbn=/sc.gif&issn=2227-7390&client=summon